2011, 04-01 Permit App: 10003493 ResidenceProject Number: 10003493 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Project Information:
Permit Use: SFR W/ATT GAR Contact: DIAMOND ROCK CONSTRUCTION
Address: 2602 N SULLIVAN RD
C - S - Z: SPOKANE VALLEY, WA 99216
Setbacks: Front Left: Right: Rear: Phone: (509) 924-8964
Group Name:
Project Name:
Date: 4/1/2011 Page 1 of 3
Site Information:
Plat Key: Name: Range
Parcel Number: 45332.3803 Block: Lot:
SiteAddress: 3820 S MERCY LN
Location:: CSV
Zoning: R-2
Water District:
Area: 10,476 Sq Ft
District: Sout
Owner: Name: CRAPO, DENNIS A & MELISSA A
Address: 2602 N SULLIVAN RD
SPOKANE VALLEY, WA 99216
SF Res Suburban District
Width: 0
Nbr of Bldgs: 0 Nbr of Dwellings: 0
Review Information:
Review
Building Plan Review
Hold: [:
Depth: 0 Right Of Way (ft): 0
Released By:
Originally Released: 10/25/2010 By: tmelbourn
Landuse/Zoning/HE Conditions
Released By:
Driveway/Approach
Sewer Review
Permits:
Operator: JD
Originally Released: 4/1/2011 By: mpalaniuk
Released By:
Originally Released: 4/1/2011 By: jdavis
Printed By: jmm
Released By:
Print Date:
4/1/2011
Project Number: 10003493
Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 4/1/2011 Page 2 of 3
Contractor: DIAMOND ROCK
Address: 2602 N SULLIVAN
SPOKANE VALLEY WA 99216
Description Tvpe Notes
1&2 FAMILY R-3 VB
BASEMENT U R-3 VB
COV DECK R-3 VB
GAR WOOD U-1 VB
Item Description
RESIDENTIAL PERMIT FEE
WSBCC SURCHARGE
SF PLNS RVW < 7999 SQ FT
Contractor:
Address:
Building Permit
Firm: DIAMOND ROCK CONSTRUCTIO
Phone: (509) 924-8964
This Application:
Sa Ft Valuation
1,702 $168,412.90
1,702 $25,530.00
54 $810.00
783 $14,877.00
Totals: 4,241 $209,629.90
Units Unit Desc
1 SELECT
1 SELECT
1 SELECT
Permit Total Fees:
Mechanical Permit
SPOKANE HEATING & COOLING
PO BOX 28929
SPOKANE WA 99228
Item Description
DUCT WORK SYSTEM
GAS WATER HEATER
GAS APPLIANCE<=100,000BTU
GAS PIPING
VENTILATING FANS 1 DUCT
CLOTHES DRYER
HOOD -TYPE II
Total Project:
Sq Ft Valuation
1,702 $168,412.90
1,702 $25,530.00
54 $810.00
783 $14,877.00
4,241 $209,629.90
Fee Amount
$1,609.75
$4.50
$643.90
$2,258.15
Firm: SPOKANE HEATING & COOLING
Phone: (208) 755-8345
Units Unit Desc
1 NUMBER OF
1 NUMBER OF
1 NUMBER OF
2 # OF UNITS
3 NUMBER OF
1 NUMBER OF
1 NUMBER OF
Operator: JD Printed By: jmm
Permit Total Fees:
Print Date:
Fee Amount
$11.00
$11.00
$13.00
$2.00
$33.00
$10.00
$11.00
$91.00
4/1/2011
Project Number: 10003493 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 4/1/2011 Page 3 of 3
Contractor: GOLD SEAL MECHANICAL INC
Address: 5524 E BOONE AVE
SPOKANE, WA 99212
Item Description
TOILETSBIDETS
SINKS
SHOWERS
TUBS
DISH WASHERS
CLOTHES WASHER
MISCELLANEOUS FIXTURES
Notes:
Payment Summary: ,
Permit Type
Building Permit
Mechanical Permit
Plumbing Permit
Plumbing Permit
Firm: GOLD SEAL MECHANICAL INC
Phone: (509) 535-5944
Units
2
5
1
2
1
1
2
Fee Amount
$2,258.15
$91.00
$84.00
$2,433.15
Unit Desc
NUMBER OF
NUMBER OF
NUMBER OF
NUMBER OF
NUMBER OF
NUMBER OF
NUMBER OF
Permit Total Fees:
Invoice Amount
$2,258.15
$91.00
$84.00
$2,433.15
Fee Amount
$12.00
$30.00
$6.00
$12.00
$6.00
$6.00
$12.00
$84.00
Amount Paid
$628.22
$0.00
$0.00
$628.22
Amount Owing
$1,629.93
$91.00
$84.00
$1,804.93
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: JD Printed By: jmm Print Date: 4/1/2011
Spokane
.0... Valley
Permit Center
11707 E Sprague Ave, Suite 106
Spokane Valley, WA 99206
(509)688-0036 FAX: (509)688-0037
Community Development wWw.spokanevalley.org.com
Residential Construction
Permit Application
r New Construction
❑ Addition/Remodel
❑ Other:
❑ Accessory Bldg
o Deck
SITE ADDRESS 31 Zo S. intr. 4 y 401 .
