Loading...
2011, 04-29 Permit App: 11001107 AdditionProject Number: 11001107 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 4/29/2011 Page 1 of 2 Project Information: �. uff fm, e- ni rii ktl- w Permit Use: 24 X 28 ADDITION TO MANUFACTURED HOME Setbacks: Front Site Information: Plat Key: Left: Right: Rear: Name: Range Contact: MISSION MEADOWS LLC Address: 15918 E CAMERON CT C - S - Z: VERADALE, WA 99037 Phone: (000) 000-0000 Group Name: Project Name: District: East Parcel Number: 55083.9067 Block: SiteAddress: 1822 N MEADOWS PL Location:: CSV Lot: Owner: Name: MISSION MEADOWS LLC Address: 15918 E CAMERON CT VERADALE, WA 99037 Zoning: R-4 SF Res Urban District Water District: 134 CONSOLIDATED ID #19 Area: 11.74 Acres Width: 0 Nbr of Bldgs: 0 Nbr of Dwellings: 0 Review Information: Review Building Plan Review Hold: ❑ Depth: 0 Right Of Way (ft): 0 Released By: Originally Released: 4/29/2011 By: tmelbourn Landuse/Zoning/HE Conditions Permits: Operator: JD Released By: Originally Released: 4/28/2011 By: mpalaniuk Printed By: JD Print Date: 4/29/2011 Project Number: 11001107 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 4/29/2011 Contractor: OWNER Description Grp Type Notes GAR WOOD U-1 VB Item Description RESIDENTIAL PERMIT FEE WSBCC SURCHARGE SF PLNS RVW < 7999 SQ FT Notes:.,"�" Payment Summary: Permit Type Building Permit Building Permit Page 2 of 2 Firm: OWNER Phone: (000) 000-0000 This Application: Sq Ft Valuation 644 $12,236.00 Total Project: Sq Ft Valuation 644 $12,236.00 Totals: 644 $12,236.00 Units Unit Desc 1 SELECT 1 SELECT 1 SELECT Permit Total Fees: 644 $12,236.00 Fee Amount $223.25 $4.50 $89.30 MI .,11,1 NEINOMMaINIMININ=83 =:Ail A,H=W' MINSI i IM,W ,r I". :'fit..'"a„M $317.05 Fee Amount Invoice Amount Amount Paid Amount Owing $317.05 $317.05 $89.30 $227.75 $317.05 $317.05 $89.30 $227.75 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: JD Printed By: JD Print Date: 4/29/2011 Spokane Valley� Community Development Residential Construction n New Construction ❑ Accessory Bldg Permit Application n Addition/Remodel ❑ Deck Other: Cztge, Permit Uenter 11703 E Sprague Ave, Suite B-3 Spokane Valley, WA 99206 (509)688-0036 FAX: (509)688-0037 www.spokanevalley.org PERMIT NUMBER: —pool PERMIT FEE: SITE ADDRESS: / S Z. Z. A)r/r -a `> 101 62 /id. _ ASSESSORS PARCEL NO: 651963. 90‘i7 LEGAL DESCRIPTION: LD%. /Z7, / Building Owner: DIMENSIONS: f' Z3Igm 1( 2 o'' Name: ped. /4n/hynk MAIN FLO•R TO SQ. FTG: q Address: J y� / ZZ N �lLE�_ ,S Y IMPERVIOUS SURFACE AREA: L! f City: vait61 State: w itik. Zip: *037 Phone: 853_3 Z3 Fax: Fax: Contact Person Name: $7 y1 Phone: 5- jy_ q �3 emOlettAuS Contractor: DIMENSIONS: f' Z3Igm 1( 2 o'' # OF STORIES: ( Name: avivil MAIN FLO•R TO SQ. FTG: q 2Nu FLOOR SQ. FTG: /4 Address: IMPERVIOUS SURFACE AREA: L! f FINISHED BASEMENT SQ. FTG: jt) 4- City: State: Zip: Phone: Fax: HEATnSOURCE: le i' 6i� C 5 -�v /z {� Contractor Lic No: Exp Date: City Business Lic. No: Cost of Project: $ /$/000 69-745 d MJ ., 3 a �,�f� YZ 4d Ovr/v :ey/S .