2008, 08-18 Permit App: 08003161 Egress WindowProject Number: 08003161 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 8/18/2008 Page 1 of 2
Project Information:
Permit Use: (1) EGRESS WINDOW Contact: RED TOP CONSTRUCTION
Address: 21507 N MONROE
C - S - Z: SPOKANE WA 99208
Setbacks: Front Left: Right: Rear: Phone: (509) 276-2273
Group Name:
Site Information: Project Name:
Plat Key: 001834 Name: OPPORTUNITY TR # 01-354 District: Nort
Parcel Number: 45084.0379
Block: Lot:
SiteAddress: 10115 E MISSION AVE
Location:: CSV
Zoning: R-3 SF Res District
Water District: 011 MODERN
Area: 37,311 Sq Ft Width: 0
Nbr of Bldgs: 0 Nbr of Dwellings: 0
Owner: Name: HOLMES, STEPHEN A & PATRICI
Address: PO BOX 683
PORT ORCHARD, WA 98366
Hold: ❑
Depth: 0 Right Of Way (ft): 0
Review Information •
Review
Building Plan Review
Released By:
Originally Released: 8/14/2008 By: tmelbourn
Permits.
Building Permit
Contractor: RED TOP CONSTRUCTION Firm: RED TOP CONSTRUCTION
Address: 21507 N MONROE Phone: (509) 276-2273
SPOKANE WA 99208
This Application: Total Project:
Description Grp Tv a Notes Sq Ft Valuation Sq Ft Valuation
1&2 FAMILY R-3 VB EGRESS 0 $750.00 0 $750.00
WINDOW
Item Description
RESIDENTIAL PERMIT FEE
WSBC SURCHARGE
SF PLNS RVW < 7999 SQ FT
Totals: 0 $750.00 0 $750.00
Units Unit Desc
1 SELECT
1 SELECT
1 SELECT
Operator: JD Printed By: JD
Permit Total Fees:
Fee Amount
$69.25
$4.50
$27.70
$101.45
Print Date: 8/18/2008
Project Number: 08003161 Inv: 1
Notes:
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 8/18/2008 Page 2 of 2
Payment Summary:
Permit Type
Building Permit
Fee Amount Invoice Amount
Amount Paid
Amount Owing
$101.45 $101.45 $0.00 8101.45
$101.45 $101.45
$0.00 $101.45
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: JD Printed By: JD
Print Date: 8/18/2008
Spokane
Va11ey.
Community Development
Residential Construction
Permit Application
Permit Center
11703 E Sprague Ave, Suite B-3
Spokane Valley, WA 99206
(509)688-0036 FAX: (509)688-0037
www.spokanevalley.org
PERMIT NUMBER:
PERMIT FEE:
New Construction ❑ Accessory Bldg
n Addition/Remodel Deck
Other:
SITE ADDRESS: �L /
ASSESSORS PARCEL NO: V CCI gat0 379 LEGAL DESCRIPTION: F" pY/ cvc'4 e
/or/s f /11/sSic A /don e• 1/i/7), 992 C
*:.
ne
-06
gOwr
Coritracto� "5r �z M_�kro
# OF STORIES:
f
Name: / /'/ /�
fie //y C
Name: 1 //
S% p42�11 ? 0/0,5
/tpc/ ti 5f cacti o.s
Address: / 6' k 6S3
Address: 2 /70.2 Ay ty 04 to P .Pr2
State:l./A Zip:n34.
City: por/ opr/Fe re)t/1�
City: 040/IE State:o - Zip'�92oG2
Phone: 36o _ 90% - 5...72 Fax:
o
Phone: 5�-17G'227� Fax:,0.276-t273
'
# OF BEDROOMS:CONS.SRUCTION
2 lin -- / o4 %t7ew)
Contractor Lic No // // Exp Date: i./�./ O
R pAtoie977/n0
iContact_Person --'= ;: ::.,,.::. •-:. : c. = .r=:,:: b w_
SEW...ER OR SEPTIC?
