Loading...
2008, 08-22 Permit App: 08003217 PatioProject Number: 08003217 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 8/22/2008 Page 1 of 2 Project Information: Permit Use: COVERED PATIO Contact: NW BULDING SPECIALIST Address: 5317 W WOODSIDE C - S - Z: SPOKANE, WA 99208 Setbacks: Front Left: Right: Rear: Phone: (509) 939-6829 Group Name: Site Information: Project Name: Plat Key: 999999 Name: Range District: Nort Parcel Number: 46343.9055 Block: Lot: SiteAddress: 5225 N MCDONALD RD Owner: Name: SCHAFF, PATRICK C & LORRI D Address: 5225 N MCDONALD RD Location:: CSV SPOKANE VALLEY, WA 99216 Zoning: R-3 SF Res District Water District: Hold: ❑ Area: 4.96 Acres Width: 0 Depth: 0 Right Of Way (ft): 40 Nbr of Bldgs: 1 Nbr of Dwellings: 1 Review Information: -z, Review Building Plan Review Released By: Septic Sys Review Originally Released: 8/21/2008 By: tmelbourn Released By: Originally Released: 8/18/2008 By: LHALSEY Landuse/Zoning/HE Conditions Permits. Released By: - - - -- - - - - - Originally Released: 8/20/2008 By: tschmidt Operator: JD Printed By: JD Print Date: 8/22/2008 Project Number: 08003217 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 8/22/2008 Contractor: NORTHWEST BUILDING Address: 5317 W WOODSIDE SPOKANE, WA 99208 Description Grp Type Notes COV DECK R-3 VB Item Description RESIDENTIAL PERMIT FEE WSBC SURCHARGE SF PLNS RVW < 7999 SQ FT Building Permit Page 2 of 2 Firm: NORTHWEST BULDING SPECIAL Phone: (509) 939-6829 This Application: Total Project: Sq Ft Valuation Sq Ft Valuation 0 $6,500.00 0 $6,500.00 Totals: 0 Units Unit Desc 1 SELECT 1 SELECT 1 SELECT $6,500.00 0 $6,500.00 Fee Amount $139.25 $4.50 $55.70 Permit Total Fees: $199.45 Notes: Payment Sanunary: Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Building Permit $199.45 $199.45 $0.00 $199.45 $199.45 $199.45 $0.00 $199.45 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: JD Printed By: JD Print Date: 8/22/2008 Spokane Dalley Community Development Residential Construction Permit Application Permit Center 11703 E Sprague Ave, Suite B-3 Spokane Valley, WA 99206 (509)688-0036 FAX: (509)688-0037 www.sookanevalley.org PERMIT NUMBER: Jl. 11 PERMIT FEE: ton r46 New Construction Accessory Bldg Addition/Remodel ❑ Deck Other: SITE ADDRESS: '5Z 2 .5 W /Y)6iatiH t D ASSESSORS PARCEL NO: t{cors q77. 90 55 LEGAL DESCRIPTION: Peat (006V - ,'F.'. s''`-- - 3,'t, -r" Buildin` Owner:, T , z 3 .. g i. .- M.-... at"- :COnti'aelifr. 'e,':_ rnc_ 'r F, ,T ,'.__ '.�` -�1�"y _, ii/;TL p ,,i.3.5,.<a-:i4i Pre. /G�tl �C%:`` If - ,4 'Name: Name: tlinot, 5fut van Address: ,,,ov M int pettily Address: TO 75®/ 7%3/ q� City: 5/©/Lein �� State:�Zip: lsl60 Phone:009 959i$'� Fax G� sY 4 ��1„ / `/ .�/ City: '0 at'iL 1/allu, State: yip Zip:7t72149 Phone: Fax: Contractor Lic N Exp Date: NOCTLiai99y7GZ 7/12s/00 10 ContactPer"son''`s:` a'....:.: :: r, P` '_e.;" . .- _ ' _ „ . .,. _ DECK/ OV. PATIO SQ. FTG: 20 City Business Lic. No: # OF BEDROOMS: CONSTRUCTION TYPE: HEAT Name: Phone: / 1 Describe the scope of work in detail:„,,. of Project: $ 4arn.G Le�Nr ever Pio . Vt PLA wa (I S Proposed Use: **************The following MUST be complete: (write N/A if not applicable)********************** HEIGHT TO PEAK: DIMENSIONS: # OF STORIES: TOTAL HABITABLE SPACE: MAIN FLOOR TO SQ. FTG: 2Nu FLOOR SQ. FTG: UNFIN BASEMENT SQ. FTG: -. IMPERVIOUS SURFACE AREA: FINISHED BASEMENT SQ. FTG: GARAGE SQ. FTG: DECK/ OV. PATIO SQ. FTG: 20 30% SLOPES ON PROPERTY: # OF BEDROOMS: CONSTRUCTION TYPE: HEAT SEWER OR SEPTIC? The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before this application can be processed /`�ff / 2 co co SIGNATURE: ,f / A -A— ^ DATE: / Method of Payment: ❑ Cash Bankcard #: Authorized Signature: REVISED 2/15/07 ❑ Check ❑ Mastercard Expires: ❑ VISA VIN#: RESIDENTIAL CHECK LIST DIRECTIONS: Place a check mark in box next to each document required for complete submittal. ❑ SITE PLAN o Property lines and dimensions o Direction arrow pointing North and orientation to streets o Proposed/existing buildings (footprint and dimensions) o Utilities, septic tank/drain field locations and distances o Setbacks to property lines o Distance between buildings o Right of way/easement location & sizes o Driveway approach size and location BUILDING PLANS (3 SETS) (minimum 1/8 inch scale or completely dimensioned) O Elevations (Front/Rear/Sides) with roof peak and wall height including basement: ❑ Foundation Plan (crawlspace, basement or slab on grade): o Footing sizes and locations o Perimeter concrete foundation wall sizes o Crawlspace ventilation o Supporting wood cripple walls or beams o Thickened concrete pads supporting beams or girder trusses ❑ Floor Plan of each level (finished or unfinished) with dimensions: o Floor Joist direction, size and spacing ❑ Window and door location and sizes o Header, beam or concrete lintel sizes ❑ Window well locations if applicable o Brace wall panel locations o Water heater and furnace locations o Exhaust fan locations o Deck