Loading...
2009, 06-11 Permit App: 09001621 Pole BldgPtoject Number: 09001621 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 6/11/2009 Page 1 oft Project Information: Permit Use: 30 x 40 POLE BLDG w/ 10 x 40 LEAN-TO Setbacks: Front Left: Right: Rear: Site Information: Plat Key: 999999 Name: Range Contact: MATTOON, M L Address: 5113 N MCDONALD RD C - S - Z: SPOKANE, WA 99216-3037 Phone: (509) 939-1834 Group Name: Project Name: District: Nort Parcel Number: 46343.9119 Block: SiteAddress: 5113 N MCDONALD RD Location:: CSV Zoning: 12-3 SF Res District Water District: 001 TRENTWOOD Area: 1.23 Acres Width: 74 Nbr of Bldgs: 0 Nbr of Dwellings: 10 Lot: Owner: Name: MATTOON, M L Address: 5113 N MCDONALD RD SPOKANE, WA 99216-3037 Review Information: L Hold: ❑ Depth: 130 Right Of Way (ft): 0 Review Building Plan Review Released By: _ Originally Released: Driveway/Approach 6/8/2009 By: tmelbourn Released By: NOT REQUIRED Originally Released: Septic Sys Review 6/11/2009 By: JLMain Released By: Originally Released: Landuse/Zoning/HE Conditions 6/11/2009 By: LHALSEY Released By: Operator: JD Originally Released: Printed By: jmm 6/9/2009 By: tschmidt Print Date: 6/11/2009 Project Nsmber: 09001621 Inv: 1 Permits: , . . Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 6/11/2009 Page 2 of 2 Contractor: OWNER Description Grp Type Notes POLE BDLG U-1 VB Building Permit Finn: OWNER Phone: (000) 000-0000 This Application: Total Project: Sci Ft Valuation Sq Ft Valuation 1,600 $30,400.00 1,600 $30,400.00 Totals: 1,600 $30,400.00 1,600 $30,400.00 Item Description Units Unit Desc RESIDENTIAL PERMIT FEE 1 SELECT ACCESSORY PLANS REVIEW 1 SELECT WSBCC SURCHARGE I SELECT Permit Total Fees: Fee Amount $451.85 $112.96 $4.50 $569.31 Notes: ..... As per SVMC 19.40.020 (B) - All residential driveways shall be paved with ... An approved hard surface material. Payment Summary: Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Building Permit $569.31 $56931 $90.81 $478.50 $569.31 $569.31 $90.81 $478.50 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: JD Printed By: jmm Print Date: 6/11/2009 Spokane coosisValley- Community Development Residential Construction Permit Application Permit Center 11703 E Sprague Ave, Suite B-3 Spokane Valley, WA 99206 (509)688-0036 FAX: (509)688-0037 www.spokanevalley.org PERMIT NUMBER: l Cg --t PERMIT FEE: ew Construction Addition/Remodel Other: "`,Accessory Bldg Deck SITE ADDRESS: 3`// i!< ffic Zia/c, 50,94 e %4 ASSESSORS PARCEL NO: LEGAL DESCRIPTION: ;Buildin` O,w"ne'r: 1., _ ,E_'' .'4.'e.,,..e:4 a't #['.- wF "t"•rk:h•.!,i.. s."'c :-=.. -� =Contfacto 2ir.r - F ': ,_ s.;,. r_: , a = _ s',-_'�+Stce't'N ...,:_ r s , {¢; • .> ,;z Name: ////C//Qe/ Sr Name: 0(�%%�r Address: sy/3 e �/ .✓J '% yU4///State: Address: City: c D ogr am_ Zip: ,V^,// cJ 7`�D City: State: Zip: F^934` rr eir cFr77Zip:, Phone: Phone: Fax: DECK/ OV. P • 10 SQ. FTG: Contractor Lic No: Exp Date: :.; Contact;P,ersoti,.' _-' ;: :, =..'; - a -oC4//,� City Business Lie. No: SEWEfjQEPTIC? � `/�� n Name: 4ZZ cI9'r7 Phone: 4 99— 4.5,9- /6::'3/ Describe the scope of work in detail: Cost of Project: $ 30 YaXIZ PoA ,Qlit/ /o'Xijo')( Proposed Use: o 177 C474 <Sl( c fe ec **************The following MUST be complete: (write N/A if not applicable)********************** HEIGHT TO PEAK: DIMENSIONS: r3oXYd-Pokt° # OF S T SA /? : I LE SPACE: TOTAL H/�% MAIN FLOOR TO SQ. FTG: Ml�/ 2"u FLOOR SQ. FTG: n /� UNFIN VASEMENT SQ. FTG: �,/g IMPERVIOUS URFACE AREA: y/� FINISH/E� BAS M NT SQ. FTG: n GAR GE !,FT : /�, �T���� DECK/ OV. P • 10 SQ. FTG: 30% SLOPES ON PROPERTY: # OF BED S a -oC4//,� HEAT Sia), "' SEWEfjQEPTIC? � The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before this application can be processed. SIGNATURE: Method of Payment: ❑ Cash Bankcard #: Authorized Signature: REVISED 2/15/07 ❑ Check ❑ Mastercard Expires: DATE: 02//7e % 200,9 ❑ VISA RECEIVED BY VIN#: CITY OF SPOKANE VALLEY JUN 0 4 2009 PERMItT/dENTEH