--)e wee"
City Business Lic. No: ,6Go !#94-8--2 V./.._.Name:
P,'f?i
�` P70Y4er
Phone: fag - 27C- 2293
Describe the scope of work in detail:
Cost of Project: $ 7 ler elc—
fgyerr lo/^/Jo /// 6OTP.n.o.17 Voorn•
Proposed Use: 674 ye, /)/2,- oo/rI in i,
**************The following MUST be complete: (write N/A if not applicable)**********************
HEIGHT TO PEAK:
A/41
DIMENSIONS:
Are5,4
# OF STORIES:
f
TOTAL HABITABLE SPACE:
2%Z
MAIN FLOOR TO SQ.
FTG: 2 6" J6
2 FLOOR SQ. FTG:
APA
UNFIN BASEMENT SQ. FTG:
290
IMPERVIOUS SURFACE
AREA: A/., e
FINISHED BASEMENT
SQ. FTG: 6C&
GARAGE SQ. FTG:
'V A
DECK/COV. PATIO SQ. FTG:
96
30% SLOPES ON
PROPERTY: //a doe'
# OF BEDROOMS:CONS.SRUCTION
2 lin -- / o4 %t7ew)
TYPE:
YdMe
HEAT SOURCE:
570_5
SEW...ER OR SEPTIC?
--)e wee"
The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or
local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before
this application can be processe.
SIGNATURE
Method of Payment:
❑ Cash
Bankcard #:
Authorized Signature:
REVISED 2/15/07
❑ Check
DATE: / 1"08
❑ Mastercard 0 �i RECEIVED BY
Expires: VIN#: �' OF SPOKANE VALLEY
AUG 1 3 2008
PERMIT CENTER
BY:
RESIDENTIAL CHECK LIST DIRECTIONS:
Place a check mark in box next to each document required for complete submittal.
o SITE PLAN
o Property lines and dimensions
o Direction arrow pointing North and orientation to streets
o Proposed/existing buildings (footprint and dimensions)
o Utilities, septic tank/drain field locations and distances
o Setbacks to property lines
o Distance between buildings
o Right of way/easement location & sizes
o Driveway approach size and location
BUILDING PLANS (3 SETS) (minimum 1/8 inch scale or completely dimensioned)
O Elevations (Front/Rear/Sides) with roof peak and wall height including basement:
❑ Foundation Plan (crawlspace, basement or slab on grade)
o Footing sizes and locations
o Perimeter concrete foundation wall sizes
o Crawlspace ventilation
o Supporting wood cripple walls or beams
❑ Thickened concrete pads supporting
beams or girder trusses
O Floor Plan of each level (finished or unfinished) with dimensions:
❑ Floor Joist direction, size and spacing
o Header, beam or concrete lintel sizes
o Brace wall panel locations
❑ Water heater and furnace locations
o Exhaust fan locations
o Deck or concrete patio sizes and locations
❑ Roof Plan:
o Engineered truss direction and spacing
❑ Rafter and over frame direction, size and spacing
❑ Wall Section Detail including:
Roof
o Slope/ roofing material/ underlayment/ ice dam protection
o Sheathing size and type
Ceiling
o Joist size and spacing
Wall
o Height/ top plate/ stud size and spacing/ sole plate
o Exterior sheathing size and type
Floor
o Joist size and spacing
Foundation Wall
o Concrete or Masonry unit width
o Earth to wood separation distance
Footing
o Size
Radon
o Passive system with Emil vapor barrier
Miscellaneous Construction Details
❑ Deck:
o Floor plan/ side view/ dimensions
o Floor Joist/ decking direction, size and spacing
O Stairway tread rise & run and nosing
o Window and door location and sizes
o Window well locations if applicable
o Room usage labels
o Smoke detector locations
o Attic and crawl space access locations
o Fire Wall construction
❑ Ridge, eave and valley lines
o Beam and girder size and location
o Truss or rafter size, spacing & connection
❑ Attic insulation/ air space baffle/ ventilation
o Size of ceiling gypsum wall board
o Siding/ exterior house wrap/ anchor bolts
o Insulation, vapor barrier, gypsum wall board
o Sheathing or concrete floor size/ insulation
o Footing bottom to finished ground level depth
o Horizontal & vertical reinforcement if any
o Reinforcement if any
o Active system with 6 mil vapor barrier
o Footings/ post/ and beam size and locations
O Handrail / Guard height & spacing
Spokane
aofiValley
Project
Transmittal
City of Spokane Valley
Community Development
Department
11703 E. Sprague Ave, Suite B3
Spokane Valley, WA 99206
Phone: 509.688.0036
New projects
Previous pre -app meeting D
Plan revisions
Transmittal Date:
Thursday, August 14, 2008
