Loading...
2011, 09-22 Permit App: 11002972 Pole BldgProject Number: 11002972 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Information: r Permit Use: 22x52x10 POLE STRUCTURE - MOBILE HOME Contact: DAVE BRANT Address: 625 S MCKINNON C - S - Z: SPOKANE VALLEY, WA 99212 Setbacks: Front Left: Right: Rear: Phone: (509) 710-8586 Group Name: Site Information: Project Name: Date: 9/22/2011 Page 1 of 2 COVER Plat Key: 000325 Name: CAROLINE ADD District: Nort Parcel Number: 35231.1429 Block: SiteAddress: 625 S MCKINNON RD Location:: CSV Zoning: R-3 Water District: 003 Area: 21,390 Sq Nbr of Bldgs: 1 SF Res District CARNHOPE Ft Width: 0 Nbr of Dwellings: 1 Lot: Owner: Name: HARRIS, RICHARD & KELLI Address: 4304 W BROAD AVE SPOKANE, WA 99205-6170 Hold: ❑ Depth: 0 Right Of Way (ft): 0 Review Information: Review Building Plan Review Released By: Originally Released: Landuse/Zoning/HE Conditions 9/22/2011 By: tmelbourn Released By: Originally Released: 9/20/2011 By: tschmidt Permits: Operator: MBB Printed By: JD Print Date: 9/22/2011 Project Number: 77002972 Inv: / Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 9/22/2011 Contractor: OWNER Total Area 1144 Building Height 13 Building Permit Page 2 of 2 Firm: OWNER Phone: (000) 000-0000 Building Characteristics Description Grp Type Notes POLE BDLG U-1 VB Item Description RESIDENTIAL PERMIT FEE ACCESSORY PLANS REVIEW WSBCC SURCHARGE This Application: Sq Ft Valuation 1,142 $21,698.00 Totals: 1,142 $21,698.00 Units Unit Desc SELECT SELECT SELECT Permit Total Fees: Total Project: Sri Ft Valuation 1,142 $21,698.00 1,142 $21,698.00 Fee Amount $349.25 $87.31 $4.50 $441.06 Notes • Current property owner owns a number of legal vehicles on site. Property is currently in compliance. Payment Summary: , Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Building Permit $441.06 $441.06 $87.31 $353.75 $441.06 $441.06 $87.31 $353.75 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: MBB Printed By: JD Print Date: 9/22/2011 Spokane 1#Valley° Community Development Department Permit Center 11703 East Sprague Avenue, Suite B-3 Spokane Valley, WA 99206 Tel: (509) 688-0036 Fax: (509) 688-0037 permitcenter@spokaneva tlev. orq (Staff Use Only)) 7 PERMIT NUMBER: 11 -Z57 [_ PERMIT FEE: RESIDENTIAL CONSTRUCTION PERMIT APPLICATION NEW CONSTRUCTION 0 ADDITION/REMODEL Ci ACCESSORY BUILDING [] DECK 0 OTHER r SITE ADDRESS , //C N/JhL' --Ce/Cia ASSESSORS PARCEL NO.: 35Z31. 19 Z9 LEGAL DESCRIPTION: BUILDING OWNER NAME: NAME: ADDRESS: ACURIRIS— Z(05- p7cervUrovit) Ave'l (/t° CITY: 6P 4.„krp JOS /J (.L r STATE: ll�¢ PHONE: — 7 1" 3 FAX: CELL: ZIP: CONTACT NAME: `J A Jiro PHONE: " ^ 7/v g5—S6 CONTRACTOR NAME: FAX: CELL: MAILING ADDRESS: 1131N30 1INH3rI . lie Z 0 3 d38 • A311VA 3NV>IOdS &L13 rr : 'AH CITY: STATE: ZIP:• PHONE: FAX: CELL: CONTRACTOR LICENSE No.: - EXPIRES: CITY BUSINESS LICENSE NO.: DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE & PROPOSED USE: Ftr CITY OF SPOKANE VALLEY ****YOU MUST COMPLETE THE FOLLOWING**** MARK N/A IF NOT APPLICABLE SEP 2 0 2011 Height to Peak:73 /3 Dimensions: 1r /I //fir No. of Stories: / rota rk iSfldbS N 1 LH BIBPBce: in Le--_, Main Floor SQ FT: tic ral.;')(--c;.2r Upper Floor SQSQFT)--) %l,/� Vo -,co L ,CD Unfinished Basement SQ FT: Finished Basement SQ FT: Garage SQ FT: Derek/ overed Patio SQ ` F`(T: // 42- Impervious Surface Area: 30% Slopes on Property: No. of Bedrooms: Construction Type: Heat Source: Sewer or Septic: TOTAL COST OF PROJECT: $ 79to c>"' DISCLAIMER The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is far construction or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley permit Inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction Is to be done In full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Pians or additional Information may be re,i red to be sub itted and subsequently approved before this application can be processed. Signature Date: 9 -do- // Updated 1-11-11 Page 1 of 1 http://www.spokanevalley.org/filestorage/124/938/210/948/1496/Building_Permit_ _Residential_11-11-11.doc • Spollane Valley- • Target Date sheet For City Use Only PLUS Project //—zg77 Project Address GZ' S. l�C� nhor 11703 E Sprague Ave Suite 8-3 1 Spokane Valley WA 99206 509.720-5240 ♦ Fax: 509.688.0037 1 permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. if for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is 9 -23 -II The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review > Submit complete, accurate plans and documents. Extra time ntay he required for re -.submittals as project application reviewers work on midi:plc applications and it may be several days before they can look at your new or revised information ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can he changed, one individual with the es -pee -Else for dealing wtth reviewer continents would be the hest choice for the entire review process. > Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard front us by your target date. Staff may