Loading...
2010, 10-20 Permit: 10003422 Residence*Wane Valley® Permit Center 11703 E Sprague Ave Suite B3 Spokane Valley WA 99206 509.720-5240 ♦ Fax: 509.688.0037 • email: permitcenter®spokanevalley.org Site Information Project Information 1 Site Address: 18113 E MICIIIELLI AVE Parcel Number: 55074.3906 Subdivision: Block: Lot: Zoning: R-4 SF Res Urban District Owner: PAKIBA II / BIG SKY HOMES & DE Address: 712 S MOEN ST GREENACRES, WA 99016 Building Inspector: EAST Water Dist: CONSOLIDATED ID #19 Project Number: 10003422 Inv: 1 Issue Date: 10/20/2010 Permit Use: SFR W/ATT GAR Applicant: MATTESON CONSTRUCTION PO BOX 1060 OTIS ORCHARDS WA 99027 Contact: MATTESON CONSTRUCTION PO BOX 1060 OTIS ORCHARDS WA 99027 Setbacks - Front: Group Name: Project Name: Left: Right: Phone: (509) 723-8873 Phone: (509) 723-8873 Rear: Permits Building Permit Contractor: MATTESON CONSTRUCTION LLC 1&2 FAMILY COV DECK GAR WOOD Total Value: FOR BUILDING INSPECTIONS CALL (509) 688-0054. R-3 R-3 U-1 VB VB VB License#: MATTECL991CB 1,572 RESIDENTIAL PERMIT FEE 88 WSBCC SURCHARGE 733 SF PLNS RVW < 7999 SQ FT $170,796.40 Mechanical Permit Contractor: MATTESON CONSTRUCTION LLC DUCT WORK SYSTEM GAS APPLIANCE<=100,000BT VENTILATING FANS 1 DUCT FOR MECHANICAL INSPECTIONS CALL (509) 688-0054. Total Permit Fee: License #: MATTECL991CB 1 $11.00 GAS WATER HEATER I $13.00 GAS PIPING 4 $44.00 Total Permit Fee: $1,391.35 $4.50 $556.54 $1,952.39 1 $11.00 2 $2.00 $81.00 Plumbing Permit Contractor: MATTESON CONSTRUCTION LLC TOILETS/BIDETS TUBS GARBAGE DISPOSAL, FOR PLUMBING INSPECTIONS CALL (509) 688-0054. Processed By: DAVIS. JENNA Printed By: MORRIS, HEATHER Page 1 of 2 2 2 1 License #: MATTECL991CB $12.00 $12.00 $6.00 SINKS DISH WASHERS CLOTHES WASHER REV SITE Total Permit Fee: 4 1 $24.00 $6.00 $6.00 $66.00 NOTICE The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the applicant/permitee that the use described on the front of this permit complies with applicable codes and that required inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before progressing beyond the point where inspections are required and may necessitate removal of certain parts of the construction are at the applicant's/permittee's or property owner's expense. At a minimum, the following inspections ARE REQUIRED by the Spokane Valley Municipal Code (SVMC): FOOTING - when forms and reinforcements are in place and prior to placement of concrete -all structures, including manufactured homes. NOTE: This inspection includes review of the structures setback from property lines. Minimum setbacks are established by SVMC. Curb lines and fence lines are not necessarily indicative of property lines. The responsibility to comply with applicable setback provisions lies solely with the permitee-neither the City of Spokane Valley nor its authorized representatives assume any responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure. Failure to properly locate the structure may require its relocation at the owner's/permittee's expense. FOUNDATION - when forms and reinforcement are in place and prior to placement of concrete. PLUMBING - after rough -in, before covering and final. MECHANICAL - rough -in of piping, before covering, metal chimneys before concealment and final. FRAMING - after all framing, bracing and blocking is in place, rough electrical, plumbing and mechanical systems are complete, and prior to concealing. FINAL - when complete and prior to occupancy and/or use; all permits require final inspection. NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site plan) required by ordinance or as a condition of approval of this permit. Items such as installation of fire hydrants, fire department access, on-site drainage ('208' swa/es), road improvements, parking and landscaping are common requirements of a permit/site plan which must be completed prior to final approval of a building or issuance of a Certificate of Occupancy. MANUFACTURED HOMES - final inspection required when complete, stairs, handrails, skirting, etc. installed and prior to occupancy; completed inspection record card must be available on site. PLUMBING REVERSALS FOR SEWER CONNECTIONS - prior to cover RIGHT-OF-WAY/APPROACH - prior to placement of concrete / asphalt or, if gravel approach, after completion. In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc., must be inspected prior to cover. Check with the Building department for special inspections in conjunction with commercial projects. State