Loading...
2012, 04-19 Permit: SW-12001157 SewerSPOKANE COUNTY BUILDING AND PLANNING PERMIT Application Number: SW -12001157 Permit Issued Date: 04/19/2012 Expiration Date: Project Description: SEWER CONNECTION Primary Contact: KALIN EXCAVATION Applicant: KALIN EXCAVATION Permit Type: SEWER Address: 9229 E WOOLARD RD COLBERT, WA 99005 Phone: 509-954-9101 Email: SITE INFORMATION: Site Address: Parcel Number: Subdivision: Assessor's Description Inspection Area: 4412 N MCDONALD RD 45031.1408 TRENTWOOD ORCHARDS TRENTWOOD ORCHARDS BLK 44 EXC 51401& EXC N390' & EXC W5' Owner: Address: Phone: Email: AUBREY, JOSEPH E 4412 N MCDONALD RD SPOKANE, WA 99216-1209 Water District: Trentwood Fire District. Fire District 1 Irrigation District #3 Zoning: Land Area: 0.6191 acres / 26969 sqft CONTRACTOR INFORMATION: General Contractor KALINE*0431B KALIN EXCAVATION 9229 E WOOLARD RD COLBERT, WA 99005 509-954-9101 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION FEE DETAIL: Processing - Utilities Utilities Permit 1 $125.00 $125.00 Total Fee: $125 00 $25.94 $125.00 $150.94 CONDITIONS: Inside Public Transit Benefit Area CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. Date Printed: 04/19/2012 10.34.27 Printed by. 115 APPPOOLIASP.NET v4.0 SPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW -12001157 04/19/2012 Expiration Date: FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 04/19/2012 10 34.27 Printed by: 115 APPPOOLIASP.NET v4.0