2009, 06-11 Permit App: 09001621 Pole BldgPtoject Number: 09001621 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 6/11/2009 Page 1 oft
Project Information:
Permit Use: 30 x 40 POLE BLDG w/ 10 x 40 LEAN-TO
Setbacks: Front
Left: Right: Rear:
Site Information:
Plat Key: 999999 Name: Range
Contact: MATTOON, M L
Address: 5113 N MCDONALD RD
C - S - Z: SPOKANE, WA 99216-3037
Phone: (509) 939-1834
Group Name:
Project Name:
District: Nort
Parcel Number: 46343.9119 Block:
SiteAddress: 5113 N MCDONALD RD
Location:: CSV
Zoning: 12-3 SF Res District
Water District: 001 TRENTWOOD
Area: 1.23 Acres Width: 74
Nbr of Bldgs: 0 Nbr of Dwellings: 10
Lot:
Owner: Name: MATTOON, M L
Address: 5113 N MCDONALD RD
SPOKANE, WA 99216-3037
Review Information: L
Hold: ❑
Depth: 130 Right Of Way (ft): 0
Review
Building Plan Review
Released By: _
Originally Released:
Driveway/Approach
6/8/2009 By: tmelbourn
Released By:
NOT REQUIRED
Originally Released:
Septic Sys Review
6/11/2009 By: JLMain
Released By:
Originally Released:
Landuse/Zoning/HE Conditions
6/11/2009 By: LHALSEY
Released By:
Operator: JD
Originally Released:
Printed By: jmm
6/9/2009 By: tschmidt
Print Date: 6/11/2009
Project Nsmber: 09001621 Inv: 1
Permits: , . .
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 6/11/2009
Page 2 of 2
Contractor: OWNER
Description Grp Type Notes
POLE BDLG U-1 VB
Building Permit
Finn: OWNER
Phone: (000) 000-0000
This Application: Total Project:
Sci Ft Valuation Sq Ft Valuation
1,600 $30,400.00 1,600 $30,400.00
Totals: 1,600 $30,400.00 1,600 $30,400.00
Item Description Units Unit Desc
RESIDENTIAL PERMIT FEE 1 SELECT
ACCESSORY PLANS REVIEW 1 SELECT
WSBCC SURCHARGE I SELECT
Permit Total Fees:
Fee Amount
$451.85
$112.96
$4.50
$569.31
Notes: .....
As per SVMC 19.40.020 (B) - All residential driveways shall be paved with ... An approved hard
surface material.
Payment Summary:
Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing
Building Permit $569.31 $56931 $90.81 $478.50
$569.31 $569.31
$90.81 $478.50
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: JD Printed By: jmm
Print Date: 6/11/2009
Spokane
coosisValley-
Community Development
Residential Construction
Permit Application
Permit Center
11703 E Sprague Ave, Suite B-3
Spokane Valley, WA 99206
(509)688-0036 FAX: (509)688-0037
www.spokanevalley.org
PERMIT NUMBER: l Cg --t
PERMIT FEE:
ew Construction
Addition/Remodel
Other:
"`,Accessory Bldg
Deck
SITE ADDRESS:
3`// i!< ffic Zia/c, 50,94 e %4
ASSESSORS PARCEL NO:
LEGAL DESCRIPTION:
;Buildin` O,w"ne'r: 1., _ ,E_''
.'4.'e.,,..e:4 a't #['.- wF "t"•rk:h•.!,i.. s."'c :-=.. -�
=Contfacto 2ir.r - F ': ,_ s.;,. r_: , a = _
s',-_'�+Stce't'N ...,:_ r
s , {¢; • .> ,;z
Name: ////C//Qe/ Sr
Name: 0(�%%�r
Address: sy/3 e �/ .✓J '%
yU4///State:
Address:
City: c D ogr am_ Zip: ,V^,//
cJ 7`�D
City: State: Zip:
F^934` rr eir cFr77Zip:,
Phone:
Phone: Fax:
DECK/ OV. P • 10 SQ. FTG:
Contractor Lic No: Exp Date:
:.;
Contact;P,ersoti,.' _-' ;: :, =..'; -
a
-oC4//,�
City Business Lie. No:
SEWEfjQEPTIC?
�
`/�� n
Name: 4ZZ cI9'r7
Phone: 4 99— 4.5,9- /6::'3/
Describe the scope of work in detail:
Cost of Project: $
30 YaXIZ PoA ,Qlit/ /o'Xijo')(
Proposed Use: o 177 C474 <Sl( c fe
ec
**************The following MUST be complete: (write N/A if not applicable)**********************
HEIGHT TO PEAK:
DIMENSIONS:
r3oXYd-Pokt°
# OF S T SA
/? :
I LE SPACE:
TOTAL H/�%
MAIN FLOOR TO SQ.
