2010, 10-20 Permit: 10003422 Residence*Wane
Valley®
Permit Center
11703 E Sprague Ave Suite B3 Spokane Valley WA 99206
509.720-5240 ♦ Fax: 509.688.0037 • email: permitcenter®spokanevalley.org
Site Information
Project Information
1
Site Address: 18113 E MICIIIELLI AVE
Parcel Number: 55074.3906
Subdivision:
Block:
Lot:
Zoning: R-4 SF Res Urban District
Owner: PAKIBA II / BIG SKY HOMES & DE
Address: 712 S MOEN ST
GREENACRES, WA 99016
Building Inspector: EAST
Water Dist: CONSOLIDATED ID #19
Project Number: 10003422 Inv: 1 Issue Date: 10/20/2010
Permit Use: SFR W/ATT GAR
Applicant: MATTESON CONSTRUCTION
PO BOX 1060
OTIS ORCHARDS WA 99027
Contact: MATTESON CONSTRUCTION
PO BOX 1060
OTIS ORCHARDS WA 99027
Setbacks - Front:
Group Name:
Project Name:
Left: Right:
Phone: (509) 723-8873
Phone: (509) 723-8873
Rear:
Permits
Building Permit Contractor: MATTESON CONSTRUCTION LLC
1&2 FAMILY
COV DECK
GAR WOOD
Total Value:
FOR BUILDING INSPECTIONS CALL (509) 688-0054.
R-3
R-3
U-1
VB
VB
VB
License#: MATTECL991CB
1,572 RESIDENTIAL PERMIT FEE
88 WSBCC SURCHARGE
733 SF PLNS RVW < 7999 SQ FT
$170,796.40
Mechanical Permit Contractor: MATTESON CONSTRUCTION LLC
DUCT WORK SYSTEM
GAS APPLIANCE<=100,000BT
VENTILATING FANS 1 DUCT
FOR MECHANICAL INSPECTIONS CALL (509) 688-0054.
Total Permit Fee:
License #: MATTECL991CB
1 $11.00 GAS WATER HEATER
I $13.00 GAS PIPING
4 $44.00
Total Permit Fee:
$1,391.35
$4.50
$556.54
$1,952.39
1 $11.00
2 $2.00
$81.00
Plumbing Permit Contractor: MATTESON CONSTRUCTION LLC
TOILETS/BIDETS
TUBS
GARBAGE DISPOSAL,
FOR PLUMBING INSPECTIONS CALL (509) 688-0054.
Processed By: DAVIS. JENNA
Printed By: MORRIS, HEATHER Page 1 of 2
2
2
1
License #: MATTECL991CB
$12.00
$12.00
$6.00
SINKS
DISH WASHERS
CLOTHES WASHER
REV SITE
Total Permit Fee:
4
1
$24.00
$6.00
$6.00
$66.00
NOTICE
The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by definition, is the
property owner or an authorized agent of the property owner. It is the responsibility of the applicant/permitee that the use described on
the front of this permit complies with applicable codes and that required inspections are requested. Failure to request inspections as
listed below and obtain the necessary approvals before progressing beyond the point where inspections are required and may
necessitate removal of certain parts of the construction are at the applicant's/permittee's or property owner's expense.
At a minimum, the following inspections ARE REQUIRED by the Spokane Valley Municipal Code (SVMC):
FOOTING - when forms and reinforcements are in place and prior to placement of concrete -all structures, including manufactured
homes.
NOTE: This inspection includes review of the structures setback from property lines. Minimum setbacks are established by SVMC.
Curb lines and fence lines are not necessarily indicative of property lines. The responsibility to comply with applicable setback
provisions lies solely with the permitee-neither the City of Spokane Valley nor its authorized representatives assume any
responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure.
Failure to properly locate the structure may require its relocation at the owner's/permittee's expense.
FOUNDATION - when forms and reinforcement are in place and prior to placement of concrete.
PLUMBING - after rough -in, before covering and final.
MECHANICAL - rough -in of piping, before covering, metal chimneys before concealment and final.
FRAMING - after all framing, bracing and blocking is in place, rough electrical, plumbing and mechanical systems are complete, and
prior to concealing.
FINAL - when complete and prior to occupancy and/or use; all permits require final inspection.
NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the
approved site plan) required by ordinance or as a condition of approval of this permit. Items such as installation of fire hydrants,
fire department access, on-site drainage ('208' swa/es), road improvements, parking and landscaping are common requirements of
a permit/site plan which must be completed prior to final approval of a building or issuance of a Certificate of Occupancy.
MANUFACTURED HOMES - final inspection required when complete, stairs, handrails, skirting, etc. installed and prior to occupancy;
completed inspection record card must be available on site.
PLUMBING REVERSALS FOR SEWER CONNECTIONS - prior to cover
RIGHT-OF-WAY/APPROACH - prior to placement of concrete / asphalt or, if gravel approach, after completion.
In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc.,
must be inspected prior to cover. Check with the Building department for special inspections in conjunction with commercial projects.
State law RCW 19.122 requires that prior to any excavation the 'CALL BEFORE YOU DIG' center must be notified. Call 411 at least 3
working days in advance.
PERMIT EXPIRATION AND REFUNDS
Expirations:
Building or other permits (regulated under SVMC Chapter 24) shall expire by limitation and be declared void if a) work is not started
within 180 days of obtaining a permit, or b) work is abandoned for 180 days or more after beginning work, or c) after two years from the
date of permit issuance, regardless of whether the work is finished. If a permit is expired for time, a new permit may be obtained for
half the permit fee based on the value of the remainder of the work required to finish the original permit.
Right-of-way permits (regulated under SVMC Chapter 22) issued between April 1, and September 30, are valid for 30 days after the
date of issuance, with a one-time 30 -day extension available. Right-of-way permits issued between October 1, and March 31, shall be
valid until the following April 30.
Refunds:
All refund requests must be made in writing by the original permitee to the Building Official no later than 180 days after the date of fee
payment. Full refunds will be granted for any permit issued in error. Rate of refund shall be as set forth in the City of Spokane Valley
Master Fee Schedule in effect at the time of permit application. A copy of this schedule is available at Permit Center and also available
for reference on the city website at: http://www.spokanevalley.orq and search for "fees"
Owner/Agent Date:
Staff Approval Date:
Payment Summary
Spmbliane
Permit Center
11703 E Sprague Ave Suite B3 Spokane Valley WA 99206
509.720-5240 ♦ Fax: 509.688.0037 ♦ email: permitcenter@spokanevaltey.org
Site Information
Project Information
Site Address: 18113 E MICHIELLI AVE
SPOKANE VALLEY, WA 99016
Parcel Number: 55074.3906
Project Number: 10003422 Inv: 1 Issue Date: 10/20/2010
Permit Use: SFR W/ATT GAR
Permits
Total Fees AmountPaid AmountOwing
$2,099.39 $2.099.39 $0.00
Processed By: DAVIS, JENNA
Printed By: MORRIS, HEATHER
Tran Date Receipt # Payment Amt
10/18/2010 24742 $556.54
10/20/2010 24788 $1,542.85
Page 2 of 2
REV SITE
NOTICE
The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by definition, is the
property owner or an authorized agent of the property owner. It is the responsibility of the applicant/permitee that the use described on
the front of this permit complies with applicable codes and that required inspections are requested. Failure to request inspections as
listed below and obtain the necessary approvals before progressing beyond the point where inspections are required and may
necessitate removal of certain parts of the construction are at the applicant's/permittee's or property owner's expense.
At a minimum, the following inspections ARE REQUIRED by the Spokane Valley Municipal Code (SVMC):
FOOTING - when forms and reinforcements are in place and prior to placement of concrete -all structures, including manufactured
homes.
NOTE: This inspection includes review of the structures setback from property lines. Minimum setbacks are established by SVMC.
Curb lines and fence lines are not necessarily indicative of property lines. The responsibility to comply with applicable setback
provisions lies solely with the permitee-neither the City of Spokane Valley nor its authorized representatives assume any
responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure.
Failure to properly locate the structure may require its relocation at the owner's/permittee's expense.
FOUNDATION - when forms and reinforcement are in place and prior to placement of concrete.
PLUMBING - after rough -in, before covering and final.
MECHANICAL - rough -in of piping, before covering, metal chimneys before concealment and final.
FRAMING - after all framing, bracing and blocking is in place, rough electrical, plumbing and mechanical systems are complete, and
prior to concealing.
FINAL - when complete and prior to occupancy and/or use; all permits require final inspection.
NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the
approved site plan) required by ordinance or as a condition of approval of this permit. Items such as installation of fire hydrants,
fire department access, on-site drainage (208' swales), road improvements, parking and landscaping are common requirements of
a permit/site plan which must be completed prior to final approval of a building or issuance of a Certificate of Occupancy.
MANUFACTURED HOMES - final inspection required when complete, stairs, handrails, skirting, etc. installed and prior to occupancy;
completed inspection record card must be available on site.
PLUMBING REVERSALS FOR SEWER CONNECTIONS - prior to cover
RIGHT-OF-WAY/APPROACH - prior to placement of concrete / asphalt or, if gravel approach, after completion.
In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc.,
must be inspected prior to cover. Check with the Building department for special inspections in conjunction with commercial projects.
State law RCW 19.122 requires that prior to any excavation the 'CALL BEFORE YOU DIG' center must be notified. Call 411 at least 3
working days in advance.
PERMIT EXPIRATION AND REFUNDS
Expirations:
Building or other permits (regulated under SVMC Chapter 24) shall expire by limitation and be declared void if a) work is not started
within 180 days of obtaining a permit, or b) work is abandoned for 180 days or more after beginning work, or c) after two years from the
date of permit issuance, regardless of whether the work is finished. If a permit is expired for time, a new permit may be obtained for
half the permit fee based on the value of the remainder of the work required to finish the original permit.
Right-of-way permits (regulated under SVMC Chapter 22) issued between April 1, and September 30, are valid for 30 days after the
date of issuance, with a one-time 30 -day extension available. Right-of-way permits issued between October 1, and March 31, shall be
valid until the following April 30.
Refunds:
All refund requests must be made in writing by the original permitee to the Building Official no later than 180 days after the date of fee
payment. Full refunds will be granted for any permit issued in error. Rate of refund shall be as set forth in the City of Spokane Valley
Master Fee Sch- . . - ' -ff V at the time of permit application. A copy of this schedule is available at Permit Center and also available
for reference, • n the city - >ite at: http://www.spokanevallev.orq and search for "fees"
Owner/Agent
Staff Approval
Date:
Spokane�
jUalley°
PERMIT CENTER
11703 E. Sprague Avenue, Suite B-3
Spokane Valley, WA 99206
1
Site Information
Project Information
1
Site Address: 18113 E MICHIELLI AVE
Parcel Number: 55074.3906
Subdivision:
Block:
Lot:
Zoning: R-4 SF Res Urban District
Owner: PAKIBA LLC
Address: 712 S MOEN ST
GREENACRES, WA 99016
Building Inspector: EAST
Water Dist: CONSOLIDATED ID #19
Project Number: 10003422 Inv: 1 Issue Date: 10/20/2010
Permit Use: SFR W/ATT GAR
Applicant: MATTESON CONSTRUCTION
PO BOX 1060
OTIS ORCHARDS WA 99027
Contact: MATTESON CONSTRUCTION
PO BOX 1060
OTIS ORCHARDS WA 99027
Setbacks - Front: Left: Right:
Group Name:
Project Name:
Phone: (509) 723-8873
Phone: (509) 723-8873
Rear:
Permits
Building Permit Contractor:
MA 1"I ESON CONSTRUCTION LLC
License#: MATTECL991CB
1&2 FAMILY
COV DECK
GAR WOOD
Total Value:
FOR BUILDING INSPECTIONS CALL (509) 688-0054.
R-3
R-3
U-1
VB
VB
VB
1,572 RESIDENTIAL PERMIT FEE
88 WSBCC SURCHARGE
733 SF PLNS RVW < 7999 SQ FT
$170,796.40
$1,391.35
$4.50
$556.54
Total Permit Fee: $1,952.39
Mechanical Permit Contractor: MATTESON CONSTRUCTION LLC
License #: MATTECL991CB
DUCT WORK SYSTEM 1
GAS APPLIANCE<=100,000BT 1
VENTILATING FANS 1 DUCT 4
FOR MECHANICAL INSPECTIONS CALL (509) 688-0054.
$11.00
$13.00
$44.00
GAS WATER HEATER
GAS PIPING
Total Permit Fee:
1 $11.00
2 $2.00
$81.00
Plumbing Permit Contractor:
MATTESON CONSTRUCTION LLC
License#: MATTECL991CB
TOILETS/BIDETS
TUBS
GARBAGE DISPOSAL
FOR PLUMBING INSPECTIONS CALL (509) 688-0054.