law RCW 19.122 requires that prior to any excavation the 'CALL BEFORE YOU DIG' center must be notified. Call 411 at least 3 working days in advance. PERMIT EXPIRATION AND REFUNDS Expirations: Building or other permits (regulated under SVMC Chapter 24) shall expire by limitation and be declared void if a) work is not started within 180 days of obtaining a permit, or b) work is abandoned for 180 days or more after beginning work, or c) after two years from the date of permit issuance, regardless of whether the work is finished. If a permit is expired for time, a new permit may be obtained for half the permit fee based on the value of the remainder of the work required to finish the original permit. Right-of-way permits (regulated under SVMC Chapter 22) issued between April 1, and September 30, are valid for 30 days after the date of issuance, with a one-time 30 -day extension available. Right-of-way permits issued between October 1, and March 31, shall be valid until the following April 30. Refunds: All refund requests must be made in writing by the original permitee to the Building Official no later than 180 days after the date of fee payment. Full refunds will be granted for any permit issued in error. Rate of refund shall be as set forth in the City of Spokane Valley Master Fee Schedule in effect at the time of permit application. A copy of this schedule is available at Permit Center and also available for reference on the city website at: http://www.spokanevalley.orq and search for "fees" Owner/Agent Date: Staff Approval Date: Payment Summary Spmbliane Permit Center 11703 E Sprague Ave Suite B3 Spokane Valley WA 99206 509.720-5240 ♦ Fax: 509.688.0037 ♦ email: permitcenter@spokanevaltey.org Site Information Project Information Site Address: 18113 E MICHIELLI AVE SPOKANE VALLEY, WA 99016 Parcel Number: 55074.3906 Project Number: 10003422 Inv: 1 Issue Date: 10/20/2010 Permit Use: SFR W/ATT GAR Permits Total Fees AmountPaid AmountOwing $2,099.39 $2.099.39 $0.00 Processed By: DAVIS, JENNA Printed By: MORRIS, HEATHER Tran Date Receipt # Payment Amt 10/18/2010 24742 $556.54 10/20/2010 24788 $1,542.85 Page 2 of 2 REV SITE NOTICE The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the applicant/permitee that the use described on the front of this permit complies with applicable codes and that required inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before progressing beyond the point where inspections are required and may necessitate removal of certain parts of the construction are at the applicant's/permittee's or property owner's expense. At a minimum, the following inspections ARE REQUIRED by the Spokane Valley Municipal Code (SVMC): FOOTING - when forms and reinforcements are in place and prior to placement of concrete -all structures, including manufactured homes. NOTE: This inspection includes review of the structures setback from property lines. Minimum setbacks are established by SVMC. Curb lines and fence lines are not necessarily indicative of property lines. The responsibility to comply with applicable setback provisions lies solely with the permitee-neither the City of Spokane Valley nor its authorized representatives assume any responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure. Failure to properly locate the structure may require its relocation at the owner's/permittee's expense. FOUNDATION - when forms and reinforcement are in place and prior to placement of concrete. PLUMBING - after rough -in, before covering and final. MECHANICAL - rough -in of piping, before covering, metal chimneys before concealment and final. FRAMING - after all framing, bracing and blocking is in place, rough electrical, plumbing and mechanical systems are complete, and prior to concealing. FINAL - when complete and prior to occupancy and/or use; all permits require final inspection. NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site plan) required by ordinance or as a condition of approval of this permit. Items such as installation of fire hydrants, fire department access, on-site drainage (208' swales), road improvements, parking and landscaping are common requirements of a permit/site plan which must be completed prior to final approval of a building or issuance of a Certificate of Occupancy. MANUFACTURED HOMES - final inspection required when complete, stairs, handrails, skirting, etc. installed and prior to occupancy; completed inspection record card must be available on site. PLUMBING