2012, 09-12 Permit: SW-12002183 SewerSPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Application Number: SW -12002183
Permit Issued Date:
09/12/2012
Expiration Date:
Project Description SEWER CONNECTION Primary Contact
Applicant:
Permit Type: SEWER Address -
Phone:
Email:
BERGLAND, MICHAEL
BERGLAND, MICHAEL
601 S MCKINNON RD
SPOKANE VALLEY, WA 99212
SITE INFORMATION:
Site Address.
Parcel Number.
601 S MCKINNON ST
35231.1475
Subdivision' CAROLINE ADDITION
Assessors Description. CAROLINE ADD LT 6 BLK 5
Inspection Area'
Owner BERGLAND, MICHAEL
Address' 601 S MCKINNON RD
SPOKANE VALLEY, WA 99212
Phone:
Email:
Water District: Carnhope Fire District: Spokane Valley Fire
Irrigation District #7
Zoning: Land Area: 37260 Square Feet
CONTRACTOR INFORMATION:
Owner Acting As Builder
OWNER
OWNER PERFORMING THE WORK
SAME AS SITE ADDRESS
SAME, WA 00000
DETAILS:
Class
Type
Quantity Unit Charge Value
SEWER SEWER CONNECTION 1 $125.00 S125.00
FEE DETAIL:
Processing - Utilities
Utilities Permit
Total Fee:
$125.00
$25.94
$125.00
$150.94
CONDITIONS:
Inside Public Transit Benefit Area
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
CALL 1-800-424-5555 BEFORE YOU DIG—AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
Date Printed. 09/12/2012 12'09:34
Printed by 115 APPPOOL\ASP.NET v4 0
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW -12002183 09/12/2012
Expiration Date:
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8.30-5.00 MONDAY -FRIDAY PRIOR TO COVER
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed. 09/12/2012 12:09:34
Printed by: IIS APPPOOLWSP NET v4.0