Loading...
2013, 11-05 Permit App: ROW-2013-0571 Move House*Wane� ,#Talley° Community Development Department Permit Center 11703 East Sprague Avenue, Suite B-3 Spokane Valley, WA 99206 Tel: (509) 688-0036 Fax: (509) 688-0037 permitcenter@spokanevallev.orq (Staff Use Only) PERMIT NUMBER: PERMIT FEED 7 RIGHT OF WAY (ROW) PERMIT APPLICATION 0 DRIVEWAY 7 VEMENT CUT (SEE BELOW) ®SIDEWALK CURB & GUTTER a OTHER 14-DLLSe Vt�yQ_�. ROAD OBSTRUCTION I NO [ YES ***TRAFFIC PLAN REQUIRED PROJECT ADDRESS:h 4-5b84- iao3 a5 — /0 ?�,q F• dirt fC v- _ START DATE: it/jayl° (W a n' ANTICIPATED COMPLETION DATE: j/(ap BUILDING OWNER NAME: Y G +4r��_-� 1 hof J ao 13�� ' ProleGt ,,r r, E NAME: ADDRESS: CITY: STATE:\ PHONE: FAX: NU CELL: CONTACT NAME: r.SV PERP.'',!' ut ' PHONE: CONTRACTOR NAME: FAX:y l �ZELL: F4 E1- it 11- 6 rerWta Lt p 6 Fcarmt �--�- MAILING ADDRESS: l 2-1litaatc-.7fh CITY:�� k,_ct_k4 e E. -73q /1/` PHONE: \- q 4/ STATE: FAX: CELL: CONTRACTOR LICENSE No.: r7 f fTS4r-b C -a. EXPIRES: -02,73A' CITY BUSINESS LICENSE NO.: ko,S m¢J342j TIER: POLICY: ✓ BOND/INSURANCE CERTIFICATE #: (PER SVMC TITLE 10 ARTICLE 2) SIGNATURE: C.4.1 t 0- e r - Aitt - Jl jyLp� DATE: ll(�� Ij�J ****MUST BE COMPLETE IF PAVEMENT CUT**** TYPE OF WORK CONDITION OF CUT TYPE OF REPAIR EXISTING ROAD CONDITION Gas Sawcut As alt Depth of Asphalt: Electric Grind/-ConcreteDepth (preapproved onl ) of Gravel: Water CATV Comm. { l/ a Sewer Other Effective October 28, 2007 Page 1 of 2 http://www.spokanevalley.org/filestorage/124/938/210/948/1496/Right_of_Way_(ROW)_Permit_App_1-11-11.doc Asphalt (width X length) Concrete (width X length) Locate Ticket #: X X X X X X X X X X DISCLAIMER The permitted verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley permit Inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner In this transaction. 4) All construction Is to be done In full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional Information may be required to be submitted and subsequently approved before this application can be processed. Signature (-kfc,ti orct 'r -- Date: lk 11 rip PLEASE FAX TO CITY OF SPOKANE VALLEY (509) 688-0037 UPON COMPLETION Effective October 28, 2007 Page 2 of 2 http://www.spokanevalley.org/filestorage/124/938/210/948/1496/Right_of Way_(ROW)_Perrnit_App_1-11-11.doc Sil®ka` e Valley Public Works Department Traffic Engineering 11707 ESprague Ave Suite 106 0 Spokane Valley. WA 99206 509,921.1000 0 Fax: 509.688.0261 0 cityhatt®spokanevattey,org TCP Review To: Paul Breithaupt Fax: Cci. Re: House Move From: Ryan Kipp - Assistant Traffic Engineer Pages: Date: 10/31/13 The traffic control plan submitted for the above referenced work has been APPROVED AS NOTED below. By: _%rn and p , PE THIS IS NOT A P RMIT Notes: Date: /°/3/70 1. The traffic control plan submitted has been approved for concept only. The contractor is responsible for determining specific signing and layout as required by the Manual on Uniform Traffic Control Devices, WSDOT specifications, and Washington State modifications to the MUTCD. All devices Shall conform to the MUTCD and WSDOT specifications. The City of Spokane Valley may request changes as warranted by traffic conditions and motorist behavior. 2. The contractor shall contact Carolbelle Branch, Public Information Officer within 24 hours of receiving this approval. The contractor must provide the location of the work; expected start and end dates, and dates and times of any road closures or delays. Carolbelle can be reached at (509) 720- 5411 or cbranch o(�spokanevallev.orq, and she will notify the newspaper, school districts, Spokane Valley police department, and fire dispatch as necessary. Information should be provided In the following format: (STREET'NAME) between (CROSS STREET NAME) and (CROSS STREET NAME) will be (DESCRIPTION OF IMPACT) from (TIME) ort (DATE) to (TIME) on (DATE) for (REASON FOR WORK). (ADDITIONAL NOTE). For more information on this project, call (CONTRACTOR NAME) at (xxx-x)ox). 3. See paperwork attached plan. Project ;!__N7- 013-097/. Rci,, N Y ;i 2U13 TN. twEPC b w oFP si.EEr P(t14 KfNC- I .V C - IroeQsecI CCSB CIL Project# 0142.2fl1�j-liso RECEIVED SE? 262013 CSV PERMIT CENTER SUB # 1 REV. # Z bm'�'W- Potter; \ant ?LAMING DEPT. (APPROVED 07Bvit-DUV GS I5' IG 0.7` 1oo.a' as' 10309 E. MIS,Stolti Project # V-:eO 9J^Ia6-0 RECEIVED SEP 31 2013 _- CgLE_EBMIT CENTER SUB # � REV. # IY\ISSI0N MUE Mary May From: Ryan Kipp Sent: Thursday, October 31, 2013 9:23 AM To: Mary May Cc: Deven Nickerson Subject: Mission House Move ' Attachments: Mission House Move.pdf Hi Mary, Paul stopped in this morning about a house move on Mission. The house is over 34' wide and 23' high, so I requested that he get a right of way use permit. I have approved the route and plan. Please see the attached pdf. Thanks, Ryan Kipp, PE, PTOE Assistant Traffic Engineer City of Spokane Valley 11707 E. Sprague Ave., Suite 106 Spokane Valley, WA Ph: (509) 720-5016 Fax: (509) 688-0261 rkipp@spokanevalley.org 1 csv P sue #