Loading...
2006, 09-06 Permit: 06003547 Demo Bldg�'pokan� Va11ey BUILDING DIVISION 11707 E. Sprague Avenue, Suite 106 Spokane Valley, WA 99206 1 1 Site Information Project Information Site Address: 625 S MCKINNON RD Parcel Number: 35231.1429 Subdivision: Block: Lot: Zoning: UR -3 Urban Residential 3 5 Owner: HARRIS, RICI IARD & KELLI Address: 4304 W BROAD AVE SPOKANE, WA 99205-6170 Building Inspector: DOUG POWELL Water Dist: CARNHOPE Project Number: 06003547 Permit Use: DEMO BUILDING Inv: 1 Issue Date: 09/06/2006 Applicant: ROB'S Demolition 3810 E BOONE AVE, #203 SPOKANE WA 99202 Phone: (509) 534-2970 Contact: ROB'S Demolition 3810 E BOONE AVE, 4203 SPOKANE WA 99202 Phone: (509) 534-2970 Setbacks - Front: Left: Right: Rear: Group Name: Project Name: NOTICE OF INTENT #06 Permits Demolition Perini! Contractor: ROB'S DEMOLITION License #: ROBSDDI97ORR DEMOLITION - RESIDENTIAL 1 $44 00 Total Permit Fee: $44.00 Payment Summary Total Fees AmountPaid AmountOwing $44.00 $44.00 $0.00 Tran Date Receipt # Payment Amt 09/06/2006 Processed By: Main, Jodi L Printed By: Main, Jodi L Page 1 of 1 6807 $44.00 PERMIT NOTICE The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the applicant/permittee that the use described on the front of this permit complies with applicable codes and that required inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before progressing beyond the point where inspections are required may necessitate removal of certain parts of the construction at the applicant's/permittee's or property owners expense. At a minimum, the following inspections ARE REQUIRED by City Code: FOOTING - when forms and reinforcement are in place and prior to placement of concrete -all structures, including manufactured homes. NOTE: This inspection includes review of the structure's setback from property lines. Minimum setbacks are established by City of Spokane Valley Ordinance. Curb lines and fence lines are not necessarily indicative of property lines. The responsibility to comply with applicable setback provisions lies solely with the permittee -neither the City of Spokane Valley nor its authorized representatives assume any responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure. Failure to properly locate the structure may require its relocation at the owner's/permittee's expense FOUNDATION - when forms and reinforcement are in place and prior to placement of concrete. PLUMBING - after rough -in, before covering, and final. MECHANICAL - rough -in of piping, before covering, metal chimneys before concealment, and final. FRAMING - after all framing, bracing and blocking is in place, rough electrical, plumbing and mechanical systems are complete, and prior to concealing. FINAL - when complete and prior to occupancy and/or use. All permits require final inspection. NOTE' In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site plan) required by ordinance or as a condition of approval of this permit. Items such as the installation of fire hydrants. fire department access, on-site drainage ('208' swales). road Improvements, parking and landscaping are common requirements of a permit/site plan which must be completed prior to final approval of a building or issuance of a Certificate of Occupancy. MANUFACTURED HOMES - Final Inspection required when complete, stairs, handrails, skirting, etc. installed, and prior to occupancy; completed inspection record card must be available on site. PLUMBING REVERSALS FOR SEWER CONNECTIONS - prior to cover. RIGHT-OF-WAY/APPROACH - prior to placement of concrete/asphalt or. If gravel approach, after completion. In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing. drywall, concrete, etc must be inspected prior to cover. Check with the Building department for "special inspections" in conjunction with commercial projects FOR INSPECTIONS Please give one working day/24 hour notice. Different parts of your project may require permits and inspections from more than one agency. Building, plumbing (includes interior reversals for sewer) and mechanical, City of Spokane Valley Building Division 688-0054 Road cuts for utilities or driveways, City of Spokane Valley Public Works 688-0195 or State Dept of Transportation 324-6000 Permits and inspections for eiectncat wrong. State Department or Labor Permits and inspections for Sewer Connection, Spokane County Utilities Division And Industries 324-2640 477.3604 Permits and inspections for on-site septic systems. Spokane Regional Fire spnnkier and alarm systems and pnvate access road inspections. Spokane Valley Health Distnct 324-1560 Fire Department 892-4122 Slate law RCW 19 122 requires that poor to any excavation the 'CALL BEFORE YOU DIG- center