Loading...
2007, 08-06 Permit: 07002875 Pole BldgSpokane e� jValley BUILDING DIVISION 1 Site Information 11707 E. Sprague Avenue. Suite 106 Spokane Valley, WA 99206 Project Information Site Address: 717 N MCDONALD RD Parcel Number: 45153.0601 Subdivision: Block: Lot: Zoning: UR -3 Urban Residential 3.5 Owner: MORRIS, ANTHONY A Address: 717 N MCDONALD RD SPOKANE VALLEY, WA 99216 Building Inspector: DOUG POWELL Water Dist: MODERN Project Number: 07002875 Inv: 1 Issue Date: 08/06/2007 Permit Use: 24 X 24X 12 POLE BLDG Applicant: SKI CONSTRUCTION 4719 E WINFIELD CT SPOKANE, WA 99021 Phone: (509) 328-3011 Contact: SKI CONSTRUCTION 4719 E WINFIELD CT SPOKANE, WA 99021 Phone: (509) 328-3011 Setbacks - Front: Left: Right: Rear: Group Name: Project Name: IPermits I Building Permit Contractor: SKI CONSTRUCTION License 4: SKICOL•976JB POLE BDLG Total Value: FOR BUILDING INSPECTIONS CALL (509) 688-0054. U-1 VB 576 RESIDENTIAL PERMIT FEE $195.25 ACCESSORY PLANS REVIEW $48 81 $10.944.00 WSBC SURCHARGE $4 50 Total Permit Fee:. $248.56 Payment Summary Total Fees AmountPaid AmountOwing 5248.56 $248.56 $0.00 Tran Date Receipt # 08/06/2007 Processed By: Main, Jodi L Printed By: TURBAK, MIKE Page 1 of 1 10719 Payment Amt $248.56 PERMIT NOTICE The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the applicant/permittee that the use described on the front of this permit complies with applicable codes and that required inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before progressing beyond the point where inspections are required may necessitate removal of certain parts of the construction at the applicant's/permittee's or property owner's expense. At a minimum, the following inspections ARE REQUIRED by City Code: FOOTING — when forms and reinforcement are in place and prior to placement of concrete -all structures, including manufactured homes. NOTE: This inspection includes review of the structure's setback from property lines. Minimum setbacks are established by City of Spokane Valley Ordinance. Curb lines and fence lines are not necessarily Indicative of property lines. The responsibility to comply with applicable setback provisions lies solely with the permittee -neither the City of Spokane Valley nor its authorized representatives assume any responsibility for the venfication or location of your property lines. Please verify their location prior to locating your structure. Failure to properly locate the structure may require its relocation at the owner's/permittee's expense FOUNDATION — when forms and reinforcement are in place and prior to placement of concrete. PLUMBING — after rough -in, before covering, and final. MECHANICAL — rough -in of piping, before covering. metal chimneys before concealment, and final. FRAMING — after all framing. bracing and blocking is in place, rough electrical, plumbing and mechanical systems are complete, and prior to concealing. FINAL — when complete and prior to occupancy and/or use. All permits require final Inspection. NOTE: In addition to inspection of the structure, this Inspection includes review of site improvements (typically depicted on the approved site plan) required by ordinance or as a condition of approval of this permit. Items such as the installation of fire hydrants, fire department access, on-site drainage ('208' swales), road improvements, parking and landscaping are common requirements of a permit/site plan which must be completed prior to final approval of a building or issuance of a Certificate of Occupancy. - MANUFACTURED HOMES — Final Inspection required when complete, stairs, handrails, skirting, etc. installed, and prior to occupancy: completed inspection record card must be available on site. PLUMBING REVERSALS FOR SEWER CONNECTIONS — prior to cover. RIGHT-OF-WAY/APPROACH — prior to placement of concrete/asphalt or, if gravel approach, after completion. In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc must be inspected prior to cover. Check with the Building department for "special inspections" in conjunction with commercial projects. FOR INSPECTIONS Please give one working day/24 hour notice. Different parts of your project may require permits and inspections from more than one agency. Building, plumbing (Includes interior reversals for sewer) and mechanical, City of Spokane Valley Building Division 688-0054 Road cuts for utilities or driveways, City of Spokane Valley Public Works 688-0195 or State Dept of Transportation 324-6000 Permits and inspections for eiectncal wring. Stale Department of Labor Permits and inspections for Sewer Connection. Spokane County Utilities Dmsion And Industries 324.2640 477-3604 Permits and inspections for on-site septic systems. Spokane Regional Fire spnnkler and alarm systems and pnvate access road inspections. Spokane Valley Health Distnct 324-1560 Fire Department 892-4122 State taw RCW 19 122 requires that pnor to any eacavabon the -CALL BEFORE YOU DIG'centermust be notified. Call before you dig at least 2 working days in advance, 456.8000 PERMIT EXPIRATION AND REFUNDS All permits shall expire by limitation and be declared void if a) work Is not started within 180 days of obtaining a permit, or b) work is abandoned for 180 days or more after beginning work, or c) after two years from the date of permit issuance, regardless of whether the work is finished. If a permit is expired for time, a new permit may be obtained for half the permit fee based on the value of the remainder of the work to finish the original permit. All refund requests must be made in writing by the origi payment. 100% refunds will be granted for anyauthorized when no work has been done under when an application is withdrawn or cancellle I. Owner / Agent pr e permittee t oneously paid ermit issued R to the plan rev' o t a Building Official no later than 180 days after the date of fee o collected. Refunds of not more than 80% of a permit fee may be nds of not more than 80% of a plan review fee paid may be authorized being completed. Date Staff Approval Date