Loading...
1984, 11-26 Permit App: 00003249 Duplex* • 3'70 °" 1 BUILDING PERMIT APPLICATION WORKSHEET PLEASE PRINT AND COMPLETE ONLY THOSE PARTS OF THE FORM YOU UNDERSTAND (Please return this original and your building plans to the Department of Building and Safety) 1 Owner's Name (last) (first) (m) Department Use Only F%s. II b / /19-A'&1 Comm 2 Project Address (not Mailing Address) cr Road Name,Space Zip Q/o:3 E m;C,jle/ //s iq . 3 City muni D K 0r>� State (, � SubdivisionlPlat Name fl � ef')e/l,' /)411 /� /1-64 44 /, 6/) 4 Assese Parcel No. 42.5-41-4J 0436 Lot / I Block * * * DEPARTMENT USE ONLY * * * 5 Sic Code Zone Act. M Zone Project No. �0✓ 1 - 32_1 q 6 Dwell 0 No. of Buildings Sq. Ft./Acre Depth (OG t Frontage olg 7 Set Back -Front) (R)S-2 Rear Census Tract Module No. Initials m 1 16 Architect Firm Name /4-S // C /� /� -Z/Ole.fe Street Address Zip City State Phone ( ) P2Contact person �,v �1 20. 4 r Phone if different than above Contractor Firm Name L1°0 / R /14.J- Street Address � C 7/ 7 !", `n/&S ed Zip q 9a 0 (o CityState ---.P (ttq Phone (: ) qa- ,i21 -a 5 -9..,i - Contact Person r Se I10,p License No. i,fol/-',L, r 3,91.' Phone if different than above ( ) 8 Owner/Agent (if different than 01 above) Business Address 9 Zip City State Phone ( ) 12 Review Required Plan Check (Y/N) Other (Y/N) SEPA Exempt (Y/N) Date 15 Type Work Bldg 0 Fire ❑ MH 0 Demo A New 0 Add/Alter ❑ Replace 0 Move 0 Other 14 Describe Work 11/(23 ecr r2a c r, Ox) eke S-1-0 %LLt 10 Applicant Name 0)e/4/ i9-,) rest Address 7/ 7 A`AlPs .. 11 Zip q 9,� C (o City S pck State Li}4 "-Phone (6-z7) 9, e --,.s--12:=, Lender Street Address Zip City State Phone ( ) Contact Person Phone if different than above ( ) Additional Information m'- iiia UB = 1-1 I S .° PFcK- 3Z0, * * Application Type (Standard unless otherwise indicated) Fast Track Early Start DEPARTMENT APPROVALS This is not a Permit (Indicated approvals required in either "release" or "release with conditions" space prior to permit issuance.) Environmental Health ❑ Commercial; W. 1101 College ❑ New Construction; Room 200 ❑ Additional st(ruucture; 7 APPLICATION # "I )--r/ I Conditions/ Comments- �v rrr 2i°o, l/� ❑ Residential ❑ Bldg alteration/addition (1/i /4 i' Planning/Zoning: ❑ Commercial; ❑ Cert. of Exemption; ❑ Frontage; N. 721 Jefferson ❑ Setbacks; ❑ lot w/d; ❑ lot size; ❑ use/zone; ❑ CU, variance, zone change; shoreline; 0 fence; O Other Conditions/Comments• Engineers: 0 Commercial; ❑ Residential; ❑ Flood Plain; N. 811 Jefferson 0 drainage 0 new access/approach; ❑ fence; ❑ road improvements Conditions/Comments: --/I(.A — /A Utilities: N. 811 Jefferson Conditions/Comments• Other: Plan Exam Fire Prev. Conditions /Comments • Project Representative Telephone Agencies Performing Special Inspection: 1 1 Indicate above or attach conditions relative to final as built approval 2 Indicate above or attach reasons for hold Release Release w/cond 1 Hold 2 /iii i (1/i /4 i' Planning/Zoning: ❑ Commercial; ❑ Cert. of Exemption; ❑ Frontage; N. 721 Jefferson ❑ Setbacks; ❑ lot w/d; ❑ lot size; ❑ use/zone; ❑ CU, variance, zone change; shoreline; 0 fence; O Other Conditions/Comments• Engineers: 0 Commercial; ❑ Residential; ❑ Flood Plain; N. 811 Jefferson 0 drainage 0 new access/approach; ❑ fence; ❑ road improvements Conditions/Comments: --/I(.A — /A Utilities: N. 811 Jefferson Conditions/Comments• Other: Plan Exam Fire Prev. Conditions /Comments • Project Representative Telephone Agencies Performing Special Inspection: 1 1 Indicate above or attach conditions relative to final as built approval 2 Indicate above or attach reasons for hold i ,j7 1— /91 /-72' R PL, 7b;794,41./ I-4- % PL ew-;::%-_,-Lgy• 47. -4-e0/22te,:iejA_ Fros ,a7, 7 $/G /V/5 J 4/2.r/ ALrEe,NR-T-6' • Q .