Loading...
1998, 04-23 Permit App: 98003303 GaragePROJECT NUMBER= 98003303 PROJECT NUMBER= 98003303 APPLICATION APPLICATION DATE= 04/23/98 DATE= 04/23/98 PAGE= 01 PAGE= 01 ****** THIS IS NOT A PERMIT ****** PENALTIES WILL BE ASSESSED FOR COMMENCING WORK WITHOUT A PERMIT SITE STREET= ADDRESS= PERMIT USE= PLAT#= BLOCK= AREA= # OF BLDGS= OWNER= STREET= ADDRESS= 519 S MCDONALD RD SPOKANE WA 99216 DETACHED GARAGE 36 X 40 001808 PLAT NAME= 1 LOT= F/A= 1 # DWELLINGS= 00000000 HAIGHT, GERALD 519 S MCDONALD RD SPOKANE WA 99216 PARCEL#= 45221.0321 NULPH'S SUB. ZONE= AGRI F WIDTH= 1 WATER CONTACT NAME= GERALD HAIGHT BUILDING SETBACKS: FRONT= 35 LEFT= 6 DIST#= DEPTH= DIST = F R/W= PHONE= 509 926 0926 PHONE NUMBER= 509 926 0926 RIGHT= 7 REAR= 8 ****************************** REVIEW INFORMATION ********+******************** DEPARTMENT REVIEW REQUIREMENT BUILDING PLAN REVIEW REQUIRED COMMENTS: BUILDING SETBACK VIEW REQUIRED COMMENTS: 0 -NT-met-es-0 /a7`ia' ******************************* BUILDING PERMIT ******************************* CONTRACTOR= OWNER NEW= X DWELL UNITS= BLDG W X D = REQ PARKING= REMODEL= 1 OCCUP. LD= 36 X 40 SQ FT= #HANDICAP= PHONE= ADDITION= CHANGE OF USE= BLDG HGT= 16 STORIES= 1 1440 SPRINKLER= N CRITICAL MAT= N DESCRIPTION GROUP TYPE SQ FT GARAGE U-1 VN ITEM DESCRIPTION RESIDENTIAL VALUATION RESIDENTIAL SURCHARGE STATE SURCHARGE 1440 VALUATION 17280.00 QUANTITY FEE AMOUNT Y Y Y 263.00 57.86 4.50 PROJECT NUMBER= 98003303 APPLICATION DATE= 04/23/98 PAGE= 02 PERMIT TYPE FEE AMOUNT AMOUNT PAID AMOUNT OWING BUILDING PERMIT 325.36 .00 325.36 325.36 PROCESSED BY: BURRIS, ROBIN PRINTED BY: BURRIS, ROBIN ******************************** THANK YOU .00 325.36 ************************************ APPLICATION INFORMATION -)Tot3 Spokane County does not discriminate on the basis of disability in the admission to, or treatment or employment in, its programs or activities, What Is the JOB SITE address? ASSESSOR'S tax parcel number? / J,?(7:6e, II&1d y50l ( Eal Legal descrlptlon as it appears on the property deed /LILY2 S su D,/2(1t' S tail (512 I-OTI 8 k r k/ PCye,-e ( -*- yaws<< o3 c2/ OWNER or OCCUPANT Phone r`,2C/''a a /4% V P,Tr; n }‘ e h / S Mailing address City, state Zip • s S 7 7' e) /70 /' ��j/� `v� A 7Who should we contactggggarding his project? "`'S Phone (1 What worMs be ng one un r, his permit? \ , a . - 41 ."6,. _, , e_. , _ ey___,e__ tone (7177 M- o ,) :'Dater distract is n Property size Right of way width x t . ." t< • * L • Building Building height d C # of stones / Contractor p4,e ‘v C Ste, ,Y:T, tmensions 3 x 1/0 / TOTAL SQUARE FOOTAGE / �yC) > W State Contractor license # Main floor Mailing address area Unfinished basement area Architect/Engineer 2nd floor area Finished basement area Garage area Size of decks, etc. What is the heat source? What is the cost of your pro lef 71 Manufactured Home i'; Sign Width: Length: What is the square footage of the sign face? How high is the sign? Year: Make: Installer Contractor We State Contractor license # We State Contractor license # Mailing address Mailing address Relocation : Fire Safety Previous address Fire Sprinkler _ Tent Paint booth Fire Alarm Fireworks display _ VALUE Contractor Contractor WA State Contractor license # WA State Contractor license # Mailing address Mailing address Fue( `Storage Tanks Swimming Pool (Circle oris) Above -ground Under round Size / gallons Private Contents of tank(s) Size / gallons PublicJsemi-private Contractor Contractor Wa State Contractor license # WA State Contractor license # Mailing address Mailing address Spokane County does not discriminate on the basis of disability in the admission to, or treatment or employment in, its programs or activities, A44 Site 'Ian 11111111111111111 soup `.s Irlill'iw 1II!U!IIHiIPiI1IIIIIIII � - 111111111 IA151111 PPM, 11117.3me ...:111AIRIENIMMEINE )1611 11111ENENEMINIMMI EMMEN Ell 11111111111111117 raramarranw mlisommaiimi immeamss#: 111111111111411111111 vika, IIIIIIIIiilailigliere ....0 mom __AMC s.. ' � 7 II IIII AR�I�1 I INCLUDE THE FOLLOWING: ❑ All roadways, driveways & easments ❑ Distances from center of roads, right of ways, private roads & property lines O All existing & proposed buildings ❑ Underground utilities ❑ North arrow ❑ Septic tanks & wells rn�CIIr"� z g1