Loading...
2010, 02-26 Permit App: 10000526 RemodelProject Number: 10000526 Inv: / Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 2/26/2010 Page 1 of 2 Project Information: Permit Use: ADD 3 WALLS TO COMPLETE ROOM IN Contact: MAURO, FRANK BASEMENT Address: 524 S MCKEE ST C - S - Z: SPOKANE VALLEY, WA 99216 Setbacks: Front Left: Right: Rear: Phone: (509) 869-9285 Group Name: Site Information: Project Name: Plat Key: Name: Range District: East Parcel Number: 55191.2905 Block: SiteAddress: 524 S MCKEE ST Location:: CSV Lot: Owner: Name: MAURO, FRANK Address: 524 S MCKEE ST SPOKANE VALLEY, WA 99216 Zoning: R-3 SF Res District Water District: 134 CONSOLIDATED ID #19 Hold: ❑ Area: 6,882 Sq Ft Width: 0 Nbr of Bldgs: 0 Nbr of Dwellings: 0 Review Information: Depth: 0 Right Of Way (ft): 0 Review Building Plan Review Permits: Released By: Originally Released: 2/26/2010 By: tmelbourn Contractor: OWNER Building Permit Firm: OWNER Phone: (000) 000-0000 This Application: Total Project: Description Grp Luc Notes So Ft Valuation Sq Ft Valuation BASEMENT F R-3 VB BASEMENT 260 $5,200.00 260 $5,200.00 FINISH Item Description RESIDENTIAL PERMIT FEE WSBCC SURCHARGE SF PLNS RVW <7999 SQ FT Totals: 260 55,200.00 260 $5,200.00 Units Unit Desc Fee Amount 1 SELECT $125.25 1 SELECT $4.50 1 SELECT $50.10 Operator: jmm Printed By: jmm Permit Total Fees: $179.85 Print Date: 2/26/2010 Project Number: 10000526 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 2/26/2010 Page 2 of 2 Notes: Payment Summary: Permit Type Building Permit Fee Amount Invoice Amount $179.85 $179.85 $179.85 $179.85 Amount Paid $27.70 Amount Owing $152.15 $27.70 $152.15 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: jmm Printed By: jmm Print Date: 2/26/2010 Permit Center Scm ar 11703E Sprague Ave pokane S okane-Vallk w -�06 • Valle « t5o99ick a ...M 8.00 w'ww.s D' ilre T Community Development CS`t �' Cl Residential Cotistructi 26c Permit Applic ttie,w# I tyyne 1 SITE ADDRESS: Sub PERMIT NUMBER: ! t%kp PERMIT FEE: New Construction Li Accessory Bldg Addition/Remodel Deck Other: ac'L k'l%{ SPD1444,e_ 13f.etkt 91 o (P ASSESSORS PARCEL NO: LEGAL DESCRIPTION: _ : t _ C .. _ __ . �y. Y:1 BUlldmg Owner:' �.,F"� r ; °' ..: , _ ; : "k." s. `_'S ��� ... Y.6'.�� (Conti -26'014 A: ,(..Ar .,nr^_.: Y9�E<i; __� �`_� _ _ _ n C. i m__ ;j. syla . ar;�-_3' ;1 a.'F:.'; .... r: -,:'� z t ' _* ''s3 ;--� =�=:-.2 i�-A'. <4.«iITIF Name: �2A'A4L /t'4a4o DZ Name: Address: 5.2.)/ s . ilit (4t‹.._ Address: City: �o lcN It , State: (AM.. Zip: lib) (f City: State: Zip: Phoney t) y,y 7z �5I Fax: ll Phone: Fax: DECK/COV. PATIO SQ. FTG: ic/lA- Contractor Lic No: Exp Date: COLtBCt PCrSdn+„-iiki;,'i; y,- t c-a;°� `.p','�`.;`'•-0-� CONSTRUCTION TYPE: City Business Lic. No: SEWER OR SEPTIC? Name: {a -k_ {Ltq.,,s,W Phone: (Sr) er47— `7Z P5 Describe the scope of work in detail: Cost of Project: $ g0nNt; 3 t bAls tcwlplck (5— Proposed Use: -771). **************The following MUST be complete: (write N/A if not applicable)********************** HEIGHT T PEAK: /re/ DIMENSIONS: /(i # OF STORIES: ( TOTAL HABITABLE SPACE: a(t100 5-€7 /PT MAIN FLOOR TO SQ. FTG: /2.oO 2"D FLOOR SQ. FTG: 4 UNFIN BASEMENT SQ. FTG: /ZOD IMPERVIOUS SURFACE AREA: / FINISHED BASEMENT„ /31 SQ. FTG: 4 4^ ARAGE SQ.TG: >63/4' DECK/COV. PATIO SQ. FTG: ic/lA- 30% SLOPES ON PROPERTY: A3/44t" # OF BEDROOMS: CONSTRUCTION TYPE: HEAT SOURCE: ,441 SEWER OR SEPTIC? The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, l• - •nces. i Plans or additional information may be required to be submitted, and subsequently approved before this application can be process SIGNATURE: 7 - Method ofPaymen 0 Cash Bankcard #: Authorized Signature: REVISED 2/15/07 ❑ Check ❑ Mastercard Expires: DATE: ,-/- e_/ao/ o ❑ VISA VIN#: RESIDENTIAL CHECK LIST DIRECTIONS:..., Place a check mark in box next to each document required for completes submittal. o SITE PLAN '::f. o Property lines and dimensions .0 Setbacks to properly lines o Direction arrow pointing North and orientation to streets .. o Distance between buildings o Proposed/existing buildings (footprint and dimensions) o Right of way/easement location & sizes o Utilities, septic tank/drain field locations and distances o Driveway approach size and location BUILDING PLANS (3 SETS) (minimum 1/8 inch scale or completely dimensioned) o Elevations (Front/Rear/Sides) with roof peak and wall height including basement: o Foundation Plan (crawlspace, basement or slab on grade): o Footing sizes and locations o Perimeter concrete foundation wall sizes o Crawlspace ventilation o Supporting wood cripple walls or beams o Thickened concrete pads supporting, beams or girder trusses ❑ Floor Plan of each level (finished or unfinished) with dimensions: o Floor Joist direction size and spacing o Window and door location-and•,sizes o Header, beam or concrete lintel sizes o Brace wall panel locations o Water heater and furnace locations o Exhaust fan locations o Deck or concrete patio sizes and