or concrete patio sizes and locations ❑ Roof Plan: o Engineered truss direction and spacing o Rafter and over frame direction, size and spacing ❑ Wall Section Detail including: Roof o Slope/ roofing material/ underlayment/ ice dam protection o Sheathing size and type Ceiling o Joist size and spacing Wall o Height/ top plate/ stud size and spacing/ sole plate o Exterior sheathing size and type Floor o Joist size and spacing Foundation Wall ❑ Concrete or Masonry unit width o Earth to wood separation distance Footing o Size Radon ❑ Passive system with 6mil vapor barrier Miscellaneous Construction Details ❑ Deck: o Floor plan/ side view/ dimensions o Floor Joist/ decking direction, size and spacing O Stairway tread rise & run and nosing o Room usage labels o Smoke detector locations o Attic and crawl space access locations o Fire Wall construction o Ridge, eave and valley lines o Beam and girder size and location o Truss or rafter size, spacing & connection o Attic insulation/ air space baffle/ ventilation o Size of ceiling gypsum wall board o Siding/ exterior house wrap/ anchor bolts o Insulation, vapor barrier, gypsum wall board ❑ Sheathing or concrete floor size/ insulation ❑ Footing bottom to finished ground level depth o Horizontal & vertical reinforcement if any ❑ Reinforcement if any ❑ Active system with 6 mil vapor barrier o Footings/ post/ and beam size and locations O Handrail / Guard height & spacing Project Transmittal City of Spokane Valley Community Development Department 11703 E. Sprague Ave, Suite B3 Spokane Valley,\VA 99206 Phone: 509.688.0036 New project ❑ Previous pre -app meeting o Plan revisions ❑ Transmittal Date: Monday; August 18, 2008 Site Address: 5225 N MCDONALD RD Parcel Number: 46343.9055 Zoning: R-3 Fire District: FD 01 Water District: Project Number: 08003217 Applicant: e-mail: Contact: e-mail: Contractor: NW BULDING SPECIALIST 5317 W WOODSIDE SPOKANE, WA 99208 (509) 939-6829 NW BULDING SPECIALIST 5317 W WOODSIDE SPOKANE, WA 99208 (509) 939-6829 Owner: SCHAFF. PATRICK C & LORRI D 5225 N MCDONALD RD SPOKANE VALLEY, WA 99216 e-mail: Occupant: e-mail: NORTHWEST BUILDING SPECIAL! Arch /Engineer: 5317 W WOODSIDE SPOKANE. WA 99208 (509) 939-6829 e-mail: Project COVERED PATIO Description: pRECE@VE r) AUr 18 74771 Please send all plan review and project comments via e-mail to the highlighted individuals. Building Landuse Engineer Utilities Health Fire Dist Assessor I -o U II II (D u IS L p I(\❑ I II IV�I A` APPLICATION [ f SITE PLAN Z PLANS I / ; Please send all plan review and project comments via e-mail to the highlighted individuals. circa % Q iane _�Valley® . a.: r i,...:;: .«.t...r For City Use Only PLUS Project Number MNC\c 3Z. n Project Address 11703 E Sprague Ave Suite B-3-• Spokane Valley WA 99206 ,. 509.688.0036 • Fax: 509.688.0037 • permitcenter@spokanevalley.org As part of our on-going commitment to customer service during .the .review process -of •your project application, we are providing you with a TARGET DATE for the initial technical application 'review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review Submit complete, accurate plans and documents. Extra time mar be required fin' re -submittals as project application reviewers x$rk—on multiple applications and it nun be several dams before they can look at your new or revised information.-' i Designate a specific contact person to communicate with the City. ;Pule the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the beat choice fbr the entire review process: i Call staff regarding the status of your project only after the target date shown at the top of the page. • Although foul should be contacted on or by the target date, please feel free to contact us f you haven't heard fou us by your target date. Skill' num' contact you before the target date the Initial review is complete. Bv' following this procedure, you will save time and allow the reviewers to complete the work More ex'peditioirslr. Steps in the Permit Process I. Counter Complete. Your application has been accepted as counter complete..This >means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have :been approved for deferred submittal. This does not prevent technical staff from requesting additional,information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that 'the application is reviewable and free from substantive Claws that would prevent technical staff from completing the'technical revie}v once it is started. When this step is complete, your application will be routed to the appropriate staff and, remain in their review queue until. it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical' staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is,complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to -the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and, contact the'person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the.Permit Specialist at that time. WHITE - APPLICANT PINK -BUILDING FILE REV 9/07