2014, 09-09 Permit: SW-14001326 SewerSPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW -14001326 Permit Issued Date: 09/09/2014
Expiration Date: 09/09/2015
Project Description: SEWER CONNECTION
Project Name: EASTON
Primary Contact: H & S CONSTRUCTION
Phone: 509-926-8964
Applicant: H & S CONSTRUCTION
Address: 11817 E VALLEYWAY
SPOKANE VALLEY, WA 99206
Phone: 509-926-8964
Email:
SITE INFORMATION:
Site Address:
Parcel Number:
10420 E MISSION AVE
45171.0421
Assessor's Description: OPPORTUNITY & BARMETTLER ADD E100FT OF
NE1/4 BLK 14 OPPOR TUNITY & W2OFT OF LT 2
BLK 2 BARMETTLER ADD (SENIOR EXEMPTION
ON 50% LAND AND BLDG REMAINING 50%
TAXABLE)
Inspection Area: : (509)-477-3675
Owner: ROBINS LIVING TRUST
Address: 10420 E MISSION AVE
SPOKANE, WA 99206-3984
Phone:
Email:
Water District: Modern Electric Water Fire District: Spokane Valley Fire
Company
Zoning: Land Area: 32000 Square Feet
CONTRACTOR INFORMATION:
HSCONCL879L5, Exp. 06/25/2015
H & S CONSTRUCTION
11817 E VALLEYWAY SPOKANE VALLEY, WA
99206
509-926-8964
DETAILS:
Class
Type
Quantity Unit Charge Value
SEWER
FEE DETAIL:
Processing - Utilities
Utilities Permit
SEWER CONNECTION 1 $125.00 $125.00
Total Fee:
$26.64
$125.00
$151.64
$125.00
CONDITIONS:
Inside Public Transit Benefit Area
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
SEWER PERMITS ARE VALID FOR ONE (1) YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES
DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT
ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES.
Date Printed 09/09/2014 11 05 10 Project Coordinator: Kathy Cummings
SPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW -14001326 Permit Issued Date: 09/09/2014
Expiration Date: 09/09/2015
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 09/09/2014 11:05:10 Project Coordinator: Kathy Cummings