Loading...
1991, 10-04 Permit: 91000907 InspectIT:t.DESS: S 1117 A1C4 DARK PRJJECT NUMBEF: 91000907 PEP1IT 1YPES: PL PE;MIT uSri: INSTALL WATER SOF7UP )ESCIP7ION INSPE:TOR FIN.. ERICKSON, ART DATE RESJLT 1)/04/91 APPROVED DEPARTMENT OF BUILDINGS JAMES L. MANSON, C.B.O., DIRECTOR September 26, 1991 Mr. Ted Sindlinger South 1117 Mica Park Drive Spokane, Washington 99206 • A DIVISION OF THE PUBLIC WORKS DEPARTMENT DENNIS M. SCOTT. P.E., DIRECTOR RE: Expiration of Permit Number - 91000907 South 1117 Mica Park Drive Dear Mr. Sindlinger: \D\ \c\i' Our records indicate that no inspection of your water softener located at the above -referenced address Spokane County parcel number 20543-1821, has been conducted by this office. It should be noted that (Section 303(d) of the Uniform Building code requires that if the work authorized under the above permit is suspended or abandoned at any time after the work is commenced for a period of 180 days, then the permit shall become null and void. If, in fact, the work authorized under the above reverenced permit has not been suspended, please contact this office within ten (10) days of the date of this letter and arrange for inspection in order that your permit might remain valid. If the work authorized has been suspended or should you fail to contact this office within the above referenced time frame to arrange for an inspection, your permit will be considered null and void without further notice from this office, and a new permit will be required prior to the commencement/continuation of any work on the project. Should you have any questions, please feel free to contact me between the hours of 8:00 a.m. and 4:00., weekdays. Sincerely, )(/-)19 Jeffrey E. Forry Senior Building Technician JEF:ts CODE ENFORCEMENT DIVISION WEST 1303 BROADWAY • SPOKANE, WASHINGTON 99260-0550 • (509) 456-3675 FAX (509) 456-4703