BY: 3/ RESIDENTIAL CHECK LIST DIRECTIONS: Place a check mark in box next to each document required for complete submittal. ❑ SITE PLAN o Property lines and dimensions ❑ Direction arrow pointing North and orientation to streets o Proposed/existing buildings (footprint and dimensions) o Utilities, septic tank/drain field locations and distances o Setbacks to property lines o Distance between buildings o Right of way/easement location & sizes o Driveway approach size and location BUILDING PLANS (3 SETS) (minimum 1/8 inch scale or completely dimensioned) ❑ Elevations (Front/Rear/Sides) with roof peak and wall height including basement: ❑ Foundation Plan (crawlspace, basement or slab on grade): ❑ Footing sizes and locations o Perimeter concrete foundation wall sizes o Crawlspace ventilation o Supporting wood cripple walls or beams o Thickened concrete pads supporting beams or girder trusses ❑ Floor Plan of each level (finished or unfinished) with dimensions: o Floor Joist direction, size and spacing 0 Window and door location and sizes o Header, beam or concrete lintel sizes ❑ Window well locations if applicable ❑ Brace wall panel locations o Room usage labels o Water heater and furnace locations 0 Smoke detector locations o Exhaust fan locations ❑ Attic and crawl space access locations o Deck or concrete patio sizes and locations o Fire Wall construction ❑ Roof Plan: o Engineered truss direction and spacing o Rafter and over frame direction, size and spacing ❑ Wall Section Detail including: Roof o Slope/ roofing material/ underlayment/ ice dam protection o Sheathing size and type Ceiling o Joist size and spacing Wall o Height/ top plate/ stud size and spacing/ sole plate o Exterior sheathing size and type Floor o Joist size and spacing Foundation Wall o Concrete or Masonry unit width o Earth to wood separation distance Footing o Size Radon o Passive system with Emil vapor barrier Miscellaneous Construction Details ❑ Deck: o Floor plan/ side view/ dimensions o Floor Joist/ decking direction, size and spacing ❑ Stairway tread rise & run and nosing o Ridge, eave and valley lines o Beam and girder size and location o Truss or rafter size, spacing & connection o Attic insulation/ air space baffle/ ventilation ❑ Size of ceiling gypsum wall board o Siding/ exterior house wrap/ anchor bolts o Insulation, vapor barrier, gypsum wall board o Sheathing or concrete floor size/ insulation o Footing bottom to finished ground level depth o Horizontal & vertical reinforcement if any o Reinforcement if any o Active system with 6 mil vapor barrier ❑ Footings/ post/ and beam size and locations O Handrail / Guard height & spacing Spokane valley° • For City Use Only. PLUS'•Preject Number f .I Tl' (1 \ 677_) Project'Addiess, : 11703 E Sprague, Ave Suite 6-34 Spokane Valley WA 99206' 509.688.0036 0 Fax: 509.6880037:0permitcenter®spokanevaltey.org As part of our on-going commitment to customer service during the .review processi of your, project. application, we are. providing: you with a TARGET DATE for the initial technical application. review. If for: any reason we cannot meet this date,'we will contact you with a revised target date -' , , • t Your application' review TARGET DATE is ra\\\q .' The TARGET DATE is.the- date we estimate your`project application wilt have had its initial technical review. It is not the date' for approval or permit issuance.: , . Tips fora Smoother Project Application Review > Submit complete, accurate plans and documents. Extra time mai be required for re -submittals as project' application reyiewers work on multiple applications and it may be several days before they can look at your new or revised information. . , > Designate a specific contact person to communicate with the City. : ; • ' . • While the person designated as the applicant's contact person with the City can be changed, oneindii'idual with, the expertise for dealing with reviewer comments would he the