Loading...
2008, 07-22 Permit App: 08002738 ResidenceProject Number: 08002738 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Information:h.,, Permit Use: NEW SFR -SEWER Contact: CLIFF SCHMITZ CONSTRUCTION Address: 16520 E. SECRETARIAT C - S - Z: VERADALE, WA 99037 Setbacks: Front Left: Right: Rear: Phone: (509) 922-4297 Group Name: Site Information: Project Name: Plat Key: Name: Range Date: 7/22/2008 Page 1 of 3 OF Pr District: East Parcel Number: 55074.3809 Block: SiteAddress: 18116 E MICHIELLI AVE Location:: CSV Lot: Owner: Name: CLIFF SCHMITZ CONSTRUCTIO Address: 16520 E SECRETARIAT LN VERADALE, WA 99037 Zoning: R-4 SF Res Urban District Water District: 134 CONSOLIDATED ID #19 Area: 7,154 Sq Ft Width: 0 Nbr of Bldgs: 0 Nbr of Dwellings: 0 Review Information: Hold: LI Depth: 0 Right Of Way (ft): 0 Review Building Plan Review Released By: Originally Released: Landuse/Zoning/HE Conditions 7/18/2008 By: tmelbourn Released By: Sewer Review Permits: Originally Released: 7/22/2008 By: cjjanssen Released By: Originally Released: 7/16/2008 By: jdavis Operator: jmm Printed By: jmm Print Date: 7/22/2008 Project Number: 08002738 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 7/22/2008 Page 2 of 3 Contractor: CLIFF SCHMITZ Address: 16520 E SECRETARIAT VERADALE WA 99037 Description 1&2 FAMILY 2ND FLOOR BASEMENT U COV DECK GARAGE Grp lug Notes R-3 VB R-3 VB R-3 VB R-3 VB U-1 VB Item Description RESIDENTIAL PERMIT FEE WSBC SURCHARGE SF PLNS RVW < 7999 SQ FT Contractor: STURM HEATING Address: 1112 N NELSON SPOKANE, WA 99202 Item Description GAS WATER HEATER GAS APPLIANCE<=100,000BTU GAS PIPING VENTILATING FANS HOOD -TYPE II Building Permit Firm: CLIFF SCHMITZ CONSTRUCTIO Phone: (509) 922-4297 This Application: Total Project: So Ft Valuation Sq Ft Valuation 851 $80,836.49 851 $80,836.49 427 $31,888.36 427 $31,888.36 851 $12,765.00 851 $12,765.00 40 $600.00 40 $600.00 850 $16,150.00 850 $16,150.00 Totals: 3,019 $142,239.85 3,019 $142,239.85 Units 1 1 1 Unit Desc SELECT SELECT SELECT Permit Total Fees: Mechanical Permit Fee Amount $1,234.55 $4.50 $493.82 $1,732.87 Firm: STURM HEATING Phone: (509) 325-4505 Units Unit Desc 1 NUMBER OF 1 NUMBER OF 2 # OF UNITS 2 NUMBER OF 1 NUMBER OF Operator: jmm Printed By: jmm Permit Total Fees: Print Date: Fee Amount $10.00 $12.00 $2.00 $20.00 $10.00 $54.00 7/22/2008 Project Number: 08002738 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 7/22/2008 Page 3 of 3 Plumbing Permit Contractor: THOMAS PLUMBING & HEATING Item Description TOILETS/BIDETS SINKS TUBS DISH WASHERS GARBAGE DISPOSAL CLOTHES WASHER FLOOR DRAINS MISCELLANEOUS FIXTURES Notes: Payment Summary::.. ... ..._ Permit Type Building Permit Mechanical Permit Plumbing Permit Units 2 3 2 1 1 1 1 3 Fee Amount $1,732.87 $54.00 $84.00 Firm: Phone: Unit Desc NUMBER OF NUMBER OF NUMBER OF NUMBER OF NUMBER OF NUMBER OF NUMBER OF NUMBER OF Permit Total Fees: Invoice Amount $1,732.87 $54.00 $84.00 Fee Amount $12.00 $18.00 $12.00 $6.00 $6.00 $6.00 $6.00 $18.00 Amount Paid $0.00 $0.00 $0.00 $84.00 Amount Owing $1,732.87 $54.00 $84.00 $1,870.87 $1,870.87 $0.00 $1,870.87 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: jmm Printed By: jmm Print Date: 7/22/2008 1crn Permit Center 11707E Sprague Ave, Suite106 e Valley Spokane Valley, WA 99206 09 688 0 i (509)688-0036 FAX: «Rv�_A .s okane. atley.or'.com Community Development _ oka --- -- Residential Construction Permit Application SITE ADDRESS ASSESSORS PARCEL NO: fi may, c/ 7 y . 