ASSESSORS PARCEL NO: LEGAL DESCRIPTION: Lot 3 grtderora £AST
%Tait" ex ' .
yr t
sal ,, °
Name: Qiarvtorui
2ibe
terns f.
Address:
IMPERVIOUS SURFACE
AREA:
FINISHED BASEMENT
SQ. FTG: '�
City:
DECK/?e V. P TIQ SQ. FTG:
5'r - _
Zip:
Phone:
Fax:
HEAT SOURCE:
Nr i -v l (,as F.rwAce
Name: ret,
Phone: z (%C—K9 Z.
Describe the scope of work in detail:
td a Att./ S (
Con.. ,.a
Name: p m wt„,,„/ i coinst.
Address: 246z AL 5,I//va.i Fd
City: Spbkcaitt silty Zip: tjA.
Phone: QZei — ' G ei Fax: 9z4-1.0 9c/
Lic No: Exp. Date:
City Business Lic No:
Cost of Project:
$ 70,000
**************The following MUST be complete: (write N/A if not applicable)**********************
HEIGHT TO PEAK:Z 3 t
DIMENSIONS: �X �OI
52
# OF STORIES:
TOTAL HABITABLE SPACE*
33 'f 347o
MAIN FLOOR TO SQ.
FTG:
2Nu FLOOR SQ. FTG:
UNFIN BASEMENT SQ. FTG:
IMPERVIOUS SURFACE
AREA:
FINISHED BASEMENT
SQ. FTG: '�
GARAGE SQ. FTG:
-7 S. 3 Via_
DECK/?e V. P TIQ SQ. FTG:
5'r - _
30% SLOPES ON
PROPERTY: Nl Ar
SEWER OR SEPTIC?
5 -ewe,/
# OF BEDROOMS: 3
....._. - ----
CONSTRUCTION TYPE:
t.,anod Fr v% i
HEAT SOURCE:
Nr i -v l (,as F.rwAce
The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or
local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before
this application can be processed.
Signature
(/tAAL
Date
Method of Payment: (Faxed permit applications will only be accepted with major bankcard)
0 Cash ❑ Check ❑ Mastercard 0 VISA
Bankcard #: Expires: VIN#:
lo— zi -w
❑ Other
Authorized Signature:
REVISED 8125/2005
Spokane's°''
i�Ualley
Community Development
Permit Center
11707 E Sprague Ave, Suite 106
Spokane Valley, WA 99206
(509)688-0036 FAX: (509)688-0037
www.spokanevalley.ora.com
Mechanical Permit Application
o Commercial XResidential
SITE ADDRESS 3 8Zo S. /14.tre I L✓ -
Building owner
Name: C .w..v+,A Rehr K eitu S t Phone: q q- set tea ci Fax
Address: City State Zip
Contractor ,-.:,
Name: Spake.. t �•C`+rv*, Phone: Fax:
Address: f City State Zip
License No: City Business License No:
.(°'/�1 t ,� n M rDY i
oatxp�`"'� ��. , �r-,�� �yy'iyyy ' ., .... ; .. � _ „F , .' , . �� �' .., L. ,�i:4 �.^ ...� _
Name:
vA(Phone: 21
p -q 9 Zy
DESCRIPTION OF WORK
# OF UNITS
X
COST
=
TOTAL AMOUNT
1
FUEL BURNING APPLIANCE
Equal to or less than 100,000 _
I
X
$12.00
=
1 Z.
2
FUEL BURNING APPLIANCE
More than 100,000
X
$15.00
=
3
UNLISTED APPLIANCE (Additional Fee)
Equal to or less than 400,000
X
$50.00
=
4
UNLISTED APPLIANCE (Additional Fee)
More than 400,000
X
$100.00
=
5
USED APPLIANCE (WSEC min. AFUE rating)
Equal to or less than 400,000
X
$50.00
=
6
USED APPLIANCE (WSEC min. AFUE rating)
More than 400,000
X
$100.00
=
7
BOILER/REFRIGERATION
1 - 100M BTU
X
$12.00
=
8
BOILER/REFRIGERATION
101 - 500M BTU
X
$20.00
=
9
BOILER/REFRIGERATION
501 - 1,000M BTU
X
$25.00
=
10
BOILER/REFRIGERATION
1,001 - 1,750M BTU
X
$35.00
=
11
BOILER/REFRIGERATION
More than 1,750M BTU
X
$60.00
=
12
GAS LOG, GAS INSERT, GAS FIREPLACE
X
$10.00
=
13
RANGE
X
$10.00
=
14
DRYER
1
X
$10.00
=
10
15
FUEL BURNING WATER HEATER
1
X
$10.00
=
10
16
MISC. FUEL BURNING APPLIANCE
X
$10.00
=
17
GAS PIPING (each outlet)
Z-
X
$1.00
=
Z.
