2012, 11-01 Permit: SW-12002476 SewerSPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Application Number: SW -12002476
Permit Issued Date:
11/01/2012
Expiration Date:
Project Description.
Project Name:
Permit Type:
MAIN/MANHOLE TAP/CUT-IN
CARNAHAN SEWER EXTENSION
SEWER
Primary Contact. ELLER CORPORATION
Applicant:
Address
Phone:
Email:
ELLER CORPORATION
PO BOX 117
NEWMAN LAKE, WA 99025
509-226-0333
SITE INFORMATION:
Site Address:
Parcel Number
Subdivision:
Assessor's Description.
Inspection Area'
Zoning:
601 S MCKINNON ST
35231.1475
CAROLINE ADDITION
CAROLINE ADD LT 6 BLK 5
Owner:
Address.
Phone:
Email:
BERGLAND, MICHAEL
601 S MCKINNON RD
SPOKANE VALLEY, WA 99212
Water District' Carnhope Fire District: Spokane Valley Fire
Irrigation District #7
Land Area: 37260 Square Feet
CONTRACTOR INFORMATION:
General Contractor
ELLERC*242C3
ELLER CORPORATION
PO BOX 117
NEWMAN LAKE, WA 99025
509-226-0333
DETAILS'
Class
Type
Quantity Unit Charge
Value
SEWER MAIN/MANHOLE TAP/CUT-IN
FEE DETAIL
Processing - Utilities
Utilities Permit
1
$125.00
$125 00
Total Fee:
$125.00
$25.94
$125.00
$150.94
CONDITIONS:
Inside Public Transit Benefit Area
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
CALL 1-800-424-5555 BEFORE YOU DIG—AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
Date Printed: 11/01/2012 11:11 34
Printed by IIS APPPOOL\ASP.NET v4.0
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW -12002476 11/01/2012
Expiration Date:
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
INSTALLER 15 RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 11/01/2012 11:11:34
Printed by: IIS APPPOOLWSP.NET v4.0