2009, 12-30 Permit App: 09004023 Enclose DeckProject Number: 09004023 Inv: I
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 12/30/2009 Page 1 of 2
Project Information:
Permit Use: ENCLOSED EXISTING DECK -FRONT OF HOME Contact: ABRAHAM CONSTRUCTION
Address: 1920 N GREENACRES
C - S - Z: SPOKANE VALLEY, WA 99016
Setbacks: Front Left: Right: Rear: Phone: (509) 499-2792
Group Name:
Site Information: Project Name:
Plat Key: 002092 Name: PONDEROSA 03RD ADD District: Sout
Parcel Number: 45321.1701
SiteAddress: 3813 S MERCY CT
Location:: CSV
Block: Lot:
Owner: Name: OLSEN, KENNETH
Address: 3813 S MERCY CT
SPOKANE VALLEY, WA 99206
Zoning: R-3 SF Res District
Water District: 101 SPO CO WATER DIST#3B Hold: ❑
Area: .00 Acres Width: 120 Depth: 130 Right Of Way (ft): 0
Nbr of Bldgs: 0 Nbr of Dwellings: 1
Review Information:
Review
Building Plan Review
Originally Released: 12/30/2009 By: TMELBOU
Landuse/Zoning/HE Conditions
Originally Released: 12/18/2009 By: mharnois
Permits:
Operator: jmm Printed By: jmm Print Date: 12/30/2009
Project Number: 09004023 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 12/30/2009 Page 2 of 2
Building Permit
Contractor: ABRAHAM CONSTRUCTION Firm: ABRAHAM CONSTRUCTION
Address: 1920 N GREENACRES Phone: (509) 499-2792
SPOKANE VALLEY, WA 99016
This Application: Total Project:
Description Grp 'km Notes Su Ft Valuation So Ft Valuation
1&2 FAMILY R-3 VB REMODEL 0 $1,500.00 0 $1,500.00
Item Description
RESIDENTIAL PERMIT FEE
WSBCC SURCHARGE
SF PLNS RVW < 7999 SQ FT
Totals: 0 $1,500.00 0 $1,500.00
Units Unit Desc
1 SELECT
1 SELECT
1 SELECT
Fee Amount
$69.25
$4.50
$27.70
Permit Total Fees: $101.45
Notes:
Conditions of approval exist for lots served by Ponderosa Ln. A habitat management plan is on file.
See file for Ponderosa Ln. - jforry
Payment Summary:
Permit Type
Building Permit
Fee Amount Invoice Amount Amount Paid Amount Owing
$101.45 $101.45
$27.70 $73.75
$101.45 $101.45 $27.70 $73.75
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: jmm Printed By: jnun Print Date: 12/30/2009
Stoon"liane
CITY OF SPOKANE VALLEY
Community Development Department
Permit Center
11703 East Sprague Avenue, Suite B-3
Spokane Valley, WA 99206
Tel: (509) 688-0036
Fax: (509) 688-0037
permitcenter@spokanevalley.orq}sr:rmitt;li tA_.
PERMIT NUMBER:
PERMIT FEE:
(Staff Use Only)
023
RFCF, fEL)
CSV PERMIT CENTER
i
Project # y((c21__�9
RESIDENTIAL CONSTRUCTION PERMIT APPLICATION
❑ NEW CONSTRUCTION ❑ ADDITION/REMODEL ❑ ACCESSORY BUILDING
0 DECK OTHER
SITE ADDRESS: 3 5 rYlerci
ASSESSORS PARCEL NO.: 453 , /70 LEGAL DESCRIPTION: PotyiGi.e-rc -„ v Alt Lf $3
BUILDING OWNER NAME: rexr-D
NAME:
(cc v -n 1 01set-t._
ADDRESS: 3./6 /vie Ye )i Pr
CITY: Sp[5l1e 4. - Q-- LG- (1.2_.y
PHONE:
CONTACT NAME:
STATE: W
FAX:
CELL:
zip: 99,20Co
5a9 9'63-`3/94
PHONE: 1,(3,-r y Mom / emerj FAX: CELL: 569 - ? S' -,::2772
CONTRACTOR NAME: 41) 6_441 (, its -/-
MAILING
-
MAILING ADDRESS:
CIrv:
/9;0 I4/ (e-eetta c e5
ape kaA.442 Ue .11� y
PHONE: FAX:
STATE: 04L ZIP: 1'47014,
so?-Fs9V715 CELL: 5-69 -1/9 9- 27S
CONTRACTOR LICENSE No.: 464140 933 EXPIRES: ifyillie,1/200#/ CITY BUSINESS LICENSE NO.: Got Lvy6—
/ /�
DESCRIBE THE SCOPE OF WORK IN DETAIL AND I ICATE USE:
TO e itiC_IOSe cydst-1 dPc k ` i[.- is Covey -12:1 vviA v kot&Se-
(6 e_X; s6f-rut-turd Wf Wl�
ra ( 1t're; l i`el 7 7 sy-4 vh
PROPOSED USE:
1'lLI/
Effective October 28, 2007 Page 1 of 2
http://www.spokanevalley.org/uploads/Community_Development/Documents/Forms/Building/Residential Construction Permit
App.l.doc
****YOU MUST COMPLETE THE FOLLOWING****
MARK N/A IF N9T APPLICABLE
Height to Peak:
/V/4
Main Fldor SQ
FT: 4f/4
Garage gQ FT:
/1V/1
Dimensions:
x38,"
Upper Floor SQ
No. o
Bedrooms: N/4
FT:
Deck/Co Bred Patio
SQ FT: N/4
Construction
Type: t J/. 4
TOTAL COST OF PROJECT: $
No. of Stories:
Unfinished Basement
SQ : /
Impervious Surface
Area: /1/4
Heat Sour
Cc/ r.
Total Habitable*7r
Space: Q7 57 4 oy-
Finished Basement
SQ FT: /um
30% Slopei on
Property: NO
Sewer or
Septic: .eu..>e,y-
The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling is/willDISCLAIMER
be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property
owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of
Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of
Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional
Information may be required to be submitted and subsgquently approved before this application can be processed.
Signature
Method of payment: ❑ Cash ❑ Check
Bankcard #:
Date: by isln9
❑ Visa ❑ Mastercard
EXP: VIN#:
Authorized Signature:
Effective October 28, 2007Page 2 of 2
http://www.spokanevalley.org/uploads/Community_Development/Documents/Forms/Building/Residential Construction Permit
App.l .doc
40/\411,
*Wane
Valley®
For City Use_Only
PLUS Project Number 7 '42J
Project Address . / S /2 /0 / r f
11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206
509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org
As part of our on-going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
C/
Your application review TARGET DATE is
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
➢ Submit complete, accurate plans and documents.
Extra time may be required for re -submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
➢ Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
> Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure, you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE -APPLICANT PINK- BUILDING FILE REV 9/07
0
m
po.a.. op 3
d
a
po.a.. op 3