FTG: Ml�/
2"u FLOOR SQ. FTG:
n /�
UNFIN VASEMENT SQ. FTG:
�,/g
IMPERVIOUS URFACE
AREA: y/�
FINISH/E� BAS M NT
SQ. FTG: n
GAR GE !,FT : /�,
�T����
DECK/ OV. P • 10 SQ. FTG:
30% SLOPES ON
PROPERTY:
# OF BED S
a
-oC4//,�
HEAT Sia), "'
SEWEfjQEPTIC?
�
The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or
local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before
this application can be processed.
SIGNATURE:
Method of Payment:
❑ Cash
Bankcard #:
Authorized Signature:
REVISED 2/15/07
❑ Check
❑ Mastercard
Expires:
DATE: 02//7e % 200,9
❑ VISA RECEIVED BY
VIN#: CITY OF SPOKANE VALLEY
JUN 0 4 2009
PERMItT/dENTEH
BY: 3/
RESIDENTIAL CHECK LIST DIRECTIONS:
Place a check mark in box next to each document required for complete submittal.
❑ SITE PLAN
o Property lines and dimensions
❑ Direction arrow pointing North and orientation to streets
o Proposed/existing buildings (footprint and dimensions)
o Utilities, septic tank/drain field locations and distances
o Setbacks to property lines
o Distance between buildings
o Right of way/easement location & sizes
o Driveway approach size and location
BUILDING PLANS (3 SETS) (minimum 1/8 inch scale or completely dimensioned)
❑ Elevations (Front/Rear/Sides) with roof peak and wall height including basement:
❑ Foundation Plan (crawlspace, basement or slab on grade):
❑ Footing sizes and locations
o Perimeter concrete foundation wall sizes
o Crawlspace ventilation
o Supporting wood cripple walls or beams
o Thickened concrete pads supporting
beams or girder trusses
❑ Floor Plan of each level (finished or unfinished) with dimensions:
o Floor Joist direction, size and spacing 0 Window and door location and sizes
o Header, beam or concrete lintel sizes ❑ Window well locations if applicable
❑ Brace wall panel locations o Room usage labels
o Water heater and furnace locations 0 Smoke detector locations
o Exhaust fan locations ❑ Attic and crawl space access locations
o Deck or concrete patio sizes and locations o Fire Wall construction
❑ Roof Plan:
o Engineered truss direction and spacing
o Rafter and over frame direction, size and spacing
❑ Wall Section Detail including:
Roof
o Slope/ roofing material/ underlayment/ ice dam protection
o Sheathing size and type
Ceiling
o Joist size and spacing
Wall
o Height/ top plate/ stud size and spacing/ sole plate
o Exterior sheathing size and type
Floor
o Joist size and spacing
Foundation Wall
o Concrete or Masonry unit width
o Earth to wood separation distance
Footing
o Size
Radon
o Passive system with Emil vapor barrier
Miscellaneous Construction Details
❑ Deck:
o Floor plan/ side view/ dimensions
o Floor Joist/ decking direction, size and spacing
❑ Stairway tread rise & run and nosing
o Ridge, eave and valley lines
o Beam and girder size and location
o Truss or rafter size, spacing & connection
o Attic insulation/ air space baffle/ ventilation
❑ Size of ceiling gypsum wall board
o Siding/ exterior house wrap/ anchor bolts
o Insulation, vapor barrier, gypsum wall board
o Sheathing or concrete floor size/ insulation
o Footing bottom to finished ground level depth
o Horizontal & vertical reinforcement if any
o Reinforcement if any
o Active system with 6 mil vapor barrier
❑ Footings/ post/ and beam size and locations
O Handrail / Guard height & spacing
Spokane
valley°
•
For City Use Only.
PLUS'•Preject Number f .I Tl' (1 \ 677_)
Project'Addiess, :
11703 E Sprague, Ave Suite 6-34 Spokane Valley WA 99206'
509.688.0036 0 Fax: 509.6880037:0permitcenter®spokanevaltey.org
As part of our on-going commitment to customer service during the .review processi of your, project.
application, we are. providing: you with a TARGET DATE for the initial technical application. review. If for:
any reason we cannot meet this date,'we will contact you with a revised target date -' , ,
• t
Your application' review TARGET DATE is ra\\\q .'
The TARGET DATE is.the- date we estimate your`project application wilt have had its initial technical
review. It is not the date' for approval or permit issuance.: , .
Tips fora Smoother Project Application Review
> Submit complete, accurate plans and documents.
Extra time mai be required for re -submittals as project' application reyiewers work on multiple applications and it
may be several days before they can look at your new or revised information. . ,
> Designate a specific contact person to communicate with the City. : ; • ' .
•
While the person designated as the applicant's contact person with the City can be changed, oneindii'idual with, the
expertise for dealing with reviewer comments would he the hest choice for the entire review process. '•
•
i Call staff regarding the status of your project only -after the target date shown at the top of the page. '
Although you should be contacted on or by the target dale, please,feel free to contact us.if you haven't heardfrotn us
by your target date. Staff may contact you before the target date if the initia/.review is complete.. By following this
procedure, von will save tune and allow the reviewers to complete the work more,expeditioiusly.
