Loading...
2011, 04-01 Permit App: 10003493 ResidenceProject Number: 10003493 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Information: Permit Use: SFR W/ATT GAR Contact: DIAMOND ROCK CONSTRUCTION Address: 2602 N SULLIVAN RD C - S - Z: SPOKANE VALLEY, WA 99216 Setbacks: Front Left: Right: Rear: Phone: (509) 924-8964 Group Name: Project Name: Date: 4/1/2011 Page 1 of 3 Site Information: Plat Key: Name: Range Parcel Number: 45332.3803 Block: Lot: SiteAddress: 3820 S MERCY LN Location:: CSV Zoning: R-2 Water District: Area: 10,476 Sq Ft District: Sout Owner: Name: CRAPO, DENNIS A & MELISSA A Address: 2602 N SULLIVAN RD SPOKANE VALLEY, WA 99216 SF Res Suburban District Width: 0 Nbr of Bldgs: 0 Nbr of Dwellings: 0 Review Information: Review Building Plan Review Hold: [: Depth: 0 Right Of Way (ft): 0 Released By: Originally Released: 10/25/2010 By: tmelbourn Landuse/Zoning/HE Conditions Released By: Driveway/Approach Sewer Review Permits: Operator: JD Originally Released: 4/1/2011 By: mpalaniuk Released By: Originally Released: 4/1/2011 By: jdavis Printed By: jmm Released By: Print Date: 4/1/2011 Project Number: 10003493 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 4/1/2011 Page 2 of 3 Contractor: DIAMOND ROCK Address: 2602 N SULLIVAN SPOKANE VALLEY WA 99216 Description Tvpe Notes 1&2 FAMILY R-3 VB BASEMENT U R-3 VB COV DECK R-3 VB GAR WOOD U-1 VB Item Description RESIDENTIAL PERMIT FEE WSBCC SURCHARGE SF PLNS RVW < 7999 SQ FT Contractor: Address: Building Permit Firm: DIAMOND ROCK CONSTRUCTIO Phone: (509) 924-8964 This Application: Sa Ft Valuation 1,702 $168,412.90 1,702 $25,530.00 54 $810.00 783 $14,877.00 Totals: 4,241 $209,629.90 Units Unit Desc 1 SELECT 1 SELECT 1 SELECT Permit Total Fees: Mechanical Permit SPOKANE HEATING & COOLING PO BOX 28929 SPOKANE WA 99228 Item Description DUCT WORK SYSTEM GAS WATER HEATER GAS APPLIANCE<=100,000BTU GAS PIPING VENTILATING FANS 1 DUCT CLOTHES DRYER HOOD -TYPE II Total Project: Sq Ft Valuation 1,702 $168,412.90 1,702 $25,530.00 54 $810.00 783 $14,877.00 4,241 $209,629.90 Fee Amount $1,609.75 $4.50 $643.90 $2,258.15 Firm: SPOKANE HEATING & COOLING Phone: (208) 755-8345 Units Unit Desc 1 NUMBER OF 1 NUMBER OF 1 NUMBER OF 2 # OF UNITS 3 NUMBER OF 1 NUMBER OF 1 NUMBER OF Operator: JD Printed By: jmm Permit Total Fees: Print Date: Fee Amount $11.00 $11.00 $13.00 $2.00 $33.00 $10.00 $11.00 $91.00 4/1/2011 Project Number: 10003493 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 4/1/2011 Page 3 of 3 Contractor: GOLD SEAL MECHANICAL INC Address: 5524 E BOONE AVE SPOKANE, WA 99212 Item Description TOILETSBIDETS SINKS SHOWERS TUBS DISH WASHERS CLOTHES WASHER MISCELLANEOUS FIXTURES Notes: Payment Summary: , Permit Type Building Permit Mechanical Permit Plumbing Permit Plumbing Permit Firm: GOLD SEAL MECHANICAL INC Phone: (509) 535-5944 Units 2 5 1 2 1 1 2 Fee Amount $2,258.15 $91.00 $84.00 $2,433.15 Unit Desc NUMBER OF NUMBER OF NUMBER OF NUMBER OF NUMBER OF NUMBER OF NUMBER OF Permit Total Fees: Invoice Amount $2,258.15 $91.00 $84.00 $2,433.15 