must be notified. Call before you dig al least 2 working days in advance, 456-8000 PERMIT EXPIRATION AND REFUNDS All permits shall expire by limitation and be declared void if a) work is not started within 180 days of obtaining a permit, or b) work is abandoned for 180 days or more after beginning work, or c) after two years from the date of permit issuance, regardless of whether the work is finished. If a permit is expired for time, a new permit may be obtained for half the permit fee based on the value of the remainder of the work to finish the original permit. All refund requests must be made in writing by the original permittee to the Building Official no later than 180 days after the date of fee payment. 100% refunds will be granted for any fee erroneously paid or collected. Refunds of not more than 80% of a permit fee may be authorized when no work has been done under the permit issued Refunds of not more than 80% of a plan review fee paid may be authorized when an application is withdrawn or cancelled prior to the plan review being completed. Owner / Agent Date Staff Approval Date Sep 05 2006 4:39PM -=Boiler.?d F.'.;. 11-21-06 14:11 ••6 FROM-SCAPCA Rob's Demolition IPFa:w;.fl Stir 50/4TT6/2/ 509-534-9404 1-421 P.01/01 F-050 p.2 - Proleea 3. 0 Animist= Aemotral 1 .. ., . .. a' DasnaB : i .--.._, -_.,._ _, , 1. Property {�� Owner- �iG1nG2d T-M¢tls pbpae,las- 3002 of available) Pato Peopyary Owner a MafilII& Addreae: 11304 V4, Bgc tkD Ade- Cin:"-”oi7Aeaa stauL4.lA ziperi ZOS Sim Address): (O2S SrMG1elrna fel City: s ^S Stdol.J04 Zib: ?a . Respmeible its en Cnmatt Pal Nos ectGOcd_ Job no 993- i7 ly P _ 1. *abatis Sunq or 1 eypsrformod. Weilisbattell found/ Yea U 014o Mach Survey ffite SurveyUNo. of Saucaucs: Cool ed: 1011 JO6 (toe 'mob if >11) J 1] Maeerbl l4eaumad AJ1ERA Building r� lot OMAN N CVSS NEJ era : 11aE�, Caeli»itaber a ea rR -O i7Aimbe". !� S-o(e 1 j Dare: l21 lin. - t. Aabesu»?reject l No. er9bueeaio: 1 1 Start �DatcaanGo •Hours: tnfernadep: 1 (aaebock if> Wk. flow Su M t n/Th F St ou - to bottmnvod: I (m. Sq.. ill all asbestos metered be *YeS ;mewed by orate Game ? o WOl work schedule 14 Yee mom. 6o mod? -alga 1 PCL Lint mdUviduel typo quantity ofmataiold 50 t'=Rq�. V NaGAS be removed or prevfdo an anoci near of MOO: I tai tnT..4 ic(6r: asci p tf4tj O.' S l tt.. y Abdomwt Cmrtraesvi: Vie -k104141. 44Co ttt5 Medias�L • Address: 1-1101-1W . 440- F. DereoOtihn Isf raadan: No. of Struntum : (setbackif> I) 1 Phone 32$ -WI Far sotd.iJ/4 1 zip: 7247 CilyiSt O' Sour; 940 D Tnining Fire (List Fire Dept as demo comodm below) fOrdal Demdhienr� ,tom _ COarnc cc aces VR rat 111 ol�l o Oidaes Demolition ( gm o Phew: 53y-�,� Fan: 5 1`� Cler St tol•.ak Anddress: ng Bt•t2Q ir LA1nod.%c Wiwi -a. Pmt. pate VC G. AsbvmaIDtmab.n PrWad Cat FW: i Notification Dom Oils eroj.a involve 1 5 sReal�a menneag7M 0 N0 WOW' Period 1. 01 ()v M cup M Rnle�dal Demander' eos J c O 4yde tm• eolNimr Project Prig Noris. 2. U AU Other D®tolitiana Wits Ne Aa - ., fiemen t�° '� jO Dave �, 10 - 219 iever fie or 411 - 159 aoualp Fed (••• ma of form Inept coo ] Days 4 260 99P 1 Ora re leo- 4999 memo fed 10 Days 5, > 1,000 Linear fader > J.009 W.Wt fel fL ��QQJJJ,J},, li a A.beams Roieei err a EmaenetCY Q�ali ' a Frei= 7. A���mp�Mama of Compliaaea Or Friable Mstalgb or 0 Damollfien S. U Mama= Meana of Campliancolosidooftlable Asbestos MatIs 10 Days 9. lia Eaaeptioe for kta Wednea Cwaditionr Cmalrrens wit Praiect • Tho Iwo romemi.a in OJ apply only w owoehocapic4 aieale.6aity nuida, oil, which maw may nos-aaad$ie am building oaaminlae bring epics alae is unnoo17 eoaspSd (prior lo Yid seta romtadeeldca.Mllon) Lie' ane }eyl4y WIIO .wee dee plapeeq' N melt domietia ws of CM easegoriet in 0.2.9 nwn be Woe► Ger a0 mead rcapcimldsuolldaa oralsaa Pee mars Iefaamnlee. Cannan SCAPCA Y (PM 4774727, IL OpdoasZ; echo a.GiQOWyarsaa yon woatd 1*0 .oplaa ofmia P101 moths Macao modes ane ballot name & tet atmbea aad/oe nadir, aware.* d.A mesa_ Q easo vied A -S tb&s nag. 10 Ds a -11j 04 Non-Rcflmdabk Poises Fs. 530 5250 2250 $100 51,250 flier Nonce 10 Deya Twice Praia Fee Twice Project Pee Twice Wei art Fee Regulv)teiea Fee l eat fy that the intennerian =wined in thio naditca an sad any sto planuatal dew provided is, to the best of my kleD94011811, seemata and complete. #?..aLic. nine°Iait•.s-.1 Rerrwrta+en ata hi,41i70.9.1,72 tour advance ratification peeled wt7P begin whim a sitglrS)40L bcladkii.pgrmed ibes, b received by SCAPCA. t copy of dee asbastoa mercy, Completed notiGcafiut dk 00 onaulinan0 moor be aysiabla tr Spook= n all time n the jab she. NOl ova RF.RivE0 0e -Yl -G5 12:52 SEP 05 2006 17:05 3VaI-509 134 gala - i0-SCAYCA PAGE 01 509 534 9404 PAGE.02