%' gi kid � i Proposed Use: ,42 5? - 7 Li **************The following MUST be complete: (write N/A if not applicable)********************** Describe the scope of work in detail: HEIGHT TO "E ", : � ' , , DIMENSIONS: f' Z3Igm 1( 2 o'' # OF STORIES: ( TOTAL HABITABLESPACE: 3D ff-, MAIN FLO•R TO SQ. FTG: q 2Nu FLOOR SQ. FTG: /4 UNFIN BASEMENT SQ. FTG: 1# IMPERVIOUS SURFACE AREA: L! f FINISHED BASEMENT SQ. FTG: jt) 4- GARAG Q. FTC: 0 I DECK/COV. PATIO SQ. FTG: 4.4 30% SLOPES ON P RTY: # OF BED ODMS: CONSTRUCTION `TYPE: 4 4011%6 HEATnSOURCE: le i' 6i� C 5 -�v /z {� SEWER R SEPTIC? The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the dwelling is/will'. be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before this application can be processed. SIGNATURE: , d67.1 Method of Payment: 0 Cash ❑ Check ❑ Mastercard Bankcard #: Expires: Authorized Signature: REVISED 2/15/07 DATE: ❑ VISA VIN#: 77/ 2 4)df VV:\ful Siblane .0•OValley 11703 £ Sprague Ave Suite 6-3 Spokane Valley WA 99206 509.688.0036 • Fax: 509.688.0037 • cityhall@spokanevalley.org Residential Plan Submittal Minimums o Completed Building & Mechanical application with: Accurate address, Parcel Number and/or Legal Description, description of work, owner and contractor information, signature, and date. o Two sets of plans including Site Plan, elevations, floor plans, foundation plans With details, roof plan, framing plans & details. o Show the height of any proposed buildings or accessory structures. o Floor plan for each floor: Dimension to scale (minimum 1/8") and label each Room (including sq. footage of house and garage on plans) Show each level of existing house and square footage of any additions. o All braced wall panel types: show locations and details of installation, including engineered design. O Egress windows: Provide at least one window or exterior door approved for Emergency escape or rescue from a basement and in every room for sleeping. o Smoke detector locations O 22" X 30" attic access location o 18" X 24" crawl space access: O One-hour separation detail: between house and garage O Floor framing details: Joist type, size, spacing and installation details O Roof framing plan and details O Furnace and hot water heater location. O All header locations: type, size, and connections O Foundation plan O Insulation information 0•01\ft.., Splikane 4.000ValleIey Project Transmittal City of Spokane Valley Community Development Department 11703 E. Sprague Ave, Suite B3 Spokane Valley, WA 99206 Phone: 509.688.0036 New project 0 Previous pre -app meeting 0 Plan revisions 0 Transmittal Date: Thursday, Apri128, 2011 Site Address: 1822 N MEADOWS PL Project Number: 11001107 Parcel Number: 55083.9067 Zoning: R-4 Water District: CONSOLIDATED ID #19 Fire District: FD 01 Applicant: MISSION MEADOWS LLC 15918 E CAMERON CT VERADALE, WA 99037 (000) 000-0000 e-mail: e-mail: Contact: MISSION MEADOWS LLC Occupant: 15918E CAMERON CT e-mail: VERADALE, WA 99037 (000) 000-0000 e-mail: Owner: MISSION MEADOWS LLC 15918 E CAMERON CT VERADALE, WA 99037 Contractor: OWNER ( ) - 0 Arch / Engineer: e-mail: lVJ Project Description: 24 X 28 ADDITION TO MANUFACTURED HOME Building Landuse Engineer Utilities Health Fire Dist Assessor APPLICATIO SITE PLA PLA 7 - Please send all plan review and project comments via e-mail to the highlighted individuals. *Wane Valley® For City Use O\nly PLUS Project Number l 1 t Project Address 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206 509.688.0036 • Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven 't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE -APPLICANT PINK- BUILDING FILE REV 9/07 • LOT 127 1822 N. MEADOWS PLACE NORTH----41Po' Scale: 1 in = 20 ft Home Manufacturer: Width length 56,' €7" Prospective Resident Approval date date 1 MEADOWS PLACE I 64 T. APPROVED , . N? DATE.- '//27/2oll