2015, 04-14 Permit: SW-15000328 SewerSPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW -15000328 Permit Issued Date: 04/14/2015
Expiration Date: 04/14/2016
Project Description: SEWER
Project Name: WEST FARMS
Primary Contact: ACME EXCVT & SEWER BORING CO Applicant: ACME EXCVT & SEWER BORING CO
Phone: (509)228-0691 Address: 6808 S. LINKE RD.
GREENACRES, WA 99016
Phone: (509)228-0691
Email:
SITE INFORMATION:
Site Address: 5225 N MCDONALD RD Owner SCHAFF, PATRICK C & LORRI D
Parcel Number: 46343.9055 Address: 5225 N MCDONALD RD
SPOKANE VALLEY, WA 99216
Phone:
Assessor's Description: 34-26-44 S208.70FT OF N1110.90FT OF Email:
E1052.80FT OF SW1/4 EXC CO RD
Inspection Area: : (509)477-3675
Water District: Trentwood Irrigation District Fire District: Spokane Valley Fire
#3
Zoning: Land Area: 4.96 Acre(s)
CONTRACTOR INFORMATION:
ACMEEES963LD, Exp. 06/04/2016
ACME EXCVT & SEWER BORING CO
6808 S. LINKE RD. GREENACRES, WA 99016
(509)228-0691
DETAILS:
Class Type Quantity Unit Charge Value
SEWER SEWER CONNECTION 1 $125.00 $125.00
FEE DETAIL:
Processing - Utilities
Utilities Permit
Total Fee:
$27.12
$125.00
$152.12
$125.00
CONDITIONS'
Inside Public Transit Benefit Area
Public Transit Benefit Area
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
SVRP Aquifer Boundary: Water Purveyor ability to serve statement required. If unable to serve, ?mitigation certificate? (use of private well)
from DOE prior to permit issuance.
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
Date Printed. 04/14/201511 30:20 Project Coordinator Susan Clark
SPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW -15000328 Permit Issued Date: 04/14/2015
Expiration Date: 04/14/2016
SEWER PERMITS ARE VALID FOR ONE (1) YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES
DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT
ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED'SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Pnnted: 04/14/2015 11 3020 Project Coordinator Susan Clark