Fee Amount $12.00 $30.00 $6.00 $12.00 $6.00 $6.00 $12.00 $84.00 Amount Paid $628.22 $0.00 $0.00 $628.22 Amount Owing $1,629.93 $91.00 $84.00 $1,804.93 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: JD Printed By: jmm Print Date: 4/1/2011 Spokane .0... Valley Permit Center 11707 E Sprague Ave, Suite 106 Spokane Valley, WA 99206 (509)688-0036 FAX: (509)688-0037 Community Development wWw.spokanevalley.org.com Residential Construction Permit Application r New Construction ❑ Addition/Remodel ❑ Other: ❑ Accessory Bldg o Deck SITE ADDRESS 31 Zo S. intr. 4 y 401 . ASSESSORS PARCEL NO: LEGAL DESCRIPTION: Lot 3 grtderora £AST %Tait" ex ' . yr t sal ,, ° Name: Qiarvtorui 2ibe terns f. Address: IMPERVIOUS SURFACE AREA: FINISHED BASEMENT SQ. FTG: '� City: DECK/?e V. P TIQ SQ. FTG: 5'r - _ Zip: Phone: Fax: HEAT SOURCE: Nr i -v l (,as F.rwAce Name: ret, Phone: z (%C—K9 Z. Describe the scope of work in detail: td a Att./ S ( Con.. ,.a Name: p m wt„,,„/ i coinst. Address: 246z AL 5,I//va.i Fd City: Spbkcaitt silty Zip: tjA. Phone: QZei — ' G ei Fax: 9z4-1.0 9c/ Lic No: Exp. Date: City Business Lic No: Cost of Project: $ 70,000 **************The following MUST be complete: (write N/A if not applicable)********************** HEIGHT TO PEAK:Z 3 t DIMENSIONS: �X �OI 52 # OF STORIES: TOTAL HABITABLE SPACE* 33 'f 347o MAIN FLOOR TO SQ. FTG: 2Nu FLOOR SQ. FTG: UNFIN BASEMENT SQ. FTG: IMPERVIOUS SURFACE AREA: FINISHED BASEMENT SQ. FTG: '� GARAGE SQ. FTG: -7 S. 3 Via_ DECK/?e V. P TIQ SQ. FTG: 5'r - _ 30% SLOPES ON PROPERTY: Nl Ar SEWER OR SEPTIC? 5 -ewe,/ # OF BEDROOMS: 3 ....._. - ---- CONSTRUCTION TYPE: t.,anod Fr v% i HEAT SOURCE: Nr i -v l (,as F.rwAce The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before this application can be processed. Signature (/tAAL Date Method of Payment: (Faxed permit applications will only be accepted with major bankcard) 0 Cash ❑ Check ❑ Mastercard 0 VISA Bankcard #: Expires: VIN#: lo— zi -w ❑ Other Authorized Signature: REVISED 8125/2005 Spokane's°'' i�Ualley Community Development Permit Center 11707 E Sprague Ave, Suite 106 Spokane Valley, WA 99206 (509)688-0036 FAX: (509)688-0037 www.spokanevalley.ora.com Mechanical Permit Application o Commercial XResidential SITE ADDRESS 3 8Zo S. /14.tre I L✓ - Building owner Name: C .w..v+,A Rehr K eitu S t Phone: q q- set tea ci Fax Address: City State Zip Contractor ,-.:, Name: Spake.. t �•C`+rv*, Phone: Fax: Address: f City State Zip License No: City Business License No: .(°'/�1 t ,� n M rDY i oatxp�`"'� ��. , �r-,�� �yy'iyyy ' ., .... ; .. � _ „F , .' , . �� �' .., L. ,�i:4 �.^ ...