2010, 09-09 Permit App: 10002812 Storage Bldg' Project Number: 10002812 Inv: 1
Application
Date: 9/9/2010 Page 1 of 2
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Project Information:
Permit Use: NEW 26 X 36 X 12 STORAGE BUILDING Contact: SPOKANE POST FRAME
Address: 7001 E 2ND
C - S - Z: SPOKANE, WA 99212
Setbacks: Front Left: Right: Rear: Phone: (509) 926-0865
Group Name:
Site Information: Project Name:
Plat Key: 000000 Name: Range
District: Nort
Parcel Number: 45074.9060 Block:
Lot:
SiteAddress: 8405 E MISSION AVE Owner: Name: GOULD, JESSE JAMES
Address: 8405 E MISSION AVE
Location:: CSV SPOKANE VALLEY, WA 99212
Zoning: R-3 SF Res District
Water District: 098 SPO CO WATER DIST#1 Hold: ❑
Area: .29 Acres Width: 0 Depth: 0 Right Of Way (ft): 0
Nbr of Bldgs: 0 Nbr of Dwellings: 0
Review Information:
Review
Building Plan Review
Released By:
Originally Released:
Landuse/Zoning/HE Conditions
9/9/2010 By: tmelbourn
Released By:
SEE CONDITION
Originally Released: 9/9/2010 By: mharnois
Permits: ,
Operator: jmm Printed By: jmm
Print Date: 9/9/2010
Project Number: 10002812 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 9/9/2010 Page 2 of 2
Building Permit
Contractor: SPOKANE POST FRAME Firm: SPOKANE POST FRAME
Address: 7001 E 2ND AVE Phone: (509) 926-0865
SPOKANE, WA 99212
This Application: Total Project:
Description Grp Tvoe Notes Sq Ft Valuation Su Ft Valuation
POLE BDLG U-1 VB PLAN 936 $17,784.00 936 $17,784.00
REVIEW
FEE
Item Description
RESIDENTIAL PERMIT FEE
ACCESSORY PLANS REVIEW
WSBCC SURCHARGE
Totals: 936 $17,784.00 936 $17,784.00
Units Unit Desc
1 SELECT
1 SELECT
1 SELECT
Fee Amount
$293.25
$73.31
$4.50
Permit Total Fees: $371.06
Notes: ,
FOR STORAGE ONLY -NOT AS A GARAGE -PAVING WAIVED
Payment Summary:
Permit Type Fee Amount Invoice Amount Amount Paid Amount Owine
Building Permit $371.06 $371.06 $73.31 $297.75
$371.06 $371.06
$73.31 $297.75
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: jmm Printed By: jmm
Print Date: 9/9/2010
Spokane
.valley
Community Development ' GSV PI -
Residential Construction SFY A 201
Permit Application, est #� ` - '
Permit Center
11703 E Sprague Ave, Suite B-3 IW
Spokane Valley, WA -992p;
(509)688 -0036 -FAX (509)688--0037
w, ww.spoka1nevatle4. g1 rFNTEP.vit
tProl
l •ao�rle
PERMIT NUMBER:
PERMIT FEE:
New Construction
Addition/Remodel
Other:
Accessory Bldg
Deck
SITE ADDRESS:
lire !1,1.5.5civ,1 4-4t- SGoiC4r Okr rWAZ
-.11ZL
ASSESSORS PARCEL NO M J b 2-t-1 - 1 fh% 0 LEGAL DESCRIPTION:
Building'Owner:
Contractor: " - ;
Name: j X55 CSD, , \ ,\
J "-"V
Name: 5 roic*t t Posr 1rwc =
Y OS
Address: Ago,— , VIki-SIA-t`I ,4
I
Address: TD ( `L- 2Y3— .4-r-,._
City: 0 ` State:
Sp ���-
Zip:
(pet�9Ztz
City 1 State: Zip:
SGuI�� Uma � � 9120z
Phone: G .}y _ s t_` tt Fax:
//
Phone: 9 26 -OIL- Fax: %Z`( —5---1‘
rd 1
DECK/COV. PATIO SQ. FTG:
_La—
Contractor Lic No: Exp Date:
Contact Person -
EgeoPERTY:
City Business Lic. No:
IZat.-PC
HEAT SOURCE
S' EWER O SEPTIC?
