2009, 05-06 Permit App: 09001196 GarageProject Number: 09001196 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 5/6/2009 Page 1 of 2
Project Information:
Permit Use: 1080 SQFT GARAGE Contact: DAVISSON, BRIAN
Address: 4615 N MCDONALD RD
C - S - Z: SPOKANE, WA 99216
Setbacks: Front Left: Right: Rear: Phone: (509) 535-4194
Group Name:
Site Information: Project Name
Plat Key: 999999 Name: Range
District: Nort
Parcel Number: 45032.9055
Block: Lot:
SiteAddress: 4615 N MCDONALD RD
Location:: CSV
Zoning: R-3
Water District:
Area: .00 Acres
SF Res District
Width: 0
Owner: Name: DAVISSON, BRIAN
Address: 4615 N MCDONALD RD
SPOKANE, WA 99216
Hold: ❑
Depth: 0 Right Of Way (ft): 0
Nbr of Bldgs: 1 Nbr of Dwellings: 1
Review Information:
Review
Building Plan Review
?Released By:- --
Originally Released:
Septic Sys Review
5/6/2009 By: tmelbourn
. Relea'sedBy:-
Originally Released: 5/6/2009 By: LHALSEY
Landuse/Zoning/HE Conditions
Permits •
Originally Released: 5/5/2009 By: tschmidt
Operator: JD Printed By: jmm
Print Date: 5/6/2009
Project Number: 09001196 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 5/6/2009 Page 2 of 2
Contractor: OWNER
Building Permit
Firm: OWNER
Phone: (000) 000-0000
This Application: Total Project:
Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation
GARAGE U-1 VB 1,056 $20,064.00 1,056 520,064.00
Item Description
RESIDENTIAL PERMIT FEE
WSBCC SURCHARGE
SF PLNS RVW <7999 SQ FT
Notes:
Totals: 1,056 520,064.00 1,056 $20,064.00
Units Unit Desc Fee Amount
1 SELECT $335.25
1 SELECT $4.50
1 SELECT 5134.10
Permit Total Fees: $473.85
Payment Summary:
Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing
Building Permit $473.85 $473.85 $134.10 $339.75
$473.85 $473.85 $134.10 $339.75
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: JD Printed By: jmm
Print Date: 5/6/2009
°'okan�
• Walley.
Community Development
Residential Construction
Permit Application
Permit Center
11703 E Sprague Ave, Suite B-3
Spokane Valley, WA 99206
(509)688-0036 FAX: (509)688-0037
www. spoka neva I ley. org
PERMIT NUMBER: l — 49(0
PERMIT FEE:
New Construction
Addition/Remodel Deck
Other:
Fl Accessory Bldg
SITE ADDRESS:
/5 A' /%*2 L //a
ASSESSORS PARCEL NO: LEGAL DESCRIPTION:
"tf±.rFs.�—'.-. . ,v.•:-.'-'w,Cm.v5n. a..:
Buildiii-al4e: r .#
-' "r -w" 0.:: i.Y�1. Q1••.t�s • •}:"f=- ,_ y�amPiM1.I` nn�__a... ar.;._4 -- ..-.Xu-r., �Aw'k�',.�ir�i,,:
tContractbr
Name: V��i2pni t4(1°SSO rd
Name:
Address`. y6/5- // fife agaje('
Address:
City: sAt,i4ir4 V State: 6(/M Zip:dl/n.2/(P
City: State: Zip:
Phone: 7 6/ j Fax:
O
Phone: Fax:
DECK/COV. PATIO SQ. FTG:
Contractor Lic No: Exp Date:
Contact;Eerstiti_:,,.,°�-,j';.E=-_ r��.:r,
CONSTRUCTION TYPE:
City Business Lic. No:
SEWER OR SEPTIC?
Name: �,&gn) //.)2SS0^`)
Phone: 900-412- ? 2 -
Des ribe the scope wQrk in detail:
Cost of Project: $29,66
evwf
Proposed Use: coned
**************The following MUST be complete: (write N/A if not applicable)**********************
HEIGHT TO PEAK:
DIMENSIONS:
# OF STORIES:
TOTAL HABITABLE SPACE:
MAIN FLOOR TO SQ.
FTG:
2"u FLOOR SQ. FTG:
UNFIN BASEMENT SQ. FTG:
IMPERVIOUS SURFACE
AREA:
FINISHED BASEMENT
SQ. FTG:
GARAGE TG:
IoSc:.
DECK/COV. PATIO SQ. FTG:
30% SLOPES ON
PROPERTY:
# OF BEDROOMS:
CONSTRUCTION TYPE:
HEAT SOURCE:
SEWER OR SEPTIC?
The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or
local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before
this application can be
processed.