hest choice for the entire review process. '• • i Call staff regarding the status of your project only -after the target date shown at the top of the page. ' Although you should be contacted on or by the target dale, please,feel free to contact us.if you haven't heardfrotn us by your target date. Staff may contact you before the target date if the initia/.review is complete.. By following this procedure, von will save tune and allow the reviewers to complete the work more,expeditioiusly. Steps in the Permit Process 1. Counter Complete.. Your application has been accepted •as 'counter complete., This. means all .of .the required • documents, as indicated on your Pre -Application Checklist have been submitted or ..have -been approved for deferred. submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.. 2. Quality Cheek, The neat step in the process is a quality check to make sure that the•application is reviewable and free ' from substantive flaws that would prevent technical staff from completing the technical review once' it is started. When this step is complete, your application will be routed to the appropriate; staff and remain-irr4heir review.queue until'it• , comes up for review. ! 3. Technical Compliance. Once an application is administratively complete, it, is.routed to'technical staff for compliance review. Depending on' the type of project, technical staff may include' multiple reviewers: You 'should,be. contacted by phone, tax, email, or mail by your TARGET DATE once the initial technical compliance review is complete.; , 4. Permit Issuance. When the technical compliance review of the application is cmplete,'including oany'subsequent re-' submittals, each reviewer will approve their section of the application and route it to the•Permit Center: When all sections of the application are received, a Permit Specialist will' process the application and contact the' person specified.on your application for permit pick-up.' Information regarding fees and pre -construction meetings (if required) -will be provided by the Permit Specialist at that time. WHITE -APPLICANT PINK BUILDING FILE REV 9/07 .i / DDress. 57/3 Sigler/7r / FOUND RP'S: TACK & TAG IN 12" PINE, S 64' W, 26.06'; TAC( & TAG IN 14" PINE, 14 30' W, 24.24'; NAIL & TAG IN 8' PINE. 'PLS 2063r. S 35' E, 23.17. 33,34 G II FOUND 2' PIPE PER R1, R3, R4 N Ni fltl W n CCi COI o_ N Nr - w01 0I 0 z THERE IS A FENCE UNE NEAR PROPERTY UNE THAT VARIES FROM 4' Tt 5.5' TO THE EAST FOUND RP'S TAC( & TAG IN 1578.60' FOUND #4 S1730'E 3.11' FROM REBAR G,00 /of / / 6424, #/4 to N 0 0 0 0 z RECORD OF SURVEY FOR A BOUNDARY LINE ADJUSTMENT -s A PORTION OF ;THE SW 1/4 SECTION 34, T26N, R44E, WJJ 490e Imo, to O ,—/ N EAST 1052.8' 467.75' m 12643.78' R3 2640.54' R1 2644.00' R4 N89' 7'39"E 26 3.93' FOUND 1/2' PIPE 545'32'E 5.84' FROM CALCULATED POSITION 0' UTRITY EASEMENT FOR WASHINGTON WATER POWER UNDER AUDITOR NO. 7711170105. PLANNING DEPT. APPROVED BY' DATE: 1/441 N89'47'39"E FOUND INSULAIER CORE PER R4 FOUND RP'S: /4 REBAR W/RED CAP. "CONTROL 16198, 14 02' L 1_ 19.44'; TACK & TAG IN FENCE Ir CORNER, "1-5 12904'. 14 48' W, 19.48'; S 37' W, 23.36'. r� aCCWth N ZICI! 0CO0,1 MNd Mtij N cDMM m 3 �lVN t0 N O 0 0 z in N a 148.00' 0 PARCEL A o 0 O z 66.00' 148.00' N89'47'39"E• 1041.75' OLD UNE 1 co 0 FOUND 3/8' PIPE W/PINCN TOP S61'53'E 4.82' FROM CALCULATED POSITION FOUND 1/2' PIPE 0.60' PER R2. EAST OF CALCULATED IJ E, HELD FOR SOUTH LINE EAS/WEST 434.37' 1 Q.3f' ¢4 REBAR 1489.39'32"E 434.98' W/CAP MARKED "PLS 20637" PARCEL A 188,378 SF 4.32 ACRES N89'47'42"E 1047.08' FOUND #4 REBAR VI/CAP Min "DIORE 12606" 0.59' SOUTH OF UNE 159.95' 9-..._,F011189-40REBARE W/CAP MARKED 'PLS 2063r 451.00' N89'47'39"E 426 PARCEL B 53,195 SF 1.22 ACRES 360. rt4S PARCEL h m M �o 1(1 W 0 0 Ez 25' RJGHT-OF-WAY 1 A.F. NO. 77113003 ` w D #4 REBAR W/CAP MARKED 'DUNSNC E 12606' 1051.32' 452.18' 456.18Tr 20' 1 1 DETAIL 1"20' 20' RIGHT—OF—WA FOUND 3/4' PIPE PER RI