2012, 05-15 Permit: SW-12001344 SewerSPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Application Number: SW -12001344
Permit Issued Date:
05/15/2012
Expiration Date:
Project Description: SEWER CONNECTION
Project Name: TRENTWOOD
Permit Type: SEWER
Primary Contact: BRAATEN, DUSTIN O/SCOTT, JAMIE R
Applicant: BRAATEN, DUSTIN O/SCOTT, JAMIE R
Address: 4325 N MCDONALD RD
SPOKANE VALLEY, WA 99216
Phone:
Email:
SITE INFORMATION:
Site Address: 4325 N MCDONALD RD Owner: BRAATEN, DUSTIN O/SCOTT, JAMIE R
Parcel Number: 45032.9117 Address: 4325 N MCDONALD RD
SPOKANE VALLEY, WA 99216
Subdivision: SP -1140-97 Phone:
Assessor's Description: 03-25-44 TR A OF SP97-1140 AUDITOR'S Email:
#4128784 BK 14 PG 72 BEING A PTN OF SE1/4 OF
NW1/4
Inspection Area:
Water District: Trentwood Fire District: Fire District 1
Irrigation District #3
Zoning: Land Area: 0.3903 acres / 17001 sqft
CONTRACTOR INFORMATION:
General Contractor
OWNER
OWNER
NOT KNOWN AT TIME OF ENTRY
UNKNOWN, UK 00000
DETAILS:
Class
Type
Quantity Unit Charge Value
SEWER
SEWER CONNECTION 1 $125.00 $125.00
FEE DETAIL:
Processing - Utilities
Utilities Permit
Total Fee:
$125.00
$25.94
$125.00
$150 94
CONDITIONS:
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
Date Printed 05/15/2012 12:53.50
Printed by: 118 APPPOOLWSP.NET v4.0
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW -12001344 - 05/15/2012
Expiration Date:
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 05/15/2012 12:53:50
Printed by. 115 APPPOODASP.NET v4 0