2012, 04-23 Permit: SW-12001179 SewerSPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Application Number: SW -12001179
Permit Issued Date:
04/23/2012
Expiration Date:
Project Description:
Permit Type:
SEWER CONNECTION
SEWER
Primary Contact: LISH EXCAVATION
Applicant: LISH EXCAVATION
Address: 703 E. 33RD AVE.
SPOKANE, WA 99203
Phone: 509-216-0549
Email:
SITE INFORMATION:
Site Address:
Parcel Number:
Subdivision:
Assessor's Description:
Inspection Area:
Zoning:
1215 S MICA PARK DR
45203.1818
MICA PARK ADDITION
MICA PARK ADD L18 B2
Owner:
Address:
Phone:
Email:
BUSH, BRANDON V & JULIE L
1215 S MICA PARK DR
SPOKANE, WA 99206
Water District: Spokane Fire District: Fire District 1
County Water District #3
Land Area: 0.3478 acres / 15150.3 sgft
CONTRACTOR INFORMATION:
General Contractor
LISHEEC936O5
LISH EXCAVATION CO
703 E 33RD AVENUE
SPOKANE, WA 99203
509-838-2400
DETAILS:
Class
Type
Quantity Unit Charge Value
SEWER SEWER CONNECTION
FEE DETAIL:
Processing - Utilities
Utilities Permit
1 $125.00 $125.00
Total Fee:
$125.00
$25.94
$125.00
$150.94
CONDITIONS:
Inside Public Transit Benefit Area
Possible Stream On Site
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
Printed by: IIS APPPOOL\ASP.NET v4.0
Date Printed: 04/23/2012 09:59:18
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW -12001179 04/23/2012
Expiration Date:
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 04/23/2012 09:59:18
Printed by: IIS APPPOOL\ASP.NET v4.0