18
DUCT SYSTEMS
1
X
$10.00
=
/ 0
19
VENTILATING FANS
3
X
$10.00
=
30
20
AIR HANDLER (DOES NOT include ducting)
Equal to or less than 10,000 CFM
X
$12.00
=
21
AIR HANDLER (DOES NOT include ducting)
Greater than 10,000 CFM
X
$15.00
=
22
EVAPORATIVE COOLERS
X
$10.00
=
23
TYPE I HOOD
X
$50.00
=
24
TYPE II HOOD
1
X
$10.00
=
/D
25
HEAT PUMP/AIR CONDITIONER
0-3 TON
X
$12.00
=
26
AIR CONDITIONER
3-15 TON
X
$20.00
=
27
AIR CONDITIONER
15-30 TON
X
$25.00
=
28
AIR CONDITIONER
30-50 TON
X
$35.00
=
29
AIR CONDITIONER
More than 50 TON
X
$60.00
=
30
LPG STORAGE TANK
X
$10.00
=
31
WOOD OR PELLET STOVE/INSERT
X
$10.00
=
32
WOOD STOVE - FREE STANDING
X
$25.00
=
33
REPAIR & ADDITIONS
X
$15.00
=
34
VENTILATION SYSTEMS
X
$12.00
=
35
VENTILATION MECHANICAL EXHAUST_
X
$12.00
=
36
INCINERATOR - RESIDENCE
X
$19.00
=
37
INCINERATOR - COMMERCIAL
X
$22.00
=
METHOD OF PAYMENT:
❑CASH 0 CHECK 0 VISA 0 MC
CARD #:
SUBTOTAL
7K
DATE:
PROCESSING FEE
$35.00
EXPIRES.
TOTAL PERMIT FEE DUE:
AUTHORIZED SIGNATURE:
REVISED 8/26/05
Permit Center
2:>C1ley
11707 E Sprague Ave, Suite 106
Spokane Valley, WA 99206
(509)688-0036 FAX: (509)688-0037
Community Development ww•w.spokanevallcy.orL.com
Plumbing Permit Application
o Commercial j Residential
SITE ADDRESS 31 10 S, AkerCy LA •
Building owner
Name: Orkwner.A C.
Address:
Phone: iv{ — I ci
City
Fax
State
Zip
Contractor .
Name: Geb t cJ Stat AleC I .
Address:
Phone:
Fax:
City
State
Zip
License No:
City Business License No:
act;.4
Name: 1:7I2 A
Phone: Zig 4?ZN
AUTHORIZED SIGNATURE:
REVISED 8/26/05
DESCRIPTION OF WORK
# OF UNITS
X
COST
=
TOTAL AMOUNT
1
TOILETS
WATER CLOSET, BIDETS
Z
X
$6.00
=
% Z.
2
URINALS
X
$6.00
=
3
TUBS
Z
X
$6.00
=
11-
Z4
4
SHOWERS (PER TRAP)
BATH, STALL, ON-SITE BUILT
L
X
$6.00
=
4
5
SINKS
LAVS/BASINS, BAR, FLOOR, KITCHEN,
LAUNDRY, UTILITY, JANITOR, PHOTO,
X-RAY, FOOD, PREP/CULINARY MEAT
5
X
$6.00
=
3 v
6
DISHWASHER
1
X
$6.00
=
G
7
CLOTHES WASHER
1
X
$6.00
=CIP
8
GARBAGE DISPOSAL
X
$6.00
=
9
WATER SOFTENER
X
$6.00
10
ELECTRIC HOT WATER TANK
NOTE: IF GAS, SEE MECHANICAL
X
$6.00
=
11
FLOOR DRAINS
AREA, CASE, COIL, TRENCH, CONDENSATE
X
$6.00
=
12
ROOF DRAINS/OVERFLOW
DRAINS
X
$6.00
=
13
FOUNTAINS, DRINKING
X
$6.00
=
14
WATER PIPING/DRAIN-IN WASTE,
VENT, PLUMBING, REVERSAL
NSTALLATION, ALTERATION, REPAIR,
REVERSALS
X
$6.00
=
15
SEWAGE EJECTOR
GRINDER, SUMP PUMP
X
$6.00
=
16
WATER USING DEVICE
ICE AN/OR COFFEE MAKER, HOSE BIB,
STEAMER
PROOFER, CARBONATOR, SWAMP COOLER
Z.
