2012, 08-09 Permit: SW-12001944 SewerSPOKANE COUNTY BUILDING AND PLANNING
COUNT)!
PERMIT
Application Number: SW -12001944
Permit Issued Date:
08/09/2012
Expiration Date: 08/10/2012
Project Description:
Project Name:
Permit Type:
SEWER CONNECTION
TRENTWOOD
SEWER
Primary Contact
Applicant:
Address:
Phone:
Email:
H & S CONSTRUCTION
H & S CONSTRUCTION
11817 E VALLEYWAY AVE
SPOKANE, WA 99206
509-926-8964
SITE INFORMATION'
Site Address:
Parcel Number:
Subdivision
Assessor's Description:
Inspection Area:
Zoning:
4407 N MCDONALD RD
45032.1204
HARRIS SUBDIVISION
HARRIS SUBDIVISION PHASE 1; TR A OF SP 93-
938 AUD #9411080140 BK 11 PG 50 & 51; BEING
A PTN OF LT 1 BLK 1
Owner:
Address:
Phone:
Email:
HARRIS, MICHAEL E & LIDA R
4407 N MCDONALD RD
SPOKANE, WA 99216-2204
Water District: Trentwood Fire District: Spokane Valley Fire
Irrigation District #3
Land Area: 0.4 Acre(s)
CONTRACTOR INFORMATION:
General Contractor
HSCON"123KF
H & S CONSTRUCTION
11817 E VALLEYWAY AVE
SPOKANE, WA 99206
509-926-8964
DETAILS:
Class
Type
Quantity Unit Charge Value
SEWER SEWER CONNECTION
FEE DETAIL:
Processing - Utilities
Utilities Permit
1 $125.00 $125.00
Total Fee:
$125.00
$25.94
$125.00
$150.94
CONDITIONS:
Inside Public Transit Benefit Area
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
Date Printed: 08/09/2012 12:09:31
Printed by: IIS APPPOOLWSP.NET v4.0
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW -12001944 08/09/2012
Expiration Date: 08/10/2012
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Pnnted. 08/09/2012 12:09.31
Printed by. IIS APPP0OLVISP.NET v4 0