Loading...
2012, 09-05 Permit App: BLD-2012-1499 ResidenceValley. *Oct # /3(0(— 12—/f-/? RECEIVED Community DAvelopment De artment Permit CenterEP 0 5 2012 11703 East Sprague Avenue, Suite 6-3 Spokane,Vall,ey,,WA 99206 Tel: (5Q )\688.1oo36AIT CENTER Fax: (509) 688-0037 S Dbl^titceliterPspokanevallev.org ...w..� Tii V. It • /'9 (Staff Use Only) PERMIT NUMBER: PERMIT FEE: RESIDENTIAL CONSTRUCTION PERMIT APPLICATION ig NEW CONSTRUCTION ADDITION/REMODEL 0 ACCESSORY BUILDING D OTHER El DECK SITE ADDRESS: 38 1(0 S. (1'FbOiwo..b L1ad.3C ASSESSORS PARCEL NO.: 463+2., 31-1-1O LEGAL DESCRIPTION:cip.&oc.K- 3— L.cTi6)8L.K Z BUILDING OWNER NAME: • INIE3TS \cK� SP -a-3(3 NAME: ADDRESS: 2--567 S'L�,�t CITY: C C e.6 CY STATE: r/-+' ZIP: 9901(o PHONE: FAX: CELL: CONTACT NAME: •B12.)4a).) PHONE: ), CJZ.24-7/., (SIO FAX:. 39Z', /%1l c!) CELL: CONTRACTOR NAME: LE_xii/&%c Ai 77'5I92ssi )dac3. MAILING ADDRESS: P 0- 005L 1 y-17 CITY: T CS STATE: 0-.)7� ZIP: 7A44 - PHONE: SCA, c3ZL/S-/'3 FAX: 50 9, esll /z-OSCELL: CONTRACTOR LICENSE No.: t_6X I:4}d I ozsa71/4EXPIRES: slit) zol4 CITY BUSINESS LICENSE NO.: DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE & PROPOSED USE: /Jei.4_, s FR. ****YOU MUST COMPLETE THE FOLLOWING**** ,MARK N/A IF NOT APPLICABLE Height to Peak: Z-1' — 9 ” Dimensions:„ SS X 42 —C. No. of Stories: 2 Total Habitable A� Space: 2.262/1 Main Floor SQ FT: /06111- Upper Floor SQ FT: /000 Unfinished Basement SQ FT: $/7O Finished Basement SQ FT: ' ill Garage SQ FT: i 2Z Deck/Covered Patio SQ FT: / 2.0 Impervious Surface Area: 3 0608 300/o Slopes on Property: tic No. of Bedrooms: 4 Construction Type: Heat Source: 4r -A. Sewer or Septic: 5E iz., TOTAL COST OF PROJECT: $ /53, 000 DISCLAIMER The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development code. Referenced cdes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit is not a permit or approv or any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information maybe r quired to be submitted,pg subsequently approved before this application can be proce9ssed. Effe&tivet0ctober 28, 2007' P:\Community Development \02 Administration \03 Forms - Official Versions\Permit'Center\Residential Construction Permit App 10.28.07.doc Page 1 of 2 • • Signature Date: Method of payment: ❑ Cash ❑ Check Bankcard #: ❑ Visa ❑ Mastercard EXP: VIN#: Authorized Signature: Effective October 28, 2007. Page 2 of 2 P:\Community Development\02 Administration\03 Forms - Official Versions\Permit Center\Residential Construction Permit App 10.28.07.doc ,r • � Sp®lane 4000Valley • Target Date sheet For City Use Only PLUS Project R I r( -LO j l- 1'I � �1/) S Project Address !f-, 5 Mc lacy 1rf 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206 509.720-5240 1 Fax: 509.688.0037 1 permitcenter@spokanevaltey.org 00 As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is 9i-Iz- Iz The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review D Submit complete, accurate plans and documents. Extra time may be required for re -submittals as protect application reviewers work on multiple applications and 11 may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the Cay can be changed, one individual with the expertise for dealing with reviewer comments would he the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should he contacted on or by the target date, please feel free to contact us ifyou haven'1 heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By fallowing this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical, compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. CD -003 V-7/ 06-21-11 Page 1 of 1 GARAGE PLANNING DEPT. APPROVE BY. DATE: 9 /5boa Ale(iA�r.. ' 3816 S McDonald Ln Block 2 / Lot 10 Pine Rock Ridge 3rd Addition PUD 8,125 Sqft 5'-2" 65.00' • _I PATIO BASEMENT COVERED PIRCH cJf FAMILY ROOM Prole( SUL 53'-0" DRIVE CO PLOT PLAN SCALE: 1" - 20' 65.00' 1 �Im G1 14)W -12.-P-157 RECEIVED SEP 0 5 2012 SV PERMIT CENTER REV. # Utdi y Easement 1 LEXINGTON HOMES PO BOX 141749 SPOKANE, WA 99214 Phone: (509) 924-1519 Fax: (509)892-1208 CLIENT: JAY INVESTMENT CO. ADDRESS: 3816 S. MCDONALD LANE PLATT INFO: Parcel #: 45342.3410 Block 2/Lot 10 Pine Rock Ridge 3rd Addition PUD 8125 Sqft BUILDER INFO: LEXINGTON HOMES PO BOX 141 49 (509) 924-159