Loading...
2012, 11-16 Permit: SW-12002555 SewerSPOKANE COUNTY BUILDING AND PLANNING PERMIT Application Number: SW -12002555 Permit Issued Date: 11/16/2012 Expiration Date: Project Description Project Name: Permit Type: SEWER CONNECTION CARNAHAN SEWER Primary Contact: HANKS, KRISTINA L Applicant: HANKS, KRISTINA L Address: Phone: Email: 421 S MCKINNON RD SPOKANE VALLEY, WA 99212 SITE INFORMATION: Site Address: Parcel Number: Subdivision: Assessor's Description: Inspection Area: 421 S MCKINNON RD 35231.1437 CAROLINE ADDITION CAROLINE L3 B5 Owner: HANKS, KRISTINA L Address: 421 S MCKINNON RD SPOKANE VALLEY, WA 99212 Phone: Email: Water District: Carnhope Fire District: Spokane Valley Fire Irrigation District #7 Zoning: Land Area: 43290 Square Feet CONTRACTOR INFORMATION: General Contractor OVERLEI951 LE OVERLAND EXCAVATION INC 5918 E TRENT AVE SPOKANE, WA 99212 509-939-7984 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION FEE DETAIL: Processing - Utilities Utilities Permit 1 8125.00 $125.00 Total Fee: $125.00 $25.94 $125.00 $150.94 CONDITIONS: Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire. Inside Public Transit Benefit Area CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. Date Printed- 11/16/2012 10'05:04 Printed by IIS APPPOOL\SmartGovProdApp SPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW -12002555 11/16/2012 Expiration Date: FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8.30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 11/16/2012 10:05:04 Printed by: 118 APPPOOL\SmartGovProdApp