REVERSALS FOR SEWER CONNECTIONS - prior to cover RIGHT-OF-WAY/APPROACH - prior to placement of concrete / asphalt or, if gravel approach, after completion. In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc., must be inspected prior to cover. Check with the Building department for special inspections in conjunction with commercial projects. State law RCW 19.122 requires that prior to any excavation the 'CALL BEFORE YOU DIG' center must be notified. Call 411 at least 3 working days in advance. PERMIT EXPIRATION AND REFUNDS Expirations: Building or other permits (regulated under SVMC Chapter 24) shall expire by limitation and be declared void if a) work is not started within 180 days of obtaining a permit, or b) work is abandoned for 180 days or more after beginning work, or c) after two years from the date of permit issuance, regardless of whether the work is finished. If a permit is expired for time, a new permit may be obtained for half the permit fee based on the value of the remainder of the work required to finish the original permit. Right-of-way permits (regulated under SVMC Chapter 22) issued between April 1, and September 30, are valid for 30 days after the date of issuance, with a one-time 30 -day extension available. Right-of-way permits issued between October 1, and March 31, shall be valid until the following April 30. Refunds: All refund requests must be made in writing by the original permitee to the Building Official no later than 180 days after the date of fee payment. Full refunds will be granted for any permit issued in error. Rate of refund shall be as set forth in the City of Spokane Valley Master Fee Sch- . . - ' -ff V at the time of permit application. A copy of this schedule is available at Permit Center and also available for reference, • n the city - >ite at: http://www.spokanevallev.orq and search for "fees" Owner/Agent Staff Approval Date: Spokane� jUalley° PERMIT CENTER 11703 E. Sprague Avenue, Suite B-3 Spokane Valley, WA 99206 1 Site Information Project Information 1 Site Address: 18113 E MICHIELLI AVE Parcel Number: 55074.3906 Subdivision: Block: Lot: Zoning: R-4 SF Res Urban District Owner: PAKIBA LLC Address: 712 S MOEN ST GREENACRES, WA 99016 Building Inspector: EAST Water Dist: CONSOLIDATED ID #19 Project Number: 10003422 Inv: 1 Issue Date: 10/20/2010 Permit Use: SFR W/ATT GAR Applicant: MATTESON CONSTRUCTION PO BOX 1060 OTIS ORCHARDS WA 99027 Contact: MATTESON CONSTRUCTION PO BOX 1060 OTIS ORCHARDS WA 99027 Setbacks - Front: Left: Right: Group Name: Project Name: Phone: (509) 723-8873 Phone: (509) 723-8873 Rear: Permits Building Permit Contractor: MA 1"I ESON CONSTRUCTION LLC License#: MATTECL991CB 1&2 FAMILY COV DECK GAR WOOD Total Value: FOR BUILDING INSPECTIONS CALL (509) 688-0054. R-3 R-3 U-1 VB VB VB 1,572 RESIDENTIAL PERMIT FEE 88 WSBCC SURCHARGE 733 SF PLNS RVW < 7999 SQ FT $170,796.40 $1,391.35 $4.50 $556.54 Total Permit Fee: $1,952.39 Mechanical Permit Contractor: MATTESON CONSTRUCTION LLC License #: MATTECL991CB DUCT WORK SYSTEM 1 GAS APPLIANCE<=100,000BT 1 VENTILATING FANS 1 DUCT 4 FOR MECHANICAL INSPECTIONS CALL (509) 688-0054. $11.00 $13.00 $44.00 GAS WATER HEATER GAS PIPING Total Permit Fee: 1 $11.00 2 $2.00 $81.00 Plumbing Permit Contractor: MATTESON CONSTRUCTION LLC License#: MATTECL991CB TOILETS/BIDETS TUBS GARBAGE DISPOSAL FOR PLUMBING INSPECTIONS CALL (509) 688-0054. 2 2 1 $12.00 $12.00 $6.00 SINKS DISH WASHERS CLOTHES WASHER Total Permit Fee: 4 1 $24.00 $6.00 $6.00 $66.00 Processed By: DAVIS, JENNA Printed By: MORRIS, HEATHER Page 1 of 2 PERMIT NOTICE The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the applicant/permittee that the use described on the front of this permit complies with applicable codes and that required inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before progressing beyond the point where inspections are required may necessitate removal of certain parts of the construction at the applicant's/permittee's or property owner's expense. At a minimum, the following inspections ARE REQUIRED by City Code: FOOTING — when forms and reinforcement are in place and prior to placement of concrete -all structures, including manufactured homes. NOTE: This inspection includes review of the structure's setback from property lines. Minimum setbacks are established by City of Spokane Valley Ordinance. Curb lines and fence lines are not necessarily indicative of property lines. The responsibility to comply with applicable setback