X
$6.00
=
I 2.
17
CROSS CONNECTION DEVICE
VACUUM BREAKER, CHECK VALVE,
AND R.P.B.P.D. FOR: VATS, TANKS, BOILERS
X
$6.00
=
18
INTERCEPTORS
GREASE TRAP, SAND TRAP,
CHEMICAL HOLDING TANK
X
$6.00
=
19
MEDICAL GAS (per outlet)
NITROUS, OXYGEN
X
$6.00
20
MISCELLANEOUS PLUMBING
FIXTURE
X
$6.00
=
21
PRIVATE SEWAGE DISPOSAUSYS
X
$20.00
=
22
INDUSTRIAL WASTE
INTERCEPTOR
X
$15.00
=
METHOD OF PAYMENT:
0 CASH 0 CHECK
DATE:
SUBTOTAL
-!
8 u
0 VISA 0 MASTERCARD
PROCESSING FEE
$35.00
EXPIRES:
TOTAL PERMIT FEE DUE:
AUTHORIZED SIGNATURE:
REVISED 8/26/05
SPOKE COUI\trY
SPOKANE COUNTY
DEPARTMENT OF BUILDING & PLANNING
1026 WEST BROADWAY AVENUE ' SPOKANE, WA 99260-0050
Site Information
Project Information
Site Address: 3820 S MERCY CT
Parcel Number: 45321.9004
Subdivision: RANGE
Block: Lot:
Zoning: UNK Unknown
Owner: DIAMOND ROCK CONSTRUCTION
Address: 15321 E MISSION AVE
VERADALE, WA 99037 -
Building Inspector: None
Water Dist:
Project Number: 10005900 Inv: 1 Issue Date: 10/25/2010
Permit Use: SEWER CONNECTION
Applicant: DIAMOND ROCK CONSTRUCTION
15321 E MISSION AVE
VERADALE, WA 99037- Phone: (509) 924-8964
Contact: DIAMOND ROCK CONSTRUCTION
15321 E MISSION AVE
VERADALE, WA 99037- Phone: (509) 924-8964
Setbacks - Front:
Group Name:
Project Name:
Left: • Right: Rear:
Permits
Sewer Connection Permit
Contractor: PRECISION GRADING License #: PRECIGL971NJ
PROCESSING FEE
1 $15.00 S1 SEWER CONNECTION 1 $125.00
Total Permit Fee: $140.00
**FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO
COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL
INSPECTION FEES APPLY AFTER 30 MINUTES.
**CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE
REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES,
INCLUDING THOSE RELATED TO TRENCH SAFETY.
**INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY
BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE
ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
**SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY
HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO
ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
**THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME.
BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO
OWNERS OF UNDERGROUND FACILITIES.
Payment Summary
Total Fees AmountPaid AmountOwing
$140.00
$140.00 $0.00
Tran Date
10/25/2010
Receipt #
4774
Payment Amt
$140.00
Notes / Conditions of Approval
FELTS FIELD AIRPORT OVERLAY ZONE
FIRE DISTRICT #1 - PLAN REVIEW FEE IS REQUIRED FOR ALL SITE PLAN REVIEWS CONDUCTED BY FD #1.
Processed By: DOMPIER, DAWN
Printed By: Leinley, Linda
Page 1 of 1
PERMIT
)1- ki ti 41 1 UL VY 0 V0 . 1 VI
VV-EgkEVaipatigtgg;a&'tor0.togfaaakoiOtgWS',4r.aOr4t000)OAaroVig.'r;aeliF)iK,t(V'oiiiiaiiiiitiF.=Ri-,i)ii.ioY;.iot,::gii,
i/
/1
.•'
382e? 1,4Aerpi
3 eovtakere.k. &Ls+
PLANNING DEPT. APPROVED
DATE: lahoif
onl
eos
...................... • • • • • • • • • • • • • •,-• ." • • • • •
1
. a
4,4• . k.
N
..ettee0081)
•-*/
°_0°
cerogt4N
4,"
Spokane
jUalley
For City Use Only
PLUS Project Number
Project Address
11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206
509.688.0036 • Fax: 509.688.0037 • permitcenter@spokanevalley.org
As part of our on-going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
cri
Your application review TARGET DATE is
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
> Submit complete, accurate plans and documents.
Extra time may be required for re -submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
> Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
> Call staff regarding the status of your project only after the targeYdate shown at the top of the page.
Although you should be contacted on or by thetarget date, ple feel free to contact us if you haven't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure, you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE -APPLICANT PINK - BUILDING FILE
REV 9/07