2015, 03-17 Permit App: APR-2015-0019 ApproachSp�kti
Valleya
Community Development Department
Permit Center
11703 East Sprague Avenue, Suite B-3
Spokane Valley, WA 99206
Tel: (509) 720-5240
Fax: (509) 688-0037
permitcenter@spokanevalley.org
(Staff Use Only)
PERMIT NUMBER:
PERMIT FEE:
APPROACH PERMIT APPLICATION
PROJECT ADDRESS: 3q 20 A ASlA I V,L)START DATE: � ' ���`iiNJvv
/i ' / 20i/S
TICIPATED COMPLETION DATE:
BUILDING OWNER NAME:
4,4
3//9/2ci
MAILING ADDRESS:
7h
CITY: ez1c l%�.,V-t' �/�
CONTACT - PERSON NAME: SA
PHONE:
j:. r
STATE:
50(1— 76 ' W7.-3 7.-3 FAX:
6z/20 /d
CELL:
CONTRACTOR NAME: F-/(4-‘,..)0,-- S J % C..
MAILING ADDRESS:
J3 /4 / 3
CITY:
PHONE:
STATE: f 4
`4 0C/- J ? / 2 - 1/ FAX: 60 q. --
ZIP:
CELL:
CONTRACTOR LICENSE #: r- )e:1_63 yt33 /(Vv EXPIRES:
❑ Residential Driveway
❑ Existing Curb & Gutter
❑ Culvert Installation
❑ Other Conditions:
CITY BUSINESS LICENSE #:
PROJECT DESCRIPTION (Please Provide Site Sketch)
❑ Commercial/Industrial Driveway
❑ Rural Road Section
❑ Sidewalk Repair/Con tract N 'IC`111 1
.j
proloct ,4771 -000
Bond/Insurance certification must be on file with the cityt.
.Suhrt"` u "~
DISCLAIMER
The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) The City of Spokane Valley permit is not a permit or approval for any violation of federal, state or
local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted and subsequently approved
before this application can be processed.
Signature
Date:
DE -001: V-1 Page 1 of 2
APPROACH PERMIT APPLICATION
REQUIRED SKETCH INFORMATION
Provide required measurements (in sketch boxes), and include street name.
Check all existing conditions that apply:
❑Sidewalk
ft wide
ft from back of curb
❑Streetside Swale
❑Drainage Ditch
❑Drywell (show location on sketch)
❑Other (please describe below)
Lu1
ZI
CURB
J
w
z�
ri
crl
ai
Oi
QI
0_I
EDGE OF
ASPHALT
DISTANCE FROM
NEAREST PROPERTY LINE
MBE LEFT OR RIGHT SIDE)
FT (SEE TABLE)
CONCRETE
APPROACH
k-4'–wk—THROAT WIDTH E'FT-4-4' -I
WING (SEE TABLE) WING
STREET NAM E
.df\a(. hi" 1,3
STREET WITH CURB
DISTANCE FROM
NEAREST PROPERTY LINE
MAY BE LEFT OR RIGHT SIDE)
FT (SEE TABLE)
ASPHALT
APPROACH
CURB
RETURN
N1
IF CORNER LOT,
DISTANCE FROM
clap RETURN
FT (SEE TABLE)
THROAT WIDTH n FT —4
(SEE TABLE)
STREET NAM E
STREET WITH ASPHALT EDGE
RA DI US
RETURN
NIF CORNER LOT,
DISTANCE FROM
RADIUS RETURN
TTFT(SEE TABLE)
Approach Requirements:
• Maximum 2 approaches per property frontage; one on arterials.
• Total width of aonroaches not to exceed 50% of frontage width.
DE -001: V-1
Page 2 of 2
Residential Approaches
Commercial
Approaches
Distance from Curb/Radius Return
15' minimum
75' minimum
Separation between Approaches (measured from centerline to centerline of
each approach)
None specified
See Page 7-27
in City Street Standards
Throat Width (flat portion)
16' min., 30' max.
30' min., 40' max.
Wing Width (at curb line)
4 feet typical
4 feet typical
Minimum Distance from Side Property Line (@ r/w)
5.0'
5.0'
Minimum Distance from Crosswalk
5'
5'
DE -001: V-1
Page 2 of 2