1991, 10-04 Permit: 91000907 InspectIT:t.DESS: S 1117 A1C4 DARK
PRJJECT NUMBEF: 91000907 PEP1IT 1YPES: PL
PE;MIT uSri: INSTALL WATER SOF7UP
)ESCIP7ION
INSPE:TOR
FIN.. ERICKSON, ART
DATE RESJLT
1)/04/91 APPROVED
DEPARTMENT OF BUILDINGS
JAMES L. MANSON, C.B.O., DIRECTOR
September 26, 1991
Mr. Ted Sindlinger
South 1117 Mica Park Drive
Spokane, Washington 99206
•
A DIVISION OF THE PUBLIC WORKS DEPARTMENT
DENNIS M. SCOTT. P.E., DIRECTOR
RE: Expiration of Permit Number - 91000907
South 1117 Mica Park Drive
Dear Mr. Sindlinger:
\D\
\c\i'
Our records indicate that no inspection of your water softener located
at the above -referenced address Spokane County parcel number
20543-1821, has been conducted by this office.
It should be noted that (Section 303(d) of the Uniform Building code
requires that if the work authorized under the above permit is
suspended or abandoned at any time after the work is commenced for a
period of 180 days, then the permit shall become null and void. If,
in fact, the work authorized under the above reverenced permit has
not been suspended, please contact this office within ten (10) days
of the date of this letter and arrange for inspection in order that
your permit might remain valid.
If the work authorized has been suspended or should you fail to
contact this office within the above referenced time frame to arrange
for an inspection, your permit will be considered null and void
without further notice from this office, and a new permit will be
required prior to the commencement/continuation of any work on the
project.
Should you have any questions, please feel free to contact me between
the hours of 8:00 a.m. and 4:00., weekdays.
Sincerely,
)(/-)19
Jeffrey E. Forry
Senior Building Technician
JEF:ts
CODE ENFORCEMENT DIVISION
WEST 1303 BROADWAY • SPOKANE, WASHINGTON 99260-0550 • (509) 456-3675
FAX (509) 456-4703