3?� LEGAL DESCRIPTION: Contractor- L. O or + L, CP New Construction o Addition/Remodel o Other: PERMIT NUMBER:: PERMIT FEE: t73 o Accessory Bldg ❑ Deck Building owner Name: Address: City: Phone: Contact Person=; Name: Phone: L ♦✓ t. Fax: SC- Zip: G Zip: Describe the scope of work in detail: **************The followin HEIGHT TO PEAK: MAIN FLOOR TO SQ. FTG: 1 DV --- FINISHED —FINISHED BAS5HENT GARAG SQ. FTG: - # OF BEDI OMS: CONSTRUCTION TYPE: DISCLAIMER is The permitee /wi verifies, acknowledgesby water. .agreesOwnership of th this that 1) -If this Spokane Valley Pefrmiit inure o the property owner.ction of or on a ng, the 3) The dwelling i is be servederty w er potable 2) owner in this transaction. 4) All construction is to be done signatory is the property owner or has permission to represent the property royal for any violation reiew fed City state or in full compliance with the City of Spokane Valley Development Vae Permit Referenced ot a permit or app available for review at the City of Spokane ,Valley Permit Center. 5) T is City of SpokaneY y approved before local laws, codes or ordinanc- �_ 6) ;�i�s or :.ditional information may be required to be submitted, and subsequent) this application can be p. e .ed. ,r; DI4 " FLOO' Lic No: City Business Lic No: Cost of Project: Exv. Date: MUST be com lete: (write N/A if not a # OF STyRIES: UNFIN BASEMENT SQ. FTG: NSIONS: •- Q. FTG: FTG: licable)********************** TOTAL HABITABLE SPACE: OUB' DEC COV. PATIO, Q. FTG: .. # HEAT SOU• IMPERVIOU SURFACE AREA: 30% SLOPES ON PROPERTY: SEWER OR SEPTIC? Signature Method of Payme ❑ Cash Bankcard #: Authorized Signature: REVISED 8252005 axed permit ap ❑ Check I Date � / ications will only be accepted with major ba k ) A 0 Mastercard ❑ VIN#: Expires: ❑ Other Spo..001\• Valley® For City Use Only PLUS Project Number Project Address 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206 509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. ' Your application review TARGET DATE is 1 The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE —APPLICANT PINK — BUILDING FILE REV 9/07 Co nmi y Development Mechanical Permit sff ADDRESS: Suiiding Owner Nam=: Contractor Name: Address: License No: Contact - =: Name: 11707 E Sprague Ave, Suite 106 Spokane Valley, WA 99206 (509)688-0036 FAX (509)688-0037 www. pokanevallev.0r2 Application DESCRIPTION OF WORK FUEL BURNING APPLIANCE 2 FUEL BURNING APPLIANCE 3 UNLJS I ) APPLIANCE (Additional Fee) 4 UNLISTED APPLIANCE (Additional Fee) 5 USED APPLIANCE (WSEC min. AFUE rating) 6 USED APPLIANCE (WSEC min. AFUE rating) 7 BOILER/REFRIGERATION BOILER/REFRIGERATION 9 BOIL ERlREFRIGERAT1ON 10 BOILER/REFRIGERATION 11 BOILER/REFRIGERATION 12 GAS LOG, GAS INSERT, GAS FIREPLACE 13 RANGE 14 DRYER 15 FUEL BURNING WATER HEATER 16 MISC. FUEL BURNING APPLIANCE 17 GAS PIPING (each outlet) 16 DUCT SYSTEMS PERMIT NUMBER; PERMIT FEE: Commercial ► Residential Phone: City. Phone: City. City Business Lic: Phone More than 100,000 