• ,2o • • ,,, • 1./o 7j? RePc. F T I 7 z, I Dire U' •••t 11 14 7 F, NiSg SFLo oA" n .35' AL T D Eur /-21x /G r Da /- CorJG j4 Wpfl 2. M 4 Ire. • r:e ?VC AAA"- 46" pile- nt-e. HT"? p'303L/ 512/Z3S 74_ e."71144t or A.11 81-K M / Cl/ /EbLa pp2/4�'�� ADD lT/a //44,_ / cry/EL / PL/tC Aicrfg « e 1 _ v G. t//5 'J' ,wi F'''c_.b�� __ - 1 t51) SPOKANE COUNTY COURTHOUSE Jim Manson, Director Department of Building and Safety N. 811 Jefferson Spokane, WA 99260 Dear Jim: PLANNING DEPARTMENT BROADWAY CENTRE BUILDING N 721 JEFFERSON STREET PHONE 456-2205 SPOKANE, WASHINGTON 99260 August 2, 1985 I've enclosed a copy of a building permit which was released several months ago. I bring this up in hopes that we can get together with our front counter people to improve the situation with the new building permit forms. Perhaps we can have a meeting with all people to be involved in the future in an attempt to reduce the mistakes which might be made in the future. We might want to discuss each Department's role and what is expected on the new permit forms at this time. You might get back to me and give me your thoughts. Sincerely, Wctelto Wallis D. Hubbard Planning Director WDH:ks 1i 2r.1"�,1�h�. �t'•s X111 E�•': August 7, 1985 Wally Hubbard, Director Planning Department N. 721 Jefferson Spokane, WA 99260 Spokane County Department of Building & Safety Re: Your August 2, 1985 Correspondence JAMES L. MANSON, DIRECTOR Dear Wally: I have read the above -referenced letter and reviewed the associated application and permit. Clearly the permit should not have been issued based on the information supplied on the application. This permit was issued in 1984, and since then we have developed a checklist and other procedures to be used by our building technicians in order to abrogate this kind of inconsistency in the future. In addition, and as you will recall, in April of this year I sent a memo to Utilities, Environmental Health and County Engineers making them aware of our efforts through the Permit Process Group to improve the "system". That memo solicited their participation in the group towards the end of improving the interrelationship of the various departments with building permit issuance. I have not received any objection to this effort and accordingly have instructed my staff to implement the recommendations as enumerated in the March 27, 1985 summary submitted by the evaluation team. Implementation of this group meeting format should serve to address problems such as those evidenced in the subject permit. The J & B case has accelerated concerns to insure accurate permit issuance and to that end I can assure you this department stands willing to do what it can to reduce county exposure to potential liability while at the same time enhancing economic development. Should you desire to discuss this further, please contact me. Sincerely, DEPARTMENT OF BUILDING AND SAFETY James L. Manson Director JLM/ddl