SIGNATURE: ice// • tA_
Method of Payment:
❑ Cash
Bankcard #:
Authorized Signature:
REVISED 2n 5/a7
0 Check
❑ Mastercard
Expires:
DATE: S Y- % CEIVED BY
CITY OF SPOKANE t/ALLEY
MAY 0 5 2009
0 VISA
VIN#:
BY:
RESIDENTIAL CHECK LIST DIRECTIONS:
Place a check mark in box next to each document required for complete submittal.
o SITE PLAN
o Property lines and dimensions
o Direction arrow pointing North and orientation to streets
o Proposed/existing buildings (footprint and dimensions)
o Utilities, septic tank/drain field locations and distances
o Setbacks to property lines
o Distance between buildings
o Right of way/easement location & sizes
o Driveway approach size and location
BUILDING PLANS (3 SETS) (minimum 1/8 inch scale or completely dimensioned)
❑ Elevations (Front/Rear/Sides) with roof peak and wall height including basement:
❑ Foundation Plan (crawlspace, basement or slab on grade)
o Footing sizes and locations
o Perimeter concrete foundation wall sizes
o Crawlspace ventilation
o Supporting wood cripple walls or beams
o Thickened concrete pads supporting
beams or girder trusses
❑ Floor Plan of each level (finished or unfinished) with dimensions:
o Floor Joist direction, size and spacing o Window and door location and sizes
❑ Header, beam or concrete lintel sizes 0 Window well locations if applicable
o Brace wall panel locations
o Water heater and furnace locations
❑ Exhaust fan locations
o Deck or concrete patio sizes and locations
❑ Roof Plan:
o Engineered truss direction and spacing
o Rafter and over frame direction, size and spacing
❑ Wall Section Detail including:
Roof
o Slope/ roofing material/ underlayment/ ice dam protection
o Sheathing size and type
Ceiling
o Joist size and spacing
Wall
o Height/ top plate/ stud size and spacing/ sole plate
o Exterior sheathing size and type
Floor
o Joist size and spacing
Foundation Wall
o Concrete or Masonry unit width
o Earth to wood separation distance
Footing
o Size
Radon
o Passive system with 6mil vapor barrier
Miscellaneous Construction Details
❑ Deck:
o Floor plan/ side view/ dimensions
o Floor Joist/ decking direction, size and spacing
❑ Stairway tread rise & run and nosing
❑ Room usage labels
o Smoke detector locations
❑ Attic and crawl space access locations
o Fire Wall construction
o Ridge, eave and valley lines
o Beam and girder size and location
o Truss or rafter size, spacing & connection
o Attic insulation/ air space baffle/ ventilation
o Size of ceiling gypsum wall board
o Siding/ exterior house wrap/ anchor bolts
o Insulation, vapor barrier, gypsum wall board
o Sheathing or concrete floor size/ insulation
o Footing bottom to finished ground level depth
o Horizontal & vertical reinforcement if any
o Reinforcement if any
o Active system with 6 mil vapor barrier
o Footings/ post/ and beam size and locations
O Handrail / Guard height & spacing
Spokane
Walley
• For City Use Only •
PLUS Project Number net (Y) 1 IG b
Project Address. •' r' -
•
(o)S :A) ./Y1r r)nni :rt' .
- 11703 E Sprague Ave'Suite B -• 'Spokane Valley WA 99206 -
509.688.0036 ♦ Fax: 509.688.0037 ♦ permhfcenter@spokanevalley.org
As'.part' of our on-going commitment to customer_ service during'_ the:'review process 'Of yourproject,
application, we are providing you with a TARGET DATE for the initial, technical; application`,review.:If for
any reason we cannot meet this date,:we will contact.you with a revised target' date.. ', -.`
Your application review TARGET DATE is' '.I \1 '1'6?\
The TARGET ,DATE is the date: we estimate your; project` application will have. had its initiat technical,
review: It is not.the,date for approval. or permit issuance. ' '
Tips for a Smoother Prosect Application Review
Submit complete, accurate plans and documents. - 1 .
Erna time,mav be eeyun•ed.Jor, re -submittals as project.application reviewers work on multiple applications' and it .
may be several days before they can look at your new or revised information: -` -
i Designate a specific contact person to communicate with the City.
While the persbn designated,as the applicant's contact person with the City can'be,changed one individual, with the
erpertise.for dealing frith reviewer'comnrents would be the. hest choice for the entire review:pro'cesc..-
i Call •
staff regarding the status of your project only after the target date shown at the top of the page. • .
Although you should.be contacted -on or by the target date, please feel free to contact us if jibli haven'1 heard from us '
by your target date. Staff may contact you before the target date if the' initial review . complete: Bt' follownig this •
procedure, you will wive tiine and alloiv'the /eviewers' to, complete the work more cvpeditiousli'. '. ' -
•
Steps in the Permit Process-
•
1. Counter Complete. Your application._ has been accepted 'as counter complete. This means all of the' required' '
documents, as indicated on your Pre -Application Checklist have been Submitted or have .been: approved :for deferred
submittal. This does not prevent technical staff from requesting additional infonnation'as a result of their tecknical review. '
2. Quality Check, The next step in the process is a quality check to make -sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from- completing.the•technical review once it is:started. When •
this step is complete, your application will be routed to the appropriate staff and, remain in. their review queue until .it
comes up for review.. ' _ ,
3. Technical Compliance. Once an application, is administratiJely.complete„it is routed to technical staff for -compliance
review. Depending. on the, type of project,' technical staff may include, multiple reviewers. You should be contacted by
phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete.-,:.. •
4. Permit Issuance,. When the technical compliance review of the application is complete, including'any subsequent re -
submittals, each reviewer will approve their section' of the application and route it to the Permit. Center. Wh'enalt sections
of the'application are received, a Permit Specialist will process the•application and,contaet the person specified ,on.your
application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE -APPLICANT PINK - BUILDING FILE
REV 9/07
CLJ
1
c
\�I
1"'
3)
5110
PLANNING DE'B'T. APPROVED V
BY %.
DATE. Sf sf cq
Li&IS— N. MctoNAth 4,