2
2
1
$12.00
$12.00
$6.00
SINKS
DISH WASHERS
CLOTHES WASHER
Total Permit Fee:
4
1
$24.00
$6.00
$6.00
$66.00
Processed By: DAVIS, JENNA
Printed By: MORRIS, HEATHER Page 1 of 2
PERMIT
NOTICE
The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by
definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the
applicant/permittee that the use described on the front of this permit complies with applicable codes and that required
inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before
progressing beyond the point where inspections are required may necessitate removal of certain parts of the
construction at the applicant's/permittee's or property owner's expense. At a minimum, the following inspections ARE
REQUIRED by City Code:
FOOTING — when forms and reinforcement are in place and prior to placement of concrete -all structures, including manufactured homes.
NOTE: This inspection includes review of the structure's setback from property lines. Minimum setbacks are established by City of Spokane
Valley Ordinance. Curb lines and fence lines are not necessarily indicative of property lines. The responsibility to comply with applicable
setback provisions lies solely with the permittee -neither the City of Spokane Valley nor its authorized representatives assume any
responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure. Failure to
properly locate the structure may require its relocation at the owner's/permittee's expense.
FOUNDATION — when forms and reinforcement are in place and prior to placement of concrete.
PLUMBING — after rough -in, before covering, and final.
MECHANICAL — rough -in of piping, before covering, metal chimneys before concealment, and final.
FRAMING — after all framing, bracing and blocking is in place, rough electrical, plumbing and mechanical systems are complete, and prior to
concealing.
FINAL — when complete and prior to occupancy and/or use. All permits require final inspection.
NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site
plan) required by ordinance or as a condition of approval of this permit. Items such as the installation of fire hydrants, fire department access,
on-site drainage ('208' swales), road improvements, parking and landscaping are common requirements of a permit/site plan which must be
completed prior to final approval of a building or issuance of a Certificate of Occupancy.
MANUFACTURED HOMES — Final inspection required when complete, stairs, handrails, skirting, etc. installed, and prior to occupancy;
completed inspection record card must be available on site.
PLUMBING REVERSALS FOR SEWER CONNECTIONS — prior to cover.
RIGHT-OF-WAY/APPROACH — prior to placement of concrete/asphalt or, if gravel approach, after completion.
In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc. must
be inspected prior to cover. Check with the Building department for "special inspections" in conjunction with commercial projects.
FOR INSPECTIONS
Please give one working day/24 hour notice. Different parts of your project may require permits and inspections from more than one agency.
Building, plumbing (includes interior reversals for sewer) and
mechanical, City of Spokane Valley Building Division 688-0054
Road cuts for utilities or driveways, City of Spokane Valley
Public Works 688-0195 or State Dept of Transportation
324-6000
Permits and inspections for electrical wiring. State Department of Labor Permits and inspections for Sewer Connection, Spokane County Utilities Division
And Industries 324-2640 477.3604
Permits and inspections for on-site septic systems, Spokane Regional Fire sprinkler and alarm systems and private access road inspections, Spokane Valley
Health Distnct 324-1560 Fire Department 892-4122
State law RCW 19.122 requires that prior to any excavation the "CALL BEFORE YOU DIG" center must be notified. Call before you dig at least 2 working days in advance, 456-8000.
PERMIT EXPIRATION AND REFUNDS
All permits shall expire by limitation and be declared void if a) work is not started within 180 days of obtaining a permit, or b) work is
abandoned for 180 days or more after beginning work, or c) after two years from the date of permit issuance, regardless of whether the work is
finished. If a permit is expired for time, a new permit may be obtained for half the permit fee based on the value of the remainder of the work to
finish the original permit.
All refund requests must be made in writing by the original permittee to the Building Official no later than 180 days after the date of fee
payment. 100% refunds will be granted for any fee erroneously paid or collected. Refunds of not more than 80% of a permit fee may be
authorized when no work has been done under the permit issued. Refunds of not more than 80% of a plan review fee paid may be authorized
when an application is withdrawn or cancelled prior to the plan review being completed.
Owner / Agent Date
Staff Approval Date
I
Sc.„.okan��Valley.
