2013, 03-06 Permit: SW-13000144 SewerSPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW -13000144
Permit Issued Date: 03/06/2013
Project Description:
Project Name:
Primary Contact:
Phone:
SEWER CONNECTION
PINE ROCK RIDGE 3RD
JEWELL EXCAVATING & CONST INC
509-927-9600
Applicant: JEWELL EXCAVATING & CONST INC
Address
Phone:
Email:
PO BOX 280
GREENACRES, WA 99016
509-927-9600
SITE INFORMATION:
Site Address:
Parcel Number:
3811 S MCDONALD LN
45345.3505
Assessor's Description: PINE ROCK RIDGE 3RD ADD PUD
(AFN# 5495540)
Inspection Area: : (509)-477-3675
Zoning:
LT 5
BLK 3
Owner:
Address:
Phone:
Email:
BAR 4 BAR INC
PO BOX 867
VERADALE, WA 99037
Water District: Model Irrigation District #18 Fire District: Spokane Valley Fire
Land Area: 8060 Square Feet
CONTRACTOR INFORMATION:
JEWELEC033JG, Exp. 04/07/2014
JEWELL EXCAVATING & CONST INC
PO BOX 280
GREENACRES, WA 99016
509-927-9600
DETAILS:
Class
Type
Quantity Unit Charge Value
SEWER SEWER CONNECTION
FEE DETAIL:
Processing - Utilities
Utilities Permit
Total Fee:
$26.32
$125.00
$151.32
1 S125.00 $125.00
$125.00
CONDITIONS•
Inside Public Transit Benefit Area
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
Date Printed: 03/06/2013 11.09:22 Project Coordinator Kathy Cummings
SPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW -13000144 Permit Issued Date: 03/06/2013
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Pnnted: 03/06/2013 11:09:22
Project Coordinator: Kathy Cummings