Name: or Ti RP
Phone: 97- —DX6r
Describe the scope of work in detail:
Cost of Project: $
000
Proposed Use:
„O RLI oto L
**************The following MUST be complete: (write N/A if not applicable)**********************
HEIGHT TO PEAK: 16, q%
DIMENSIONS:
?(1,2—
# OF STORIES: `
TOTAL HABI ABLE SPACE:
MAINTG:
FLOOR TO SQ.
FTG: 15444
2"u FLOOR SQ.
UNFIN BASEMENT SQ. FTG:
(
IMPERVIOUS SURFACE
AREA:
FINISHED BASEMENT�ARAGE
SQ. FTG:
SQ. FTG:
DECK/COV. PATIO SQ. FTG:
_La—
30% SLOPES ON
0
' 3c. ) 0
EgeoPERTY:
# OF BEDROOMS:
cONSTRUCTION TYPE:
Pot' 3i.01/LA 't
HEAT SOURCE
S' EWER O SEPTIC?
The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or
local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before
this application can be processed.
SIGNATURE:
Method of Payment:
0 Cash
Bankcard #:
Authorized Signature:
REVISED 2/15/07
DATE: ci(60,D
❑ Mastercard ❑ VISA
Expires: VIN#:
RESIDENTIAL CHECK LIST DIRECTIONS:
Place a check mark in box next to each document required for complete submittal.
o SITE PLAN
o Property lines and dimensions
o Direction arrow pointing North and orientation to streets
o Proposed/existing buildings (footprint and dimensions)
o Utilities, septic tank/drain field locations and distances
❑ Setbacks to property lines
o Distance between buildings
o Right of way/easement location & sizes
o Driveway approach size and location
BUILDING PLANS (3 SETS) (minimum 1/8 inch scale or completely dimensioned)
❑ Elevations (Front/Rear/Sides) with roof peak and wall height including basement:
❑ Foundation Plan (crawlspace, basement or slab on grade):
o Footing sizes and locations
o Perimeter concrete foundation wall sizes
o Crawlspace ventilation
o Supporting wood cripple walls or beams
o Thickened concrete pads supporting
beams or girder trusses
❑ Floor Plan of each level (finished or unfinished) with dimensions:
o Floor Joist direction, size and spacing o Window and door location and sizes
o Header, beam or concrete lintel sizes ❑ Window well locations if applicable
o Brace wall panel locations
o Water heater and furnace locations
o Exhaust fan locations
o Deck or concrete patio sizes and locations
❑ Roof Plan:
o Engineered truss direction and spacing
o Rafter and over frame direction, size and spacing
❑ Wall Section Detail including:
Roof
o Slope/ roofing material/ underlayment/ ice dam protection
o Sheathing size and type
Ceiling
o Joist size and spacing
Wall
o Height/ top plate/ stud size and spacing/ sole plate
o Exterior sheathing size and type
Floor
o Joist size and spacing
Foundation Wall
o Concrete or Masonry unit width
o Earth to wood separation distance
Footing
o Size
Radon
o Passive system with Emil vapor barrier
Miscellaneous Construction Details
❑ Deck:
o Floor plan/ side view/ dimensions
o Floor Joist/ decking direction, size and spacing
❑ Stairway tread rise & run and nosing
o Room usage labels
o Smoke detector locations
❑ Attic and crawl space access locations
o Fire Wall construction
o Ridge, eave and valley lines
o Beam and girder size and location
o Truss or rafter size, spacing & connection
o Attic insulation/ air space baffle/ ventilation
o Size of ceiling gypsum wall board
o Siding/ exterior house wrap/ anchor bolts
o Insulation, vapor barrier, gypsum wall board
o Sheathing or concrete floor size/ insulation
o Footing bottom to finished ground level depth
o Horizontal & vertical reinforcement if any
o Reinforcement if any
o Active system with 6 mil vapor barrier
o Footings/ post/ and beam size and locations
o Handrail / Guard height & spacing
SiiiikatieValley°
For City Usc,Onl
PLUS Project Number _� U Q6'
Project Address Cz:7, +-I U J Z IRA( S i 0
11703 E Sprague Ave Suite; B-3 • Spokane.Valley WA 99206
509.688.0036 t Fax: 509.688.0037 t petiitcenter®spokanevatley.org •
As part of our on-going commitment to customer service .during ;the review process of your .project
application, we are providing you.with a TARGET DATE for the initial technical' application review.' If for
any reason we cannot meet this date, we will contact you with a revised target.date:':•
Your application review TARGET DATE is
•
The .TARGET DATE. is the date we estimate, your project application ,will have had its' initial technical:
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
Submit complete, accurate plans and documents.