contact you beJbre the target date if the initial review is complete. By Plowing this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substanti'e flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time CD -003 V-7/ 06-21-11 Page 1 of 1 Community Development Department 40 Permit Center 11703 East Sprague Avenue, Suite B-3 SCITi'OF Spokane Valley, WA 99206 pokane Tel: (509) 688-0036 Valley Fax: (509) 688-0037 x permitcenter©spokanevallev.orq (Staff Use Only) PERMIT NUMBER: / —2 7 C_ PERMIT FEE: RESIDENTIAL CONSTRUCTION PERMIT APPLICATION ❑ NEW CONSTRUCTION ❑ ADDITION/REMODEL ❑ DECK ❑ OTHE z SITE ADDRESS , /77c-,Jit)d0) ASSESSORS PARCEL NO.: 3Sz31. ) L zcj LEGAL DESCRIPTION: ❑ ACCESSORY BUILDING BUILDING OWNER NAME: NAME: ADDRESS: " , P/C/e011N'vN CITY: rL-41-1—1 (it// ZIP: PHONE: ? ^� , 7q�3 "SAX: CELL: CONTACT NAME: (ThAJtc) PHONE: - 40 (J532. - CONTRACTOR NAME: FAX: CELL: 1:11:13.1N30N3AH UOZ0.3d3S MAILING ADDRESS: CITY: STATE: A31]VA 3NV)1OdS JO A113 ZIP: PHONE: FAX: CELL: CONTRACTOR LICENSE No.: EXPIRES: CITY BUSINESS LICENSE NO.: DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE & PROPOSED USE: CITY OF SPOKANE VALLEY ****YOU MUST COMPLETE THE FOLLOWING**** MARK N/A IF NOT APPLICABLE SEP 202011 Height to Peak:t 3 Dimensions:, a2 V A- 2 2 /(-) ( Upper Floor SQ FT(y••'f'� 6 / f4 ,i `,,� No. of Stories: / Unfinished Basement SQ FT: Totar bl{d N 1 Lk Btpace: i 1 L —k Main Floor SQ FT: 14iU Finished Basement SQ FT: Garage SQ FT: Deck/Covered Patio SQ ` FT: Impervious Surface Area: 30% Slopes on Property: No. of Bedrooms: Construction Type: Heat Source: Sewer or Septic: TOTAL COST OF PROJECT: $ DISCLAIMER The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory Is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done In fu I compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Pe -mit Center. 5) The City of Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional Information may be recd red to be subrpitted and subsequently approved before this application can be processed. Date: Signature Updated 1-11-11 Page 1 of 1 http://www.spokanevalley.org/filestorage/124/938/210/948/1496/Building_Permit_-_Residential_11-11-11.doc RESIDENTIAL CHIIIIK LIST DIRECTIONS: Place a check mark in box next to each document required for complete submittal. o SITE PLAN o Property lines and dimensions o Direction arrow pointing North and orientation to streets o Proposed/existing buildings (footprint and dimensions) o Utilities, septic tank/drain field locations and distances o Setbacks to property lines o Distance between buildings o Right of way/easement location & sizes ❑ Driveway approach size and location BUILDING PLANS (3 SETS) (minimum 1/8 inch scale or completely dimensioned) O Elevations (Front/Rear/Sides) with roof peak and wall height including basement: ❑ Foundation Plan (crawlspace, basement or slab on grade): o Footing sizes and locations o Perimeter concrete foundation wall sizes o Crawlspace ventilation o Supporting wood cripple walls or beams o Thickened concrete pads supporting beams or girder trusses O Floor Plan of each level (finished or unfinished) with dimensions: o Floor Joist direction, size and spacing o Header, beam or concrete lintel sizes o Brace wall panel locations o Water heater and furnace locations o Exhaust fan locations no Deck br concrete patio sizes and locations • 0 Roof Plan:' o Engineered truss direction and spacing o Rafter and over frame direction, size and spacing ❑ Wall Section Detail including: Roof o Slope/ roofing material/ underlayment/ ice dam protection o Sheathing size and type Ceiling:.:, ; ) o Joist size and spacing Wall d' o Height/ top plate/ stud size and spacing/ sole plate o Exterior sheathing size and type Floor o Joist size and spacing Foundation Wall o Concrete or Masonry unit width o Earth to wood separation distance Footing o Size Radon o Passive system with 6mil vapor barrier Miscellaneous Construction Details o Deck: o Floor plan/ side view/ dimensions o Floor Joist/ decking direction, size and spacing o Stairway tread rise & run and nosing o Window and door location and sizes o Window well locations if applicable o Room usage labels o Smoke detector locations o Attic and crawl space access locations o Fire Wall construction ❑ Ridge, eave and valley lines o Beam and girder size and location ❑ Truss or rafter size, spacing & connection o Attic insulation/ air space baffle/ ventilation o Size of ceiling gypsum wall board o Siding/ exterior house wrap/ anchor bolts o Insulation, vapor barrier, gypsum wall board o Sheathing or concrete floor size/ insulation o Footing bottom to finished ground level depth o Horizontal & vertical reinforcement if any o Reinforcement if any o Active system with 6 mil vapor barrier o Footings/ post/ and beam size and locations O Handrail / Guard height & spacing �Pa PLANNING DEPT. APPROVED BY: DATE: q/.2‹:/i/ 4)!D1L • s ofe_p_5EL 020'x 2 40.8;4, J/a �dve� , e F CITY OF SPOKANE VALLEY SEP 202011 HERMIT CENT th BY: -7