Loading...
2012, 11-01 Permit: SW-12002476 SewerSPOKANE COUNTY BUILDING AND PLANNING PERMIT Application Number: SW -12002476 Permit Issued Date: 11/01/2012 Expiration Date: Project Description. Project Name: Permit Type: MAIN/MANHOLE TAP/CUT-IN CARNAHAN SEWER EXTENSION SEWER Primary Contact. ELLER CORPORATION Applicant: Address Phone: Email: ELLER CORPORATION PO BOX 117 NEWMAN LAKE, WA 99025 509-226-0333 SITE INFORMATION: Site Address: Parcel Number Subdivision: Assessor's Description. Inspection Area' Zoning: 601 S MCKINNON ST 35231.1475 CAROLINE ADDITION CAROLINE ADD LT 6 BLK 5 Owner: Address. Phone: Email: BERGLAND, MICHAEL 601 S MCKINNON RD SPOKANE VALLEY, WA 99212 Water District' Carnhope Fire District: Spokane Valley Fire Irrigation District #7 Land Area: 37260 Square Feet CONTRACTOR INFORMATION: General Contractor ELLERC*242C3 ELLER CORPORATION PO BOX 117 NEWMAN LAKE, WA 99025 509-226-0333 DETAILS' Class Type Quantity Unit Charge Value SEWER MAIN/MANHOLE TAP/CUT-IN FEE DETAIL Processing - Utilities Utilities Permit 1 $125.00 $125 00 Total Fee: $125.00 $25.94 $125.00 $150.94 CONDITIONS: Inside Public Transit Benefit Area Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire. CALL 1-800-424-5555 BEFORE YOU DIG—AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. Date Printed: 11/01/2012 11:11 34 Printed by IIS APPPOOL\ASP.NET v4.0 SPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW -12002476 11/01/2012 Expiration Date: FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. INSTALLER 15 RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 11/01/2012 11:11:34 Printed by: IIS APPPOOLWSP.NET v4.0