2009, 06-25 Permit App: 09001856 DeckProject Number: 09001856 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 6/25/2009 Page 1 of 2
Project Information:
Permit Use: REPLACE EXISTING DECK
Setbacks: Front
Site Information:
Plat Key: 001226 Name: HILLCREST ACRES 04TH ADD
Left: Right: Rear:
Contact: ELROD, CLAY A & CINDY
Address: 2722 S MCDONALD RD
C - S - Z: SPOKANE VALLEY, WA 99216
Phone: (509) 720-1660
Group Name:
Project Name:
4
Distric
Sout
Parcel Number: 45273.2214
Block:
Lot:
SiteAddress: 2722 S MCDONALD RD Owner: Name: ELROD, CLAY A & CINDY
Address: 2722 S MCDONALD RD
SPOKANE VALLEY, WA 99216
Location:: CSV
Zoning: R-2 SF Res Suburban District
Water District: 098 SPO CO WATER DIST#1 Hold: ❑
Area: 12,000 Sq Ft Width: 0 Depth: 0 Right Of Way (ft): 0
Nbr of Bldgs: 0 Nbr of Dwellings: 1
Review Information:
Review
Building Plan Review
'Released -BY: " - - - - - �••r
Originally Released: 6/24/2009 By: tmelbourn
Landuse/Zoning/HE Conditions
Released By: ,
See conditions
Originally Released: 6/24/2009 By: kkendall
Permits•
Operator: jmm Printed By: JD
Print Date: 6/25/2009
Project Number: 09001856 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 6/25/2009 Page 2 of 2
Building Permit
Contractor: OWNER Firm: OWNER
Phone: (000) 000-0000
This Application: Total Project:
Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation
DECK OPEN R-3 VB REPLACE 336 $5,040.00 336 $5,040.00
DECK
Item Description
RESIDENTIAL PERMIT FEE
WSBCC SURCHARGE
SF PLNS RVW < 7999 SQ FT
Totals: 336 $5,040.00 336 $5,040.00
Units Unit Desc
1 SELECT
I SELECT
1 SELECT
Fee Amount
$125.25
$4.50
$50.10
Permit Total Fees: $179.85
Notes:
The 12' x 24' deck must remain 20 feet or greater from the rear yard (west lot line) and 15 feet from
28th Avenue.
Payment Summary: ,
Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing
Building Permit $179.85 $179.85 $33.30 $146.55
$179.85 $179.85
$33.30 $146.55
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: jmm Printed By: JD
Print Date: 6/25/2009
Spokane.
Valley®
.'.•v�'w ..i;.4 r3 �"'+. L�:f+ +,.L 1'. ,.{'., tA •w.. -. r _ .
For City Use Only
PLUS Project Number Q /95t9/� r
779.2.Project Address . S /t % ns(
11703 E Sprague Ave Suite 8-3 • Spokane Valley WA 99206 -
509.688.0036 ♦ Fax: 509.688.0037 • permitcenter@spokanevalley.org
•
As part of our on-going commitment to customer service during ' the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet thisdate, we will contact you with a revised target 4ate. .
Your application review TARGET DATE -is � 9k0/0'i
I
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
i Submit complete, accurate plans and documents.
Extra time may be -required for re-s:ibmittals as project application reviewers' work on multiple applications and it
may be several dates before they can look at your new or revised information. :
i Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the•City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process. •
i Call staff regarding the status of your project only after the target date shown at the topof the page: •
Although von should be contacted on or by the target date. please ftel free to contact' us if you haven't heard from us
by your target date. Staff may contact you before the target date n?f the initial review is complete. By following this
procedure. you will save time and allow the reviewers to complete the work inure expeditiously.
•
Steps in the Permit Process
1. Counter Complete. Your application. has. been accepted as counter complete. This means' all of the required
documents, as indicated on your Pre -Application Checklist have been submitted, or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information. as a result of their technical review.
2. Quality Check. The next step in the process is a quality.check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical, review once it is started. When
this step is complete, your application will be'routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete:
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE—APPLICANT PINK—BUILDING FILE REV9/07
Sp 1 ne®
Walley.
11703 E Sprague Ave, Suite B-3
Spokane Valley, WA 9
(509)688-0036 R
www.spokagitrall6felvi
Community Development
Residential Construction
Permit Application
NIFILEsir q,VP
2Q09
PERMIT CEN
PERMIT NUMBER:
PERMIT FEE:
New Construction
'tion/Remodel
n Other:
❑ Accessory Bldg
4c -Deck
SITE ADDRESS: 21 �— S•
ASSESSORS PARCEL NO: LEGAL DESCRIPTION:
Building Owner:
Name: G`c, ,, - Eldbd
Address: 27 24_ S 144, d a ..441.1 i -LA
City: S"p o .A„e_ State: L&J k zip:ci5 ti 4,
Phone:., _1(.4.0 i7-1-121 y Fax:
Contact Person
Name: &Ur -DA
Phone:7-z---((,o
-
Describe the scope of work in detail:
Contractor:
i•wvvJ. a,.. .. ...
DIMEN IONS:
/4
# OF STOP r �S
Name: r1 ) �Qr
(`/
MAIN FLO R TO SQ.
FTG: N in
2NU FLOOR Q. FTG:
141/4
Address:
IMPERVIOUS SURFACE
AREA: N /JA
FINISHED BASEM NT
SQ. FTG: DJA
City:
State:
Zip:
Phone:
Fax:
SOU
Contractor Lic No:
Exp Date:
City Business Lic. No:
Cost of Project: $
Proposed Use: P/`otJ a S�
•(write N/A if not applicable)**********************
.. .. --•----------- ------ J.0 avuv..auS
HEIGHT TO EAK:
i•wvvJ. a,.. .. ...
DIMEN IONS:
/4
# OF STOP r �S
TOTAL HABITABLE SPACE:
MAIN FLO R TO SQ.
FTG: N in
2NU FLOOR Q. FTG:
141/4
UNFIN BASE NT SQ. FTG :
IMPERVIOUS SURFACE
AREA: N /JA
FINISHED BASEM NT
SQ. FTG: DJA
:
GARAGE SQ. ix:
!vA
I DCK/C OV. PATIO SQ. FTG:
\:_5P__:,' -'S-3 3 6
30% SLOPES ON
PROP -TY:
# OF BEDROOM •
CONSTTR,UCTIION TYPEHEAT
SOU
alp R SEPTIC?
The permitee verifi, acknowledges and agrees by their signature that 1) If this permit is for construction of or on a dwelling, the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or
local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before
this application can be.Rrocessed.
SIGNATURE:
Method of Payment:
❑ Cash
Bankcard #:
Authorized Signature:
REVISED 2/15/07
❑ Check
DATE:
D Mastercard 0 VISA
Expires: VIN#:
RECEIVED
JUN 2 4 2009
SSuP AR MK.A E ENVAt1EYTF
CQ MUNITY DEVELOP f
1 I
(Y'5 `fl
rs *
(le
to I 1 i
4•
lY