E,rual to or less than 400,000 More than 400,000 Eouai to or less than 400.000 More than 400.000 1 - 100M BTU 101 - 500M BTU 501 - 1,000M BTU 1,001 -1,750M BTU More than 1,750M BTU 19 VENTILATING FANS 20 AIR HANDLER (DOES NOT include dulling) Eriral to or less than 10.000 CFM Greater than 10.000 CFM 21 AIR HANDLER (DOES NOT include ducting) 22 EVAPORATIVE COOLERS 23 TYPE I HOOD 24 TYPE II HOOD 25 HEAT PUMPIAIR CONDITIONER 26 AIR CONDITIONER 27 AIR CONDITIONER 25 AIR CONDITIONER 29 AIR CONDmONER 30 LPG STORAGE TANK 31 WOOD OR PELLET STOVEJINSERT 32 WOOD STOVE - FREE STANDING 33 REPAIR & ADDITIONS 34 VENTILATION SYSTEMS 35 VENTILATION MECHANICAL EXHAUST 36 INCINERATOR - RESIDENCE 37 INCINERATOR - COMMERCIAL METHOD OF PAYMENT: ❑CASH ❑ CHECK ❑ VISA 0 MC CARD AUTHORIZED SIGNATURE: REVISED V26r05 03 TON 3-15 TON 15-30 TON 30-50 TON More than 50 TON EXPIRES: VIN: 1 7_ Fax: State: Fax.: State: X X X X $1200 $15.00 $50.00 $100.00 $50.00 X $100.00 X x X X $1200 $20.00 $25.00 $35.00 X $60.00 X X X X X X X X X X X x X X X X X X X X X X x X X X $10.00 $10.00 $10.00 $10.00 $10.00 51.00 510.00 510.00 $12.00 $15.00 510.00 S50_00 $10.00 51200 520.00 525.00 = $35.00 560.00 510.00 510.00 525.00 515.00 512.00 512.00 = 519.00 522.00 SUBTOTAL PROCESSING FEE TOTAL PERMIT FEE DUE: Zip: Zip: S35.D0 JF`v""�� Spokane Valley, vlA 99206 (509)588-0036 FAX: (509)688-0037 Co-iTIcmiy DwelopmyrtK ,; a•-cookane�aiks oro Plumbing Permit Application Valley crrE ADDRESS: - I PERMI I NUMBER: } PERMIT F1 E: Commercial Residential Building Ower Name: Phone_ Fax: Address: City. Stat. Zrp: Ceutrador -7- i 40 ! i I 1 iJ -PCeUM'S l "4 Q .. Phi Fax Nam: Address: City State: Zip: License No: City Business Lic: Contact Name:. Phone: T r 1 DESCRIPTION OF WORK TOILETS S OF UMTS X WA ER cLOSET. BIDE s 2 UPJNALS 3 r—� 4 TUBS Z X COST 56.00 $6.00 S6.00 TOTAL AMOUNT SHOWERS (PER TRAP) BATH, STALL ON-SITE BUILT 56.00 5 SINKS LAVSJBASINS, BAR. FLOOR. KITCHEN. LAUNDRY, UTILITY, JANITOR, PHOTO. X-RAY, FOOD. PREP/CULINARY MEAT X $6.00 DISHWASHER X 5 CLOTHES WASHER GARBAGE DISPOSAL X $6.00 S6.00 9 WA tK SOFTENER $6.00 S6.00 10 - ELECTRIC HOT WATER TANK NOTE IF GAS. SEE MECHANICAL X 56.00 11 FLOOR DRAINS AREA. CASE, COIL TRENCH, CONDENSATE X 56.00 12 ROOF DRAINS/OVERFLOW DRAINS X $6.00 13 FOUNTAINS, DRINKING X $6.00 WAPIPING/DRAIN-IN WASTE 14 VENT. PLUMBING. REVERSAL NSTALLATION, ALTERATION. REPAIR, REVERSALS X $6.00 15 SEWAGE EJECTOR GRINDER, SUMP PUMP X $6.00 16 WATER USING DEVICE ICE AN/OR COFFEE MAKER. HOSE BIB, STEAMER PROOFER,CARBONATOR,SWANP COOLER 3 X $6.00 17 CROSS CONNECTION DEVICE VACUUM BREAKER. CHECK VALVE, AND RP.B.P.D. FOR VATS. TANKS, BOILERS X 56.00 15 INTERCEPTORS GREASE TRAP, SAND TRAP, CHEMICAL HOLDING TANK X $6.00 19 MEDICAL GAS (per outlet) NITROUS. OXYGEN X 56.00 20 MISCELLANEOUS PLUMBING FIXTURE $6.00 21 PRIVATE SEWAGE DISPOSALISYS X $20.00 22 INDUSTRIAL WASTE INTERCEPTOR X 515.00 METHOD OF PAYMENT: ❑CASH D CHECK D VISA D MC Card# AUTHORIZED SIGNATLJIRE: ➢,t'�IS� Ef2611)5 EXPIRES: AN: SUBTOTAL PROCESSING FEE 535.00 TOTAL PERMIT FEt DUE: PLANNING DEPT. APPROVED BY:C<SCL� L� DATE.�.,�� 1N3W3SV3• ll1IlIlf1 liW3SV3 tl3Q2tDH lotaoI .-a ! ',MOM MNINIMM, l(6rL1(6 in 1E,LL Lott 6LK Z ci0 UP/ )71)-(3 I7"13IFi�tW