Loading...
2012, 08-07 Permit: SW-12001924 SewerSPOKANE COUNTY BUILDING AND PLANNING PERMIT Application Number: SW -12001924 Permit Issued Date: 08/07/2012 Expiration Date: 08/08/2012 Project Description: SEWER CONNECTION Project Name: SOUTH GREEN ACRES - INCLUDES ADDRESS 18424 E MAXWELL Permit Type: SEWER Primary Contact: C H D INC Applicant: C H D INC Address' Phone: Email: PO BOX 13717 SPOKANE, WA 99213 509-926-5229 SITE INFORMATION: Site Address: Parcel Number: 18422 E MAXWELL AVE 55181.2326 Subdivision: PLAT A Assessor's Description: VALLEY VIEW ADD W24' OF N130' OF LT 6 & E66.33' OF N130' OF L7 BLK 10 Inspection Area: Water District: Consolidated Irrigation District #19 Zoning: Land Area: 11700 Square Feet Owner: PRICE-BALCH, LLC Address: 8420 E MARINGO DR SPOKANE, WA 99212 Phone: Email: Fire District: Spokane Valley Fire CONTRACTOR INFORMATION: General Contractor CHDIN**126LC C D INC PO BOX 13717 SPOKANE, WA 99213 509-926-5229 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION 1 $125.00 $125.00 FEE DETAIL: Processing - Utilities Utilities Permit Total Fee: $125.00 $25.94 $125.00 $150.94 CONDITIONS: Inside Public Transit Benefit Area CALL 1-800-424-5555 BEFORE YOU DIG—AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. Date Printed. 08/07/2012 10:46:42 Printed by: IIS APPPOOLWSP.NET v4.0 SPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW -12001924 08/07/2012 Exoiration Date: 08/08/2012 FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 08/07/2012 10.46 42 Printed by: IIS APPPOOLASP NET v4.0