locations ❑ Roof Plan: o Engineered truss direction and spacing o Rafter and over frame direction, size and spacing ❑ Wall Section Detail including: Roof o Slope/ roofing material/ underlayment/ ice dam protection o Sheathing size and type Ceiling o Joist size and spacing Wall o Height/ top plate/ stud size and spacing/ sole plate o Exterior sheathing size and type Floor o Joist size and spacing Foundation Wall o Concrete or Masonry unit width o Earth to wood separation distance Footing o Size Radon o Passive system with 6mil vapor barrier Miscellaneous Construction Details ❑ Deck: o Floor plan/ side view/ dimensions o Floor Joist/ decking direction, size and spacing ❑ Stairway tread rise & run and nosing o Window well locations if applicable O Room usage labels o Smoke detector locations o Attic and crawl space access locations o Fire Wall construction o Ridge, eave and valley lines o Beam and girder size and location o Truss or rafter size, spacing & connection o Attic insulation/ air space baffle/ ventilation o Size of ceiling gypsum wall board o Siding/ exterior house wrap/ anchor bolts o Insulation, vapor barrier, gypsum wall board o Sheathing or concrete floor size/ insulation o Footing bottom to finished ground level depth o Horizontal & vertical reinforcement if any ❑ Reinforcement if any o Active system with 6 mil vapor barrier o Footings/ post/ and beam size and locations O Handrail / Guard height & spacing CiTY J Spokane Valley valley tan ,,,.?...• a.tz., Pins. Nt„r p r }V f< • For City Use Qnl _ . PLUS'Project•Number / (J Project Address: .'4-,7W S / /%e,t 2.Q - 11703E Sprague Ave Suite B-3 • Spokane, Valley WA 99206 • 509.688.0036• Fax: 509.688;0037.♦ permitcenter@spokanevalley.org• As part. of .our on-going commitment•, to customer service during=.the reyiew,process .of your, project application, we are providing you' with a TARGET DATE. for the initial -technical` application review. If for any reason we cannot meet this date, we will contact you with a revised.target date. ,. , Your application review TARGET:DATE is The TARGET DATE is the date we:estimate your project application, will have 'had its initial technical review: if is not the dateTor'a}ipt-oval or permit issuance. Tips fora Smoother Project Application Review i_ Submit complete, aectirate.plahs-and docutnents; Ex t,•a, time than be required for re -submittals as project'applic'alion rei•ieu'et's nun- be several dais before they can.look.at your nen or revisec(infnrnicilion.;' ' 1 Designate a specific contact person to communicate with the City. trk-o I multiple dpplications and its While the pet}son designated air the applicant',s contact person ,with the City can'be changed,. one individual 111th the expertise for dealing wlth,revie{ver comments iwould be the hest c•holee for the entit•e re View process.- ' ' Call staff regarding the status of your project Only after the' target. date shown at the top'of the p • age ` y , , Although you should be contacted on or 'by the target date, please feel free to comacl ns 1/1011 haven •t heard Iron/ us bin -our tai -ger dale. Staff may contact yoi/ before the target date if the iintial 1evieiv.is contplete..Bv folloiring this procedure. von will save nme and alloir the i t vie,iwers to complete the work mare expeditioush, Steps in the Permit Process • 1. Counter Complete. Your application ;has 'been: accepted, as counter complete. Thus „means all •of:the; requited documents, as indicated on your Pre' Application Checklist have been 'submitted, or "have, 'been 'approved for deferred submittal. This does not prevent technical staff froth requesting additional information as a' result of their technical review: • • 2, Quality Check. The nest step, in the process isa quality check to make sure that the' application' is reviewable and free from substantive flaws that•would prevent technical' staff from completing the technical review once -it is -.started: When this step is complete,:your application will be'routed to.the, appropriate staff and remain in thcirreview queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is, routed to technical staff for compliance review. Depending on the 'type of project, technical staff may'include multiple 'review"ers. You' should be contacted by phone, fax, email, or mailby your TARGET DATE once the initial technical compliance review is complete. '• • 4. Permit issuance.. When the technical. compliance"review of the: application is complete,' including• any. subsequent re - submittals, each reviewer will•approve their section of the application and route•it to the Permit Center. When all sections . of the application are received, a Permit Specialist will process the application and contact the person specified•'on your application for permit pick, up. Information regarding' fees. and pre -construction meetings (if required) will be; provided by, the Permit Specialist at that time. WHITE — APPLICANT PINK—BUILDING FILE REV 9/07