2010, 12-29 Permit App: BU-10004174 Residence/0416
Permit Center
Spokane 11707 E Sprague Ave, Suite 106
Valley Spokane Valley, WA 99206
V .7 (509)688-0036 FAX: (509)688-0037
Community Development ,v«ryv.spokanevallev.ora.cm
Residential Construction
Permit Application
PERMIT NUMBER: /0.- tf/7
PERMIT FEE:
ix New Construction
o Addition/Remodel
o Other:
o Accessory Bldg
❑ Deck
SITE ADDRESS 341/6 S. /Here % LA
ASSESSORS PARCEL NO: LEGAL DESCRIPTION: 4o f Z Q/K 1 RxideroSq £a S 74-
w v
Name: 0 t kAitrAd ROC rOvirtrOG f-ron
Address:
City:
Zip:
Phone:
Fax:
ontac
exso
Name: Pew.i
Phone: Z14'-y,itr
Describe the scope of work in detail:
Bu lkl a , 5P .
acJo
Name: p%v onz Zoe lc 6,4 1-h- be ho-
Address:
1e
Address: 2 4az A. Su 11IVa.led
City: SitekAv VIII' Zip: 99Z/t
Phone: 92 t/- fib y Fax: 9Z6- SO i41
Lic No: Exp. Date:
City Business Lic No:
Cost of Project:
$ 75, coo
**************The following MUST be complete: (write NIA if not applicable)**********************
HEIGHT TO PEAK: Z 5,
DIMENSIONS: SC �
# OF STORIES: 1
TOTAL HABITABLE SPACE:
/tom/
MAIN FLOOR TO SQ.
FTG: I2 //64-&
2Nu FLOOR SQ. FTG:
—"��j�
UNFIN BASEMENT SQ. FTG:
iiG
IMPERVIOUS SURFACE
AREA:
FINISHED BASEMENT
SQ. FTG: --
GARAGE SQ. FTG:
7-15703
DECK/OV. PAT Q. FTG:
' 'i�y1
30% SLOPES N
PROPERTY: �V14
# OF BEDROOMS: 3
- _ - --
CONSTRUCTION TYPE:
wood S' rix- et
HEAT pURCE:--
/Wil red (spas Furnace.
SEWER OR SEPTIC?
Se -t e✓
The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or
local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before
this application ca ,be processed.
Signature
Date 12 - 79—/40
Method of Payment: (Faxed permit applications will only be accepted with major bankcard)
❑ Cash 0 Check 0 Mastercard ❑ VISA
Bankcard #: Expires: VIN#:
❑ Other
Authorized Signature:
REVISED 8/25/2005
Spokane
jUalley
For City Use Only
PLUS Project Number ;; >y;`
Project Address
11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206
509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org
As part of our on-going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
Your application review TARGET DATE is
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Proiet t Application Review
➢ Submit complete, accurate plans and documents.
Extra time may be required for re -submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
➢ Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
➢ Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure, you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE -APPLICANT PINK - BUILDING FILE REV 9/07
SPOKE COUNUY
SPOKANE COUNTY
DEPARTMENT OF BUILDING & PLANNING
1026 WEST BROADWAY AVENUE • SPOKANE, WA 99260-0050
Site Information
Project Information
Site Address: 3810 S MERCY LN
Parcel Number: 45332.9069
Subdivision: CITY OF SPOKANE VALLEY
Block: Lot:
Zoning: UNK Unknown
Owner: CRAPO, DENNIS A & MELISSA A
Address: 2602 N SULLIVAN RD
SPOKANE VALLEY, WA 99216
Building Inspector:
Water Dist:
Project Number: 10007017 Inv: 1 Issue Date: 12/29/2010
Permit Use: SEWER CONNECTION
Applicant: DIAMOND ROCK CONSTRUCTION
2602 N SULLIVAN
SPOKANE, WA 99216 Phone: (509) 924-8964
Contact: DIAMOND ROCK CONSTRUCTION
2602 N SULLIVAN
SPOKANE, WA 99216 Phone: (509) 924-8964
Setbacks - Front:
Group Name:
Project Name:
Left: . Right: Rear:
Permits
Sewer Connection Permit
Contractor: PRECISION GRADING License #: PRECIGL97INJ
PROCESSING FEE 1 $15.00 SI SEWER CONNECTION
Total Permit Fee:
I $125.00
$140.00
**FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO
COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL
INSPECTION FEES APPLY AFTER 30 MINUTES.
**CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE
REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES,
INCLUDING THOSE RELATED TO TRENCH SAFETY.
**INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY
BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE
ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
**SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY
HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO
ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
**THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME.
BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO
OWNERS OF UNDERGROUND FACILITIES.
Payment Summary
Total Fees AmountPaid AmountOwing
$140.00 $140.00 $0.00
Tran Date
12/29/2010
Processed By: CUMMINGS, KATHY
Printed By: Force, Faith Page 1 of I
Receipt # Payment Amt
5681 $140.00
PERMIT
NOTICE
It is the responsibility of the applicant/permittee to see to it that the use described on the front of this permit complies with applicable codes and
requirements and that required inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before
progressing beyond the point where inspections are required may necessitate removal of certain parts of the construction at the applicant's/permittee's
or property owner's expense. At a minimum, the following inspections ARE REQUIRED by County Code:
1. FOOTING - all structures, including manufactured homes when forms and reinforcement are in place and prior to placement of concrete.
