Loading...
2010, 02-04 Permit App: 10000268 Garage AdditionPrdject Number: 10000268 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 2/4/2010 Page 1 of 2 Project Information: Permit Use: 15 X 15 GARAGE ADDITION Setbacks: Front Left: Right: Rear: Site Information: Plat Key: 005774 Name: SP -1043-95 Contact: NAZAR, STANISANY OR NADEZHEA Address: 4521 N MCDONALD RD C - S - Z: SPOKANE VALLEY, WA 99216-2250 Phone: (509) 893-1393 Group Name: Project Name: District: Nort Parcel Number: 45032.9116 Block: SiteAddress: 4521 N MCDONALD RD Location:: CSV Zoning: R-3 Water District: 001 SF Res District TRENTWOOD Area: .33 Acres Width: 100 Nbr of Bldgs: 2 Nbr of Dwellings: 1 Lot: D Owner: Name: Address: NAZAR, STANISANY OR NADEZH 4521 N MCDONALD RD SPOKANE VALLEY, WA 99216-225 Hold: ❑ Depth: 131 Right Of Way (ft): 50 Review bi formation • Review Building Plan Review Released By:: Originally Released: Landuse/Zoning/HE Conditions Permits: 2/3/2010 By: tmelbourn Released Originally Released: 2/3/2010 By: mpalaniuk Operator: JD Printed By: JD Print Date: 2/4/2010 Prdject Number: 10000268 Inv: 1 Application THIS IS NOTFA PERMIT Penalties will be assessed for commencing work without a permit Date: 2/4/2010 Page 2 of 2 Contractor: OWNER Building Permit Firm: OWNER Phone: (000) 000-0000 This Application: Total Project: Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation GAR WOOD U-1 VB 225 $4,275.00 225 $4,275.00 Totals: 225 $4,275.00 225 $4,275.00 Item Description Units Unit Desc Fee Amount RESIDENTIAL PERMIT FEE 1 SELECT $111.25 WSBCC SURCHARGE 1 SELECT $4.50 SF PLNS RVW < 7999 SQ FT 1 SELECT $44.50 Permit Total Fees: $160.25 Notes: , Payment Summary• Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing - Building Permit $160.25 $160.25 $50.10 $110.15 $160.25 $160.25 $50.10 $110.15 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: JD Printed By: JD Print Date: 2/4/2010 Permit Center Scmrr 11703 E Sprague Ave, Suite B-3 pokane Spokane Valley, WA 99206 (509)688-0036 FAX: (509)688-0037 www.sookanevallev.org Dalley PERMIT NUMBER: 07.21t) PERMIT FEE: Community Development Residential Construction New Construction Permit Application Addition/Remodel Other: Accessory Bldg Deck SITE ADDRESS: 415,19-1 r"' , /1-1 Do .n /d 8 . sl. io,& -'A2 Dae,. 972/s ASSESSORS PARCEL NO: LEGAL DESCRIPTION: (� BO: Puaildinieg Ow` ner.- ::.; 1 Cont_ actor •,.�`- , ,.;,-•s_`.. ,�_....J :;rFSat-.: fr _G Names/a,r/Qj% ,,teC ear Name: C/Le-A---,252-0--Th Address: Address: Gr efl/1„(e aorta/c-/ tp City:5 t (24_142 id" State&a Zip:W2/6 // City: State: Zip: P1rnc C 9) A9? /157-e Fax: Phone: Fax: SQ. FTG: A_.) /1-4- Contractor Lic No: Exp Date: COIItBCt PC//��SOIIf •-.'•_ "-<',' <');{c"<i'. .=a ° �:a'�- =.'. +r`- PR/SLOPES ON OPERTYY:: City Business Lic. No: TYPE: HEAT S yRys_ SEWER OR SEPTIC? Name: 5��WL/ Vct5 car Phone:(WC?) 7/O 7/0 —I t a— Describe the scope of w rk in detail: Cost of Project: $ /gip© 0_0 Proposed Use: tl **************The following MUST be complete: (write N/A if not applicable)********************** HEIGHT TO PEAK: 7' DIMENSIONS: 1 5- 1 x /,S/ # OF STORIES: / TOTAL HABITABLE SPACE: co MAIN FLOOR TO SQ. FTG: o y�Cie 2' FLOOR SQ. FTG: `/ UNFIN,BASEEMEE►NT SQ. FTG_ : / `' / i ' IMPERVIOUS SURFACE AREA: e / ✓ti! SQ. FTG: A_.) /1-4- ETri5-) S/ #f \CONST`RU/CTION DECK/C/11 7 (,�SQ. FTG: PR/SLOPES ON OPERTYY:: # OF BEDf20%X: TYPE: HEAT S yRys_ SEWER OR SEPTIC? The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before this application can be processed. SIGNATURE: 5' XJO, 'cJ DATE: 02' —0/0 Method of Payment: ❑ Cash ❑ Check • 0 Mastercard ❑ VISA Bankcard #: Expires: VIN#: Authorized Signature: REVISED 2115/07 RESIDENTIAL CHECK LIST DIRECTIONS: Place a check mark in box next to each document required for complete submittal. o SITE PLAN o Property lines and dimensions o Direction arrow pointing North and orientation to streets o Proposed/existing buildings (footprint and dimensions) o Utilities, septic tank/drain field locations and distances o Setbacks to property lines ❑ Distance between buildings o Right of way/easement location & sizes o Driveway approach size and location BUILDING PLANS (3 SETS) (minimum 1/8 inch scale or completely dimensioned) O Elevations (Front/Rear/Sides) with roof peak and wall height including basement: Foundation Plan (crawlspace, basement or slab on grade): o Footing sizes and locations o Supporting wood cripple walls or beams o Perimeter concrete foundation wall sizes o Thickened concrete pads supporting' o Crawlspace ventilation o Floor Plan of each level (finished or unfinished) with dimensio o Floor Joist direction, size and spacing o Header, beam or concrete lintel sizes o Brace wall panel locations o Water heater and furnace locations o Exhaust fan locations o Deck or concrete patio sizes and locations Roof Plan: • -o Engineered truss direction and spacing o Rafter and over frame direction, size and spacing —all