2012, 07-12 Permit: SW-12001749 SewerSPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Application Number: SW -12001749
Permit Issued Date:
07/12/2012
Expiration Date:
Project Description: SEWER CONNECTION
Project Name: SO GREEN ACRES PH IV
Permit Type: SEWER
Primary Contact: LARRY MILLER EXCAVATING
Applicant: LARRY MILLER EXCAVATING
Address: 7117 E RUTTER AVE
SPOKANE, WA 99212
Phone: 509-218-3335
Email:
SITE INFORMATION:
Site Address:
Parcel Number:
18601 E MAXWELL AVE
55181.1908
Subdivision: PLATA
Assessor's Description: VALLEY VIEW ADD S1/2 L4 B9
Inspection Area:
Water District:
Consolidated Irrigation
District #19
Zoning: Land Area: 14948 Square Feet
Owner:
Address:
Phone:
Email:
ALDENDORF, MALINDA R
18601 E MAXWELL AVE
GREENACRES, WA 99016-8538
Fire District: Spokane Valley Fire
CONTRACTOR INFORMATION;
General Contractor
LARRYME918DR
LARRY MILLER EXCAVATING
7117 E RUTTER AVE
SPOKANE, WA99212
509-218-3335
DETAILS:
Class
Type
Quantity Unit Charge Value
SEWER SEWER CONNECTION 1 $125.00 $125.00
FEE DETAIL'
Processing - Utilities
Utilities Permit
Total Fee:
$125.00
$25.94
$125.00
$150.94
CONDITIONS
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
Date Printed: 07/12/2012 14:58:33
Printed by: IIS APPPOOLVASP.NET v4.0
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW -12001749 07/12/2012
Expiration Date:
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 07/12/2012 14:58.33
Printed by: IIS APPPOOLWSP.NET v4.0