Loading...
2010, 09-23 Permit: 10002812 Storage BldgSpokank� jValley® PERMIT CENTER 11703 E. Sprague Avenue, Suite 13-3 Spokane Valley, WA 99206 1 Site Information Project Information Site Address: 8405 E MISSION AVE Parcel Number: 45074.9060 Subdivision: Block: Lot: Zoning: R-3 SF Res District Owner: GOULD, JESSE JAMES Address: 8405 E MISSION AVE SPOKANE VALLEY WA 99212 Building Inspector: NORTH Water Dist: SPO CO WATER DIST#I Project Number: 10002812 Inv: I Issue Date: 09/23/2010 Permit Use: NEW 26 X 36 X 12 STORAGE BUILDING Applicant: SPOKANE POST FRAME 7001 E 2ND SPOKANE, WA 99212 Contact: SPOKANE POST FRAME 7001 E 2ND SPOKANE, WA 99212 Setbacks - Front: Left: Right: Group Name: Project Name: Phone: (509) 926-0865 Phone: (509) 926-0865 Rear: Permits Building Permit Contractor: SPOKANE POST FRAME License#: SPOKAPF998M0 • PLANREVIEW' U-1 VB • FEE • Total Valne: • FOR BUILDING INSPECTIONS CALL (509) 688-0054. 936 RESIDENTIAL PERMIT FEE ACCESSORY PLANS REVIEW WSBCC SURCHARGE. , . $17.784 00 $293.25 ' $73.31 ' Total Peimit Fee: • $371.06 • Payment Summary Total Fees AmountPaid AmountOwing $371.06 $371.06 $0.00 Tran Date 09/09/2010 09/23/2010 Receipt # 24181 24400 Payment Amt $73.31 $297 75 Notes / Conditions of Approval FOR STORAGE ONLY -NOT AS A GARAGE -PAVING WAIVED Processed By: Main, Jodi L Printed By: MORRIS, HEATHER Page 1 of 1 PERMIT NOTICE The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the applicant/permittee that the use described on the front of this permit complies with applicable codes and that required inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before progressing beyond the point where inspections are required may necessitate removal of certain parts of the construction at the applicant's/permittee's or property owner's expense. At a minimum, the following inspections ARE REQUIRED by City Code: FOOTING — when forms and reinforcement are in place and prior to placement of concrete -all structures, including manufactured homes. NOTE This inspection includes review of the structure's setback from property lines. Minimum setbacks are established by City of Spokane Valley Ordinance. Curb lines and fence lines are not necessarily indicative of property lines. The responsibility to comply with applicable setback provisions lies solely with the permittee -neither the City of Spokane Valley nor its authorized representatives assume any responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure. Failure to properly locate the structure may require its relocation at the owner's/permittee's expense. FOUNDATION — when forms and reinforcement are in place and prior to placement of concrete. PLUMBING — after rough -in, before covering, and final MECHANICAL — rough -in of piping, before covering, metal chimneys before concealment, and final. FRAMING — after all framing, bracing and blocking is in place, rough electrical, plumbing and mechanical systems are complete, and prior to concealing. FINAL — when complete and prior to occupancy and/or use. All permits require final inspection. NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site plan) required by ordinance or as a condition of approval of this perrnit. Items such as the installation of fire hydrants, fire department access, on-site drainage (208' swales), road improvements, parking and landscaping are common requirements of a perniVsite plan which must be completed pnor to final approval of a building or issuance of a Certificate of Occupancy. MANUFACTURED HOMES — Final inspection required when complete, stairs, handrails, skirting, etc. installed, and prior to occupancy; completed inspection record card must be available on site. PLUMBING REVERSALS FOR SEWER CONNECTIONS — prior to cover. RIGHT-OF-WAY/APPROACH — prior to placement of concrete/asphalt or, if gravel approach, after completion. In addition to the above. any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc. must be inspected prior to cover. Check with the Building department for "special inspections" in conjunction with commercial projects. FOR INSPECTIONS Please give one working day/24 hour notice. Different parts of your project may require pemtits and inspections from more than one agency. Building, plumbing (includes interior reversals for sewer) and mechanical, City of Spokane Valley Building Division 688-0054 Road cuts for utilities or driveways, City of Spokane Valley Public Works 688-0195 or State Dept of Transportation 324-6000 Permits and inspections for eiectncal wiring, State Department of Labor Permits and inspections for Sewer Gonnecbon, Spokane County Utilities DINYM And Industries 324-2610 477.3604 Permits and inspections for on-site sephc systems. Spokane Regional Fore spnnkief and alarm systems and pnvate access road lnspecbons, Spokane Valley Health D'stnct 324-1560 Fire Department 892-4122 Slate law RCW 19 122 requires that pnor Io any excavation the 'CALL BEFORE YOU DIG' center oust be notified. Call before you dig at least 2 working days in advance. 456-8000. PERMIT EXPIRATION AND REFUNDS All permits shall expire by limitation and be declared void if a) work is not started within 180 days of obtaining a permit, or b) work is abandoned for 180 days or more after beginning work, or c) after two years from the date of perrnit Issuance, regardless of whether the work is finished. If a permit is expired for time, a new permit may be obtained for half the permit fee based on the value of the remainder of the work to finish the original permit. All refund requests must be made in writing by the original permittee to the Building Official no later than 180 days after the date of fee payment. 100% refunds will be granted for any fee erroneously paid or collected. Refunds of not more than 80% of a permit fee may be authorized when no work has been done under the perrnit issued. Refunds of not more than 80% of a plan review fee paid may be authorized when an application is withdrawn or cancelled prior to the plan review being completed Owner / Agent '�'"�� `AS Date V2-3/ (� Staff Approval Date