•
E.cn•o (line nun, be required /or re -.submittals as project -application revietvers•.wbrk lin.inuliiplesapplications;and it
may he several days before they can look at your nese or revised information.
i Designate a specific contact person to communicate with the City. . .
While the person designated as ihe'appliccui(•s contact persue with the City can;he changed, Dire individual svidr the
expertise/in dealmg'srith re%iesrer evinnients would be -the hest choice for the entire redieir process. •
•
Call staff regarding the status of your project only after the target date shown 'at ,the top of the page
Although you should be contacted on or by the target date. please lee! free /o contract cis if you haven't heard/nom us
by your target date. Stall may,contact you helore the target date if the initial review -is complete. By jbllowing this
procedure, you will save tithe undo/km? the reviewers lo complete the work more expeditiousll;. • -
• Steps in the Permit Process
1. Counter Complete. Your application has been. accepted is,-.countcr complete. This means all of the required
documents. as indicated on your Pre -Application Checklist have been submitted 'or• have been approved' for- deferred
submittal. This docs not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application IS reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will he routed to the appropriate staff and renutin,in their review. queue until it
comes up for review. •
3. Technical Compliance. Once an application is'admutistratively complete; it is'routed to technical staff for,compliance
review. Depending on the type of project. technical staff may include multiple reviewers. You should be'contacted by
phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete.' ' ,
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it -to the Permit Center: When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre -construction meetings (if required; will be provided by
the Permit Specialist at that time.
WHITE -APPLICANT PINK- BUILDING FILE REV 9/07
SPOKANE POST FRAME, INC.
Engineered Pole Buildings 01-04E • q
,bops
garages
storage buildings
• cabins
kits -cost plus
7001 E. 2nd Ave .
Spokane. WA 99212 -
ROLFE WILL
Sales Manager - Owner
509-926-0865 6 Fax 509-924-5161
ort -866-926-0865
Visit us at
www.spokanepostframe.com
Site Plan
(,north
Show streets/alley
Show septic/sewer/draInfleld
Show existing buildings
Show proposed building
Show setbacks - front, rear, sides.
Show lot slZe
ZONING CRITERIA — SPOKANE
ADDR$ , qLj t %Z i.St- 1`0 4 l}\,
SJPo 41J`A lf� � t W� .1112! z_
LEGAL DESCRIPTION
1060
PLANNING
DEP APPROVED
B�D
=sy
closer than 5' to property line - need firewall and parapet
)ut of r ear 30' and closer than 5' - need waiver from neighbor
-aril cover more than 503 of rear 25'
orner lol. - building must be 20' from property line
30. minimum setback from front property line
ess than 8' from residence - need firewall
laxlmum souare Iootage - In of IQt area (Must be less than 3.000 so. ft.)
' lay not subdivide lot so that building is more than 10% of residual lot area
u' 1
2,6 ')(36`--/2-i...
-�
1017177--
closer
2
closer than 5' to property line - need f lrewall
'0 from sept ic/draInt leld
ess than 6' from residence - need f lrewall
'HI1ER& SETBACKS ARE SHOWN BELOW, WILL NEED TO CHECK.CODE BOOK
4110 KNOW WHAT ZONING YOU -RE In TO BE SURE. MAXIMUM BUILDING SIZE
4L50 CHANGES WITH DIFFERENT ZONING.
iminimum side yard setback
minImum rear yard setback
1 llnlmum front and side street setback - 25' from.property line or 55' from
•
CSV PFERMIT CENTER
SEP P t2010
Pro ect r_LC -. _-.�Z — .