Loading...
2012, 05-15 Permit: SW-12001344 SewerSPOKANE COUNTY BUILDING AND PLANNING PERMIT Application Number: SW -12001344 Permit Issued Date: 05/15/2012 Expiration Date: Project Description: SEWER CONNECTION Project Name: TRENTWOOD Permit Type: SEWER Primary Contact: BRAATEN, DUSTIN O/SCOTT, JAMIE R Applicant: BRAATEN, DUSTIN O/SCOTT, JAMIE R Address: 4325 N MCDONALD RD SPOKANE VALLEY, WA 99216 Phone: Email: SITE INFORMATION: Site Address: 4325 N MCDONALD RD Owner: BRAATEN, DUSTIN O/SCOTT, JAMIE R Parcel Number: 45032.9117 Address: 4325 N MCDONALD RD SPOKANE VALLEY, WA 99216 Subdivision: SP -1140-97 Phone: Assessor's Description: 03-25-44 TR A OF SP97-1140 AUDITOR'S Email: #4128784 BK 14 PG 72 BEING A PTN OF SE1/4 OF NW1/4 Inspection Area: Water District: Trentwood Fire District: Fire District 1 Irrigation District #3 Zoning: Land Area: 0.3903 acres / 17001 sqft CONTRACTOR INFORMATION: General Contractor OWNER OWNER NOT KNOWN AT TIME OF ENTRY UNKNOWN, UK 00000 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION 1 $125.00 $125.00 FEE DETAIL: Processing - Utilities Utilities Permit Total Fee: $125.00 $25.94 $125.00 $150 94 CONDITIONS: CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. Date Printed 05/15/2012 12:53.50 Printed by: 118 APPPOOLWSP.NET v4.0 SPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW -12001344 - 05/15/2012 Expiration Date: INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 05/15/2012 12:53:50 Printed by. 115 APPPOODASP.NET v4 0