2012, 09-25 Permit: SW-12002264 SewerSPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Application Number: SW -12002264
Permit Issued Date:
09/25/2012
Expiration Date:
Project Description:
Project Name:
Permit Type:
SEWER CONNECTION
PINE ROCK ADD #3
SEWER
Primary Contact DIST 17 COMMUNITY COLLEGES &
FOUNDATION
Applicant: DIST 17 COMMUNITY COLLEGES &
FOUNDATION
501 N RIVERPOINT BLVD
SPOKANE, WA 99202-1659
Address:
Phone:
Email:
SITE INFORMATION:
Site Address:
Parcel Number:
Subdivision:
Assessor's Description
Inspection Area.
Zoning:
3818 S MCDONALD LN
45342.3411
PINE ROCK RIDGE 3RD
ADDITION
PINE ROCK RIDGE 3RD ADD PUD LT 11
2 (AFN# 5495540)
BLK
Owner:
Address:
Phone.
Email:
DIST 17 COMMUNITY COLLEGES &
FOUNDATION
501 N RIVERPOINT BLVD
SPOKANE, WA 99202-1659
Water District: Model Fire District: Spokane Valley Fire
Irrigation District #18
Land Area: 8125 Square Feet
CONTRACTOR INFORMATION:
General Contractor
GARCOC'228PF
GARCO CONSTRUCTION
P.O. BOX 2946
SPOKANE, WA 99220
509-535-4688
DETAILS'
Class
Type
Quantity Unit Charge Value
SEWER SEWER CONNECTION
FEE DETAIL'
Processing - Utilities
Utilities Permit
1
3125.00 $125.00
$125.00
Total Fee:
$25 94
$125.00
$150.94
CONDITIONS:
Inside Public Transit Benefit Area
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
Date Printed: 09/25/2012 07:55:07
Printed by IIS APPPOOLWSP.NET v4 0
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
- Permit Issued Date:
Application Number: SW -12002264 09/25/2012
Expiration Date:
CALL 1-800-424-5555 BEFORE YOU DIG—AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR 8 INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 09/25/2012 07:55 07
Printed by:115 APPPOOLtASP.NET v4 0