� _ Name: vA(Phone: 21 p -q 9 Zy DESCRIPTION OF WORK # OF UNITS X COST = TOTAL AMOUNT 1 FUEL BURNING APPLIANCE Equal to or less than 100,000 _ I X $12.00 = 1 Z. 2 FUEL BURNING APPLIANCE More than 100,000 X $15.00 = 3 UNLISTED APPLIANCE (Additional Fee) Equal to or less than 400,000 X $50.00 = 4 UNLISTED APPLIANCE (Additional Fee) More than 400,000 X $100.00 = 5 USED APPLIANCE (WSEC min. AFUE rating) Equal to or less than 400,000 X $50.00 = 6 USED APPLIANCE (WSEC min. AFUE rating) More than 400,000 X $100.00 = 7 BOILER/REFRIGERATION 1 - 100M BTU X $12.00 = 8 BOILER/REFRIGERATION 101 - 500M BTU X $20.00 = 9 BOILER/REFRIGERATION 501 - 1,000M BTU X $25.00 = 10 BOILER/REFRIGERATION 1,001 - 1,750M BTU X $35.00 = 11 BOILER/REFRIGERATION More than 1,750M BTU X $60.00 = 12 GAS LOG, GAS INSERT, GAS FIREPLACE X $10.00 = 13 RANGE X $10.00 = 14 DRYER 1 X $10.00 = 10 15 FUEL BURNING WATER HEATER 1 X $10.00 = 10 16 MISC. FUEL BURNING APPLIANCE X $10.00 = 17 GAS PIPING (each outlet) Z- X $1.00 = Z. 18 DUCT SYSTEMS 1 X $10.00 = / 0 19 VENTILATING FANS 3 X $10.00 = 30 20 AIR HANDLER (DOES NOT include ducting) Equal to or less than 10,000 CFM X $12.00 = 21 AIR HANDLER (DOES NOT include ducting) Greater than 10,000 CFM X $15.00 = 22 EVAPORATIVE COOLERS X $10.00 = 23 TYPE I HOOD X $50.00 = 24 TYPE II HOOD 1 X $10.00 = /D 25 HEAT PUMP/AIR CONDITIONER 0-3 TON X $12.00 = 26 AIR CONDITIONER 3-15 TON X $20.00 = 27 AIR CONDITIONER 15-30 TON X $25.00 = 28 AIR CONDITIONER 30-50 TON X $35.00 = 29 AIR CONDITIONER More than 50 TON X $60.00 = 30 LPG STORAGE TANK X $10.00 = 31 WOOD OR PELLET STOVE/INSERT X $10.00 = 32 WOOD STOVE - FREE STANDING X $25.00 = 33 REPAIR & ADDITIONS X $15.00 = 34 VENTILATION SYSTEMS X $12.00 = 35 VENTILATION MECHANICAL EXHAUST_ X $12.00 = 36 INCINERATOR - RESIDENCE X $19.00 = 37 INCINERATOR - COMMERCIAL X $22.00 = METHOD OF PAYMENT: ❑CASH 0 CHECK 0 VISA 0 MC CARD #: SUBTOTAL 7K DATE: PROCESSING FEE $35.00 EXPIRES. TOTAL PERMIT FEE DUE: AUTHORIZED SIGNATURE: REVISED 8/26/05 Permit Center 2:>C1ley 11707 E Sprague Ave, Suite 106 Spokane Valley, WA 99206 (509)688-0036 FAX: (509)688-0037 Community Development ww•w.spokanevallcy.orL.com Plumbing Permit Application o Commercial j Residential SITE ADDRESS 31 10 S, AkerCy LA • Building owner Name: Orkwner.A C. Address: Phone: iv{ — I ci City Fax State Zip Contractor . Name: Geb t cJ Stat AleC I . Address: Phone: Fax: City State Zip License No: City Business License No: act;.4 Name: 1:7I2 A Phone: Zig 4?ZN AUTHORIZED SIGNATURE: REVISED 8/26/05 DESCRIPTION OF WORK # OF UNITS X COST = TOTAL AMOUNT 1 TOILETS WATER CLOSET, BIDETS Z X $6.00 = % Z. 2 URINALS X $6.00 = 3 TUBS Z X $6.00 = 11- Z4 4 SHOWERS (PER TRAP) BATH, STALL, ON-SITE BUILT L X $6.00 = 4 5 SINKS LAVS/BASINS, BAR, FLOOR, KITCHEN, LAUNDRY, UTILITY, JANITOR, PHOTO, X-RAY, FOOD, PREP/CULINARY MEAT 5 X $6.00 = 3 v 6 DISHWASHER 1 X $6.00 = G 7 CLOTHES WASHER 1 X $6.00 =CIP 8 GARBAGE DISPOSAL X $6.00 = 9 WATER SOFTENER X $6.00 10 ELECTRIC HOT WATER TANK NOTE: IF GAS, SEE MECHANICAL X $6.00 = 11 FLOOR DRAINS AREA, CASE, COIL, TRENCH, CONDENSATE X $6.00 = 12 ROOF DRAINS/OVERFLOW DRAINS X $6.00 = 13 FOUNTAINS, DRINKING X $6.00 = 14 WATER PIPING/DRAIN-IN WASTE, VENT, PLUMBING, REVERSAL NSTALLATION, ALTERATION, REPAIR, REVERSALS X $6.00 = 15 SEWAGE EJECTOR GRINDER, SUMP PUMP X $6.00 = 16 WATER USING DEVICE ICE AN/OR COFFEE MAKER, HOSE BIB, STEAMER PROOFER, CARBONATOR, SWAMP COOLER Z. X $6.00 = I 2. 