Site Address• 10115 E MISSION AVE
Parcel Number: 45084.0379
Zoning: R-3
Fire District: FD 01
Water District: MODERN
Project Number: 08003161
Applicant:
e-mail:
Contact:
e-mail:
Contractor:
RED TOP CONSTRUCTION
21507 N MONROE
SPOKANE WA 99208
(509) 276-2273
RED TOP CONSTRUCTION
21507 N MONROE
SPOKANE WA 99208
(509) 276-2273
RED TOP CONSTRUCTION
21507 N MONROE
SPOKANE WA 99208
(509) 276-2273
Owner: HOLMES. STEPHEN A & PATRICIA
PO BOX 683
PORT ORCHARD. WA 98366
e-mail:
Occupant:
e-mail:
Arch / Engineer:
e-mail:
D ECER7ED
DAUG 14 Egg
Project
Description: (1) EGRESS WINDOW
Building
Landuse
Engineer
Utilities
Health
Fire Dist
Assessor
APPLICATIO
PLAN
s
Please send all plan review and project comments via e-mail to the
highlighted individuals.
Spokane
Valley®
For City Use Only
PLUS Project Number C5 1 G-11
Project Address
U \
11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206
509.688.0036 ♦ Fax: 509.688:0037.k perMitcenter@spol9nevalley.org
As part of our on-going commitment to customer service during the review process 'of !your project
application, we are providing you with a TARGET DATE for the initial, technical-application,review: If for:
any reason we cannot meet this,date, we will contact you with a revised.target date.
Your application review TARGET DATE is C7e 1° `(c)
• I.
The TARGET DATE is the date we estimate your. project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
•
Submit complete, accurate plans and documents. . .
Extra time may be required for re -submittals as project application reviewers work on multiple applications and 11
mar be several dors before tier can look at your new or revised info tradition. •
i Designate a specific contact person to communicate with the City. . - .
While the person designated as the applicant's contact person with the City con be changed• one individ:ial with the
expertise for dealing with reviewer comments world be the best choice for.the entire review process..
•
i Call staff regarding the status bf your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date. please feel free to contact us if you haven 7 heard from us
by your target elate. Staff may contact you 'before the target date if the initial review is complete. By following this,
procedure, you will save time and allow the reviewers to complete the work more espeditioasiv.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. -. This means :all of the required
documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure -that the application is reviewable and free
from substantive claws that would prevent technical staff from completing theitechnical review once it is started. When
this step is complete, your application will be.routed to the appropriate staff and remain 'in their review queue until it
comes up for review. •
3. Technical Compliance.'Once an application- is administratively complete, -it is routed to'technical'stalTfor compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone, fax, email, or mail by your.TARGET DATE once the initial technicatcomplianceteview is complete.
•
4. Permit Issuance. When the technical compliance review of the application is complete, including -any. subsequent re -
submittals, each reviewer will approve their, section of the application and route it to the Permit Center. Wheri all sections
of the application are received, a Permit Specralist'will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will, be provided by
the Permit Specialist at that time. . .
WHITE -APPLICANT PINK - BUILDING FILE
REV 9/07
ast'112.•of :the
est42l5ths of the
outh'11'2 of tract 311,
portunityy, -as per --plat
corded:4$ volume K
lats'page 20,
xcept the West 15'
thereof.
10115 E.Mission
Site Flan
By Keith Zornes 8/13/2008
S ane
Valley
EMERGENCY ESCAPE AND RESCUE
EGRESS WINDOW
*Minimum 20" wide clear opening
*Minimum 24" high clear opening
*Minimum 5.7 sq ft openable area
**5.0 sq ft minimum @ grade floor
*Top of sill maximum of 44" above finished floor
20' CLEAR ---i
MIN
MINIMUM SIZE
WINDOW FOR 20 IN.