PERMIT CENTER
11703 E. Sprague Avenue, Suite B-3
Spokane Valley, WA 99206
Site Information
Project Information
1
Site Address: 18113 E MICHIELLI AVE
SPOKANE VALLEY, WA 99016
Parcel Number: 55074.3906
Project Number: 10003422 Inv: 1 Issue Date: 10/20/2010
Permit Use: SFR W/ATT GAR
1
Permits
1
I
Payment Summary
Total Fees AmountPaid AmountOwing
$2,099.39 $2,099.39 $0.00
Processed By: DAVIS, JENNA
Printed By: MORRIS, HEATHER
Tran Date Receipt # Payment Amt
10/18/2010 24742 $556.54
10/20/2010 24788 $1,542.85
Page 2 of 2
PERMIT
NOTICE
The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by
definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the
applicant/permittee that the use described on the front of this permit complies with applicable codes and that required
inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before
progressing beyond the point where inspections are required may necessitate removal of certain parts of the
construction at the applicant's/permittee's or property owner's expense. At a minimum, the following inspections ARE
REQUIRED by City Code:
FOOTING — when forms and reinforcement are in place and prior to placement of concrete -all structures, including manufactured homes.
NOTE: This inspection includes review of the structure's setback from property lines. Minimum setbacks are established by City of Spokane
Valley Ordinance. Curb lines and fence lines are not necessarily indicative of property lines. The responsibility to comply with applicable
setback provisions lies solely with the permittee -neither the City of Spokane Valley nor its authorized representatives assume any
responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure. Failure to
properly locate the structure may require its relocation at the owner's/permittee's expense.
FOUNDATION — when forms and reinforcement are in place and prior to placement of concrete.
PLUMBING — after rough -in, before covering, and final.
MECHANICAL — rough -in of piping, before covering, metal chimneys before concealment, and final.
FRAMING — after all framing, bracing and blocking is in place, rough electrical, plumbing and mechanical systems are complete, and prior to
concealing.
FINAL — when complete and prior to occupancy and/or use. All permits require final inspection.
NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site
plan) required by ordinance or as a condition of approval of this permit. Items such as the installation of fire hydrants, fire department access,
on-site drainage ('208' swales), road improvements, parking and landscaping are common requirements of a permit/site plan which must be
completed prior to final approval of a building or issuance of a Certificate of Occupancy.
MANUFACTURED HOMES — Final inspection required when complete, stairs, handrails, skirting, etc. installed, and prior to occupancy;
completed inspection record card must be available on site.
PLUMBING REVERSALS FOR SEWER CONNECTIONS — prior to cover.
RIGHT-OF-WAY/APPROACH — prior to placement of concrete/asphalt or, if gravel approach, after completion.
In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc. must
be inspected prior to cover. Check with the Building department for "special inspections" in conjunction with commercial projects.
FOR INSPECTIONS
Please give one working day/24 hour notice. Different parts of your project may require permits and inspections from more than one agency.
Building, plumbing (includes interior reversals for sewer) and
mechanical, City of Spokane Valley Building Division 688-0054
Road cuts for utilities or driveways, City of Spokane Valley
Public Works 688-0195 or State Dept of Transportation
324-6000
Permits and inspections for electrical wiring. Stale Department of Labor Permits and inspections for Sewer Connection. Spokane County Utilities Division
And Industries 324-2640 477-3604
Permits and inspections for on-site septic systems, Spokane Regional Fire sprinkler and alarrn systems and private access road inspections, Spokane Valley
Fire Department 892-4122
Health Distnct 324-1560
State law RCW 19.122 requires that prior to any excavation the "CALL BEFORE YOU DIG" center must be notified. Call before you dig at least 2 working days in advance, 456-8000.
PERMIT EXPIRATION AND REFUNDS
All permits shall expire by limitation and be declared void if a) work is not started within 180 days of obtaining a permit, or b) work is
abandoned for 180 days or more after beginning work, or c) after two years from the date of permit issuance, regardless of whether the work is
finished. If a permit is expired for time, a new permit may be obtained for half the permit fee based on the value of the remainder of the work to
finish the original permit.
All refund requests must be made in writing by the original permittee to the Building Official no later than 180 days after the date of fee
payment. 100% refunds will be granted for any fee erroneously paid or collected. Refunds of not more than 80% of a permit fee may be
authorized when no w. • - .een done under the permit issued. Refunds of not more than 80% of a plan review fee paid may be authorized
when an application i. with.., n or cancelled prior to the plan review being completed.
Owner / Agent Date
Staff Approval Date