2015, 05-13 Permit: SW-15000449 SewerSPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW -15000449 Permit Issued Date: 05/13/2015
Expiration Date: 05/13/2016
Project Description: SEWER
Project Name: SHERWOOD FOREST / MICA PARK
Primary Contact: COURCHAINE EXCAVATION
Phone: 509-928-0846
Applicant: COURCHAINE EXCAVATION
Address: 19818 E SPRAGUE
GREENACRES, WA 99016
Phone: 509-928-0846
Email:
SITE INFORMATION:
Site Address:
Parcel Number:
1308 S MICA PARK DR
45203.1716
Assessor's Description: MICA PARK ADD L16 B1
Inspection Area: : (509)-477-3675
Owner: VITTORE, T J
Address: 1308 S MICA PARK DR
SPOKANE VALLEY, WA 99206-3122
Phone:
Email:
Water District: Spokane County Water Fire District: Spokane Valley Fire
District #3
Zoning: Land Area: 11405.5 Square Feet
CONTRACTOR INFORMATION:
COURCC*181R7, Exp. 10/18/2015
COURCHAINE EXCAVATION
19818 E SPRAGUE GREENACRES, WA 99016
509-928-0846
DETAILS:
Class Type Quantity Unit Charge Value
SEWER SEWER CONNECTION 1 $125.00 $125.00
FEE DETAIL:
Processing - Utilities
Utilities Permit
Total Fee:
$27.12
$125.00
$152.12
$125.00
CONDITIONS:
Public Transit Benefit Area
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
Inside Public Transit Benefit Area
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
SEWER PERMITS ARE VALID FOR ONE (1) YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES
DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT
ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES.
Date Printed: 05/13/2015 11:27:19 Project Coordinator: Susan Clark
SPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW -15000449
Permit Issued Date: 05/13/2015
Expiration Date: 05/13/2016
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 05/13/2015 11:27:19 Project Coordinator: Susan Clark