NOTE: This inspection includes review of the structure's setbacks from property lines. Minimum setbacks are established by County zoning
regulations. Front, flanking, side and rear yard setbacks are measured from property lines. Curb lines and fence lines are not necessarily indicative
of property lines. In some residential areas, the County can own as much as 20 feet of right-of-way between your property and the actual improved
street/curb. The responsibility to comply with applicable setback provisions lies solely with the permittee—neither Spokane County nor its authorized
representatives assume any responsibility for the verification or location of your property lines. Please verify their location prior to locating your
structure. Failure to properly locate the structure may require its relocation at the owner's/permittee's expense.
2. FOUNDATION - when forms and reinforcement are in place and prior to placement of concrete.
3. FRAMING - after all framing, bracing and blocking is in place, plumbing, mechanical rough -in inspections have been approved, and prior to
concealing.
4. INSULATION - prior to the installation of drywall.
5. PLUMBING - after rough -in, before covering, and final.
6. MECHANICAL - rough -in of piping, before covering, metal chimneys before concealment, and final.
7. FINAL - all permits - when complete and prior to occupancy and/or use. Please provide 24 hours notice.
NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site
plan) required by ordinance or as a condition of approval of this permit. Items such as the installation of fire hydrants, fire department access,
on-site drainage ('208 swales'), road improvements, parking, and landscaping are common requirements of a permit/site plan which
must be completed prior to final approval of a building or issuance of a Certificate of Occupancy.
8. MANUFACTURED HOMES - foundation inspections prior to pouring pads, inspection of blocking/tie-downs, when completed per manufacturers
installation instructions. Final Inspection approval prior to occupancy: stairs, handrails, skirting, etc., installations completed WAINS Tag(s) must be
affixed to the home, completed inspection record card and manufacturer's installation instructions must be available on site.
9. SEWERS - prior to cover
10. RIGHT-OF-WAY/APPROACH - prior to placement of concrete, or, if gravel approach, after completion.
In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc., must be inspected
prior to cover. Check with the department for "special inspections" in conjunction with commercial projects.
FOR INSPECTIONS:
TO INSURE PROMPT SERVICE, PLEASE GIVE ONE WORKING DAY/24 HOUR NOTICE .
PARTS OF YOUR PROJECT MAY REQUIRE PERMITS AND INSPECTIONS
FROM MORE THAN ONE AGENCY.
• Building, plumbing, mechanical and fire inspections, Department
of Building & Planning 477-3675
• Construction in a flood plain, Division of Engineering & Roads 477-3600
• Electrical wiring, State Department of Labor and Industries 324-2640
• On-site waste disposal system, Spokane Regional Health District
324-1560
• Road cuts for utilities or driveways, Division of Engineering &
Roads - 48-HOUR NOTICE REQUIRED 477-3600 or
State Department of Transportation 456-3000
• Sewer connection, Division of Utilities 477-3604 or City Public
Works Department 625-6300
PERMIT EXPIRATION
Unless otherwise noted, building, plumbing, fire and mechanical permits will be considered null and void by limitation if the work authorized by
the permit is not commenced within 180 days or is stopped for a period of 180 days, unless a written request for an extension of the permit is received and
approved by the Building Department prior to expiration. At a minimum an inspection should be requested at least once every 180 days to assure the
validity of the permit. Please call if you have any questions.
REFUNDS
All requests for building permit refunds must be made in writing by the applicant/permittee (shown on the reverse) no later than 180 days after the
date of fee payment. Refunds of not more than 80% of the permit fee paid may be authorized when no work has been done under the permit. No
refunds may be authorized more than 180 days after fee payment. Please contact the other agencies with respect to their refund policy on all other permit
types.
MISTAKE?
If you think we've made an error in processing this permit or find erroneous information on the permit, please bring it to our attention immediately by filing
a written request for correction within 10 working days of discovery. All such requests should be directed to the Department of Building and Planning at:
Spokane County Department of Building & Planning
1026 West Broadway Avenue Spokane, WA 99260
Phone: (509) 477-3675 Fax: (509) 477-4703 TDD: (509) 477-7133
REVISED 02/10 BLDG PERMIT
z >
3y16 S. <t� L -v.
PbrjeroSa-
PLANNING DEPS'. APPROVED
?g�,� ,\\\it(,i1
f.
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Application Number: SW -12-001050
Permit Issued Date:
04/02/2012
Expiration Date:
Project Description:
Permit Type:
SEWER CONNECTION
SEWER
Primary Contact:
Applicant:
Address:.
Phone:
Email:
NORTH ST EXCAVATION
NORTH ST EXCAVATION
1801 N ST
WAVERLY, WA 99039
208-755-9340
SITE INFORMATION:
Site Address:
Parcel Number:
Subdivision:
Assessor's Description:
Inspection Area:
Zoning:
3810 S MERCY LN
45332.3802
Ponderosa East
PONDEROSA EAST:
LOT 2 (AFN 5956625)
Owner:
Address:
Phone:
Email:
CRAPO, DENNIS A & MELISSA A
2602 N SULLIVAN RD
SPOKANE VALLEY, WA 99216
Water District: Spokane Fire District: Fire District 1
County Water District #3
Land Area: 0.2076 acres / 9044 sqft
CONTRACTOR INFORMATION:
General Contractor
NORTHE*011 KS
NORTH ST EXCAVATION
1801 N ST
WAVERLY, WA 99039
208-755-9340
DETAILS:
Class
Type
Quantity Unit Charge Value
SEWER SEWER CONNECTION
FEE DETAIL:
Processing - Utilities
Utilities Permit
1 $125.00 $125.00
Total Fee:
$125.00
$25.94
$125.00
$150.94
CONDITIONS:
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
Date Printed: 04/02/2012 14:40:04
Printed by: IIS APPPOOL\ASP.NET v4.0
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW -12-001050 04/02/2012
Expiration Date:
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 04/02/2012 14:40:04
Printed by: IIS APPPOOLASP.NET v4.0