Steps in the Permit Process
1. Counter Complete.. Your application has been accepted •as 'counter complete., This. means all .of .the required
•
documents, as indicated on your Pre -Application Checklist have been submitted or ..have -been approved for deferred.
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review..
2. Quality Cheek, The neat step in the process is a quality check to make sure that the•application is reviewable and free '
from substantive flaws that would prevent technical staff from completing the technical review once' it is started. When
this step is complete, your application will be routed to the appropriate; staff and remain-irr4heir review.queue until'it• ,
comes up for review. !
3. Technical Compliance. Once an application is administratively complete, it, is.routed to'technical staff for compliance
review. Depending on' the type of project, technical staff may include' multiple reviewers: You 'should,be. contacted by
phone, tax, email, or mail by your TARGET DATE once the initial technical compliance review is complete.; ,
4. Permit Issuance. When the technical compliance review of the application is cmplete,'including
oany'subsequent re-'
submittals, each reviewer will approve their section of the application and route it to the•Permit Center: When all sections
of the application are received, a Permit Specialist will' process the application and contact the' person specified.on your
application for permit pick-up.' Information regarding fees and pre -construction meetings (if required) -will be provided by
the Permit Specialist at that time.
WHITE -APPLICANT PINK BUILDING FILE
REV 9/07
.i
/ DDress. 57/3
Sigler/7r
/
FOUND RP'S: TACK & TAG IN
12" PINE, S 64' W, 26.06'; TAC(
& TAG IN 14" PINE, 14 30' W,
24.24'; NAIL & TAG IN 8' PINE.
'PLS 2063r. S 35' E, 23.17.
33,34
G
II FOUND 2'
PIPE PER
R1, R3, R4
N
Ni
fltl
W n
CCi COI
o_
N Nr -
w01
0I
0
z
THERE IS A FENCE UNE
NEAR PROPERTY UNE
THAT VARIES FROM 4' Tt
5.5' TO THE EAST
FOUND RP'S TAC( & TAG IN
1578.60'
FOUND #4
S1730'E 3.11'
FROM REBAR
G,00 /of / /
6424, #/4
to
N
0
0
0
0
z
RECORD OF SURVEY
FOR A BOUNDARY LINE ADJUSTMENT
-s
A PORTION OF ;THE SW 1/4 SECTION 34, T26N, R44E, WJJ
490e
Imo,
to
O
,—/
N
EAST 1052.8'
467.75'
m
12643.78' R3
2640.54' R1
2644.00' R4
N89' 7'39"E 26 3.93'
FOUND 1/2' PIPE
545'32'E 5.84' FROM
CALCULATED POSITION
0' UTRITY EASEMENT
FOR WASHINGTON WATER
POWER UNDER AUDITOR
NO. 7711170105.
PLANNING DEPT. APPROVED
BY'
DATE: 1/441
N89'47'39"E
FOUND INSULAIER
CORE PER R4
FOUND RP'S: /4 REBAR W/RED
CAP. "CONTROL 16198, 14 02' L 1_
19.44'; TACK & TAG IN FENCE Ir
CORNER, "1-5 12904'. 14 48' W,
19.48'; S 37' W, 23.36'.
r�
aCCWth
N ZICI! 0CO0,1 MNd
Mtij N cDMM
m 3 �lVN
t0
N
O
0
0
z
in
N
a
148.00'
0
PARCEL A o
0
O
z
66.00'
148.00'
N89'47'39"E• 1041.75' OLD UNE
1
co
0
FOUND 3/8' PIPE W/PINCN
TOP S61'53'E 4.82' FROM
CALCULATED POSITION
FOUND 1/2' PIPE 0.60' PER
R2. EAST OF CALCULATED
IJ E, HELD FOR SOUTH LINE
EAS/WEST 434.37'
1 Q.3f'
¢4 REBAR 1489.39'32"E 434.98'
W/CAP MARKED
"PLS 20637"
PARCEL A
188,378 SF
4.32 ACRES
N89'47'42"E
1047.08'
FOUND #4 REBAR
VI/CAP Min
"DIORE 12606"
0.59' SOUTH OF UNE
159.95'
9-..._,F011189-40REBARE
W/CAP MARKED
'PLS 2063r
451.00'
N89'47'39"E 426
PARCEL B
53,195 SF
1.22 ACRES
360.
rt4S PARCEL
h
m
M
�o
1(1
W
0
0
Ez
25' RJGHT-OF-WAY 1
A.F. NO. 77113003 `
w
D #4 REBAR
W/CAP MARKED
'DUNSNC E 12606'
1051.32'
452.18'
456.18Tr
20'
1
1
DETAIL
1"20'
20' RIGHT—OF—WA
FOUND
3/4' PIPE
PER RI