provisions lies solely with the permittee -neither the City of Spokane Valley nor its authorized representatives assume any responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure. Failure to properly locate the structure may require its relocation at the owner's/permittee's expense. FOUNDATION — when forms and reinforcement are in place and prior to placement of concrete. PLUMBING — after rough -in, before covering, and final. MECHANICAL — rough -in of piping, before covering, metal chimneys before concealment, and final. FRAMING — after all framing, bracing and blocking is in place, rough electrical, plumbing and mechanical systems are complete, and prior to concealing. FINAL — when complete and prior to occupancy and/or use. All permits require final inspection. NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site plan) required by ordinance or as a condition of approval of this permit. Items such as the installation of fire hydrants, fire department access, on-site drainage ('208' swales), road improvements, parking and landscaping are common requirements of a permit/site plan which must be completed prior to final approval of a building or issuance of a Certificate of Occupancy. MANUFACTURED HOMES — Final inspection required when complete, stairs, handrails, skirting, etc. installed, and prior to occupancy; completed inspection record card must be available on site. PLUMBING REVERSALS FOR SEWER CONNECTIONS — prior to cover. RIGHT-OF-WAY/APPROACH — prior to placement of concrete/asphalt or, if gravel approach, after completion. In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc. must be inspected prior to cover. Check with the Building department for "special inspections" in conjunction with commercial projects. FOR INSPECTIONS Please give one working day/24 hour notice. Different parts of your project may require permits and inspections from more than one agency. Building, plumbing (includes interior reversals for sewer) and mechanical, City of Spokane Valley Building Division 688-0054 Road cuts for utilities or driveways, City of Spokane Valley Public Works 688-0195 or State Dept of Transportation 324-6000 Permits and inspections for electrical wiring. State Department of Labor Permits and inspections for Sewer Connection, Spokane County Utilities Division And Industries 324-2640 477.3604 Permits and inspections for on-site septic systems, Spokane Regional Fire sprinkler and alarm systems and private access road inspections, Spokane Valley Health Distnct 324-1560 Fire Department 892-4122 State law RCW 19.122 requires that prior to any excavation the "CALL BEFORE YOU DIG" center must be notified. Call before you dig at least 2 working days in advance, 456-8000. PERMIT EXPIRATION AND REFUNDS All permits shall expire by limitation and be declared void if a) work is not started within 180 days of obtaining a permit, or b) work is abandoned for 180 days or more after beginning work, or c) after two years from the date of permit issuance, regardless of whether the work is finished. If a permit is expired for time, a new permit may be obtained for half the permit fee based on the value of the remainder of the work to finish the original permit. All refund requests must be made in writing by the original permittee to the Building Official no later than 180 days after the date of fee payment. 100% refunds will be granted for any fee erroneously paid or collected. Refunds of not more than 80% of a permit fee may be authorized when no work has been done under the permit issued. Refunds of not more than 80% of a plan review fee paid may be authorized when an application is withdrawn or cancelled prior to the plan review being completed. Owner / Agent Date Staff Approval Date I Sc.„.okan��Valley. PERMIT CENTER 11703 E. Sprague Avenue, Suite B-3 Spokane Valley, WA 99206 Site Information Project Information 1 Site Address: 18113 E MICHIELLI AVE SPOKANE VALLEY, WA 99016 Parcel Number: 55074.3906 Project Number: 10003422 Inv: 1 Issue Date: 10/20/2010 Permit Use: SFR W/ATT GAR 1 Permits 1 I Payment Summary Total Fees AmountPaid AmountOwing $2,099.39 $2,099.39 $0.00 Processed By: DAVIS, JENNA Printed By: MORRIS, HEATHER Tran Date Receipt # Payment Amt 10/18/2010 24742 $556.54 10/20/2010 24788 $1,542.85 Page 2 of 2 PERMIT NOTICE The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the applicant/permittee that the use described on the front of this permit complies with applicable codes and that required inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before progressing beyond the point where inspections are required may necessitate removal of certain parts of the construction at the applicant's/permittee's or property owner's expense. At a minimum, the following inspections ARE REQUIRED by City Code: FOOTING — when forms and reinforcement are in place and prior to placement of concrete -all structures, including manufactured homes. NOTE: This inspection includes review of the structure's setback from property lines. Minimum setbacks are established by City of Spokane Valley Ordinance. Curb lines and fence lines are not necessarily indicative of property lines. The responsibility to comply with applicable setback provisions lies solely with the permittee -neither the City of Spokane Valley nor its authorized representatives assume any responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure. Failure to properly locate the structure may require its relocation at the owner's/permittee's expense. FOUNDATION — when forms and reinforcement are in place and prior to placement of concrete. PLUMBING — after rough -in, before covering, and final. MECHANICAL — rough -in of piping, before covering, metal chimneys before concealment, and final. FRAMING — after all framing, bracing and blocking is in place, rough electrical, plumbing and mechanical systems are complete, and prior to concealing. FINAL — when complete and prior to occupancy and/or use. All permits require final inspection. NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site plan) required by ordinance or as a condition of approval of this permit. Items such as the installation of fire hydrants, fire department access, on-site drainage ('208' swales), road improvements, parking and landscaping are common requirements of a permit/site plan which must be completed prior to final approval of a building or issuance of a Certificate of Occupancy. MANUFACTURED HOMES — Final inspection required when complete, stairs, handrails, skirting, etc. installed, and prior to occupancy; completed inspection record card must be available on site. PLUMBING REVERSALS FOR SEWER CONNECTIONS — prior to cover. RIGHT-OF-WAY/APPROACH — prior to placement of concrete/asphalt or, if gravel approach, after completion. In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc. must be inspected prior to cover. Check with the Building department for "special inspections" in conjunction with commercial projects. FOR INSPECTIONS Please give one working day/24 hour notice. Different parts of your project may require permits and inspections from more than one agency. Building, plumbing (includes interior reversals for sewer) and mechanical, City of Spokane Valley Building Division 688-0054 Road cuts for utilities or driveways, City of Spokane Valley Public Works 688-0195 or State Dept of Transportation 324-6000 Permits and inspections for electrical wiring. Stale Department of Labor Permits and inspections for Sewer Connection. Spokane County Utilities Division And Industries 324-2640 477-3604 Permits and inspections for on-site septic systems, Spokane Regional Fire sprinkler and alarrn systems and private access road inspections, Spokane Valley Fire Department 892-4122 Health Distnct 324-1560 State law RCW 19.122 requires that prior to any excavation the "CALL BEFORE YOU DIG" center must be notified. Call before you dig at least 2 working days in advance, 456-8000. PERMIT EXPIRATION AND REFUNDS All permits shall expire by limitation and be declared void if a) work is not started within 180 days of obtaining a permit, or b) work is abandoned for 180 days or more after beginning work, or c) after two years from the date of permit issuance, regardless of whether the work is finished. If a permit is expired for time, a new permit may be obtained for half the permit fee based on the value of the remainder of the work to finish the original permit. All refund requests must be made in writing by the original permittee to the Building Official no later than 180 days after the date of fee payment. 100% refunds will be granted for any fee erroneously paid or collected. Refunds of not more than 80% of a permit fee may be authorized when no w. • - .een done under the permit issued. Refunds of not more than 80% of a plan review fee paid may be authorized when an application i. with.., n or cancelled prior to the plan review being completed. Owner / Agent Date Staff Approval Date