CLEAR WIDTH
41' CLEAR
SILL HEIGHT
44' MAX
34' CLEAR --^�
OPENABLE AREA
5.7SQ FT MIN
(5.0 SQ FT MIN
GRADE FLOOR)
MINIMUM SIZE WINDOW
FOR 24 IN. CLEAR HEIGHT
24' CLEAR
MIN
FLOOR
Grade floor opening is a window or other openings located such that the sill height of
the opening is not more than 4-4" above or below the finished ground level adjacent to
the opening.
/i
i
i
i
OPENABLE
i' AREA
5.7 SQ FT MIN
x(5.0 SO FT MIN
0 GRADE
FLOOR)
\N
MINIMUM SIZE
WINDOW FOR 20 IN.
CLEAR WIDTH
41' CLEAR
SILL HEIGHT
44' MAX
34' CLEAR --^�
OPENABLE AREA
5.7SQ FT MIN
(5.0 SQ FT MIN
GRADE FLOOR)
MINIMUM SIZE WINDOW
FOR 24 IN. CLEAR HEIGHT
24' CLEAR
MIN
FLOOR
Grade floor opening is a window or other openings located such that the sill height of
the opening is not more than 4-4" above or below the finished ground level adjacent to
the opening.
WINDOW WELL
LADDER EGRESS
J'
*Minimum 36" x 36"
*Minimum 9 sq ft clear floor area
*Top of wall a maximum of 44" above
the floor of the well
*A guardrail is not required unless an
exit way adjoins the well.
*Provide drainage
DEEP WELLS
*If the top of the window well wall is more
than 44" above the floor of the well, either
a permanently fixed ladder or stair egress
is required.
*The ladder or stair may encroach a' maximum
of 6" into the required clear floor space.
WINDOW WELL
LADDER OR STAIR
REQUIRED
NET CLEAR DIMENSIONS WHEN
FULLY OPENED TO PROVIDE
9 SQUARE FEET OF OPENING
*At Least 12" in width
*Rungs not more than 18" on center
*Minimum 3" toe space
*Permanently fixed
*Non-combustible
*Shall extend to top of wall
LADDER OR STAIR PERMITTED
TO ENCROACH MAXIMUM OF
6 INCHES INTO REQUIRED
DIMENSIONS
%// \\\\ %//.
%//
////.
'/// \
\\\'/// \\ %//.\\\ %/1.\\\'/7/ \\\ M,\\\ %/1
\--EMERGENCY ESCAPE
OR RESCUE OPENING
WITH FINISHED SILL
HEIGHT BELOW
ADJACENT GRADE
\\\\ \\\'h/ Mg/ \\\\
1
1
36' MIN
36' MIN
1
*Where bars, grills, covers, screens or similar devices are installed over emergency
escape and rescue openings, they must be openable from the inside without the need
of special knowledge or special tools, and the force to open them may not be greater
than that required of the opening itself.
L,J.n ow
c.j1"h Mesta/
/ adde r
fix! -r,��.
2 X 6 Ne er anon
nX 6 Cvil
p,a3e 2af'
CEI JIM -/
tytw era._ A 7fjS# t
ty/hdow
T:'sjtiiti
4
* X 36
11
14/ii ) , .View_
7'e --,See cuz/l vre‘v
Tilts no 36"x /8" °fie/I;n q
7o 6e replaced 2=9"x ie -0`
-Cale m¢dr/ wii)doI
Conic Wad
VOITO3q2Vi (J.13 k...
SW Comer of e. 37 .1 bovse
BY:
RECEIVED BY oVL
LEY
40 ' 3 2008
PERM►T/ENTER
_Lelaf t ./san_ _....__.. -
JY 1 t .. w.tdled 0 w )
Sc.0 to % = /'
8.;e_. Ae. �or0•74s g -/3 - 08
PROVIDE DIAGRAMS AND
ENGINEERING LAYOUTS FOR
ROOF TRUSSES, BEAMS AND
FLOOR SYSTEMS PRIOR TO FRAMING
INSPECTIONS
CITY COPY
THIS BUILDING SUBJECT
TO FIELD INSPECTION:CORRECTIONS•
REVIEWED FOR CO E COMPLIANCE
SPOKANE VALLEY UILUI•.GDIVISION
-T-A-40