17 CROSS CONNECTION DEVICE VACUUM BREAKER, CHECK VALVE, AND R.P.B.P.D. FOR: VATS, TANKS, BOILERS X $6.00 = 18 INTERCEPTORS GREASE TRAP, SAND TRAP, CHEMICAL HOLDING TANK X $6.00 = 19 MEDICAL GAS (per outlet) NITROUS, OXYGEN X $6.00 20 MISCELLANEOUS PLUMBING FIXTURE X $6.00 = 21 PRIVATE SEWAGE DISPOSAUSYS X $20.00 = 22 INDUSTRIAL WASTE INTERCEPTOR X $15.00 = METHOD OF PAYMENT: 0 CASH 0 CHECK DATE: SUBTOTAL -! 8 u 0 VISA 0 MASTERCARD PROCESSING FEE $35.00 EXPIRES: TOTAL PERMIT FEE DUE: AUTHORIZED SIGNATURE: REVISED 8/26/05 SPOKE COUI\trY SPOKANE COUNTY DEPARTMENT OF BUILDING & PLANNING 1026 WEST BROADWAY AVENUE ' SPOKANE, WA 99260-0050 Site Information Project Information Site Address: 3820 S MERCY CT Parcel Number: 45321.9004 Subdivision: RANGE Block: Lot: Zoning: UNK Unknown Owner: DIAMOND ROCK CONSTRUCTION Address: 15321 E MISSION AVE VERADALE, WA 99037 - Building Inspector: None Water Dist: Project Number: 10005900 Inv: 1 Issue Date: 10/25/2010 Permit Use: SEWER CONNECTION Applicant: DIAMOND ROCK CONSTRUCTION 15321 E MISSION AVE VERADALE, WA 99037- Phone: (509) 924-8964 Contact: DIAMOND ROCK CONSTRUCTION 15321 E MISSION AVE VERADALE, WA 99037- Phone: (509) 924-8964 Setbacks - Front: Group Name: Project Name: Left: • Right: Rear: Permits Sewer Connection Permit Contractor: PRECISION GRADING License #: PRECIGL971NJ PROCESSING FEE 1 $15.00 S1 SEWER CONNECTION 1 $125.00 Total Permit Fee: $140.00 **FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. **CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. **INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. **SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. **THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Payment Summary Total Fees AmountPaid AmountOwing $140.00 $140.00 $0.00 Tran Date 10/25/2010 Receipt # 4774 Payment Amt $140.00 Notes / Conditions of Approval FELTS FIELD AIRPORT OVERLAY ZONE FIRE DISTRICT #1 - PLAN REVIEW FEE IS REQUIRED FOR ALL SITE PLAN REVIEWS CONDUCTED BY FD #1. Processed By: DOMPIER, DAWN Printed By: Leinley, Linda Page 1 of 1 PERMIT )1- ki ti 41 1 UL VY 0 V0 . 1 VI VV-EgkEVaipatigtgg;a&'tor0.togfaaakoiOtgWS',4r.aOr4t000)OAaroVig.'r;aeliF)iK,t(V'oiiiiaiiiiitiF.=Ri-,i)ii.ioY;.iot,::gii, i/ /1 .•' 382e? 1,4Aerpi 3 eovtakere.k. &Ls+ PLANNING DEPT. APPROVED DATE: lahoif onl eos ...................... • • • • • • • • • • • • • •,-• ." • • • • • 1 . a 4,4• . k. N ..ettee0081) •-*/ °_0° cerogt4N 4," Spokane jUalley For City Use Only PLUS Project Number Project Address 11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206 509.688.0036 • Fax: 509.688.0037 • permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. cri Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review > Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. > Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. > Call staff regarding the status of your project only after the targeYdate shown at the top of the page. Although you should be contacted on or by thetarget date, ple feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE -APPLICANT PINK - BUILDING FILE REV 9/07