Section Detail including: Roof o Slope/ roofing material/ underlayment/ ice dam protection o Sheathing size and type Ceiling 'Joist size and spacing Wall ,e'Height/ top plate/ stud size and spacing/ sole plate o Exterior sheathing size and type Floor ;Joist size and spacing Foundation Wall o Concrete or Masonry unit width o Earth to wood separation distance Footing o Size Radon o Passive system with 6mil vapor barrier Miscellaneous Construction Details ❑ Deck: o Floor plan/ side view/ dimensions o Floor Joist/ decking direction, size and spacing o Stairway tread rise & run and nosing beams or girder trusses ns: '• o Window and door location and sizes o Window well locations if applicable o Room usage labels o Smoke detector locations o Attic and crawl space access locations o Fire -Wall construction o Ridge, eave and valley lines o -Beam and girder size and location o Truss or rafter size, spacing & connection o Attic insulation/ air space baffle/ ventilation o Size of ceiling gypsum wall board o Siding/ exterior house wrap/ anchor bolts o Insulation, vapor barrier, gypsum wall board o Sheathing or concrete floor size/ insulation o Footing bottom to finished ground level depth o Horizontal & vertical reinforcement if any o Reinforcement if any o Active system with 6 mil vapor barrier o Footings/ post/ and beam size and locations O Handrail / Guard height & spacing Spokane .0#Valley® For City Use Only e/ PLUS Project Number IC )7(n tj Project Address (-47.1 • tY1 ( i r�VVxJO( 11703 E Sprague, Ave Suite B-3 1 Spokane Valley WA 99296 - • 509.688.0036 ♦ Fax:.509:688.0037♦'permitcenter@spokanevattey,org As part of our on-going . commitment to •customer service during -the' review- process of your.::project application, we are providing you with a TARGET DATE. for the initial •technical application review. If for, any reason we cannot meet this date, we will contact you with a revised target date. • • Your application review TARGET DATr2_E is �1'4 t 1 0 The TARGET DATE is the date we estimate your project application will have hadrits initial technical review. It is not the date for_approval or permit issuance. Tips for a Smoother Project Application Review : i Submit complete, accurate plans andhdocuments. E.rr/yr./1nm nut); be petpured fa• rc-submittals as project application teviei'ers T1011., on multiple applications and it naw be several days before they can look cit your new or revised information.' i Designate a specific contact person to communicate with the City.. {While the person designated as the applrccnrt's contact Person with the'Citi' cavi he changed, one individual with the expertise for dealing with reviewer conanents irould be the best elflike)rir tbe"entire review process:- ' i Call staff regarding the status of your; project only after the target date shown at the'top'of the,page.• �` Although you .should he contacted on or by the target date, please feel free to contact us 1/ vou'haven 7 beard front us by your targe/ dale. Staff only contact you before the target dwell the initial review is complete. Br. following this procedure. you will save time and allow the reviewers to complete the work -more erpeditiausly. . Steps in the Permit Process 1. Counter Complete. Your application, has been accepted. as counter 'complete. This means, all, of the required documents, as indicated on your Pre -Application Checklist have been submitted or, have been 'approved ;for. deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical'reView. 2. Quality Check. The next step in the process is a quality i:heck to.make siire that the, application isireviewable and.free' from substantive•flaws that Would prevent technical staff froni completing.the4teehnieal review once if is started. When this step is complete., your application will be routed to the appropriate staff and, remain' iri their review queue'until it comes up for review. . 3. Technical Compliance. Once an, application is administratively complete, it is routed to techmeal_ staff foCcompliance' review. Depending on the type of projeci,'technical staff May inefude mdltiple.rev'kwers. Yoti should be contacted by ' phone, fax, email, or mail by. your TARGET DATE once the initial technical:compliance review is complete. ' 4. Permit Issuance. When the technical compliance review of, the application,is corrtplete, including any subsequentle-- submittals, each reviewer will approve their section of the application and route ii to the Permit Center. When 'all sections - of the application are received, a Permit Specialist will process the application and contact the person specified on.your• application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by' • the Permit Specialist at that time. . _ - WHITE - APPLICANT PINK -BUILDING FILE REV9/07 L. • Pi: tl N DEf APPROVE@-_- • • _DATE. ! v 1 Are - j.. 1 , --r - _- 1._i- . I _4 i I ! I ; ,_-t- 1 1 ; T ! 7r-- , • -I- I I 1 I , •