Loading...
2014, 09-19 Permit: SW-14001375 SewerSPOKANE COUNTY UTILITIES PERMIT Application Number: SW -14001375 Permit Issued Date: 09/19/2014 Expiration Date: 09/19/2015 Project Description Project Name: Primary Contact. Phone: SEWER CONNECTION WEST FARMS NORM'S EXCAVATING INC 509-928-0580 Applicant: NORM'S EXCAVATING INC Address: Phone: Email: tina@normsexcavating.com PO BOX 30873 SPOKANE, WA 99223 509-928-0580 SITE INFORMATION: Site Address: Parcel Number: Assessor's Description Inspection Area: Zoning: 5211 N MCDONALD RD 46343.9108 34-26-44 THE E 451 FT OF THE S 74FT OF THE N 1257.9FT OF THE SW1/4; EXC RD & EXC THE S .9FT OF THE E 155FT THEREOF :(509)-477-3675 Owner: Address: Phone: Email. SMITH, TIMOTHY J & WENDY M 5211 N MCDONALD RD SPOKANE, WA 99216-1409 Water District: Trentwood Irrigation District Fire District: Spokane Valley Fire #3 Land Area: 0.72 Acre(s) CONTRACTOR INFORMATION: NORMSEI972BM, Exp. 02/06/2015 NORM'S EXCAVATING INC PO BOX 30873 SPOKANE, WA 99223 509-928-0580 tina@normsexcavafing.com DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION FEE DETAIL: Processing - Utilities Utilities Permit Total Fee: $26.64 $125.00 $151.64 1 $125.00 $125.00 $125.00 CONDITIONS: Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire. Inside Public Transit Benefit Area CALL 1-800-424-5555 BEFORE YOU DIG—AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. SEWER PERMITS ARE VALID FOR ONE (1) YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. Date Printed. 09/19/2014 08:26:06 Project Coordinator: Vickie Marriott SPOKANE COUNTY UTILITIES PERMIT Application Number: SW -14001375 Permit Issued Date: 09/19/2014 Expiration Date: 09/19/2015 SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 09/19/2014 0826:06 Project Coordinator: Vickie Merriott