2012, 08-20 Permit: SW-12002017 SewerSPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Application Number: SW -12002017
Permit Issued Date:
08/20/2012
Expiration Date:
Project Description: SEWER CONNECTION
Project Name' SO GREENACRES PH 4
Permit Type: SEWER
Primary Contact. `COURCHAINE CONSTRUCTION
Applicant: `COURCHAINE CONSTRUCTION
Address: 19818 E SPRAGUE AVE
GREENACRES, WA 99016
Phone: 509-924-5485
Email:
SITE INFORMATION:
Site Address:
Parcel Number:
Subdivision:
Assessor's Description
Inspection Area:
18505 E MISSION AVE
55074.1663
PLAT A
Owner. MAXEY, DAROLD L
Address. 18505 E MISSION AVE
GREENACRES, WA 99016-8515
Phone:
GREENACRES IRR PLAT A W95' OF 5140' OF BLK Email:
41
Water District:
Consolidated Irrigation
District #19
Zoning: Land Area: 13300 Square Feet
Fire District: Spokane Valley Fire
CONTRACTOR INFORMATION:
General Contractor
COURCC`181 R7
`COURCHAINE CONSTRUCTION
19818 E SPRAGUE AVE
GREENACRES, WA 99016
509-924-5485
pETAILS:
Class
Type
Quantity Unit Charge Value
SEWER
SEWER CONNECTION 1 $125 00 $125.00
FEE DETAIL:
Processing - Utilities
Utilities Permit
Total Fee:
$125.00
$25.94
$125.00
$150.94
CONDITIONS:
Inside Public Transit Benefit Area
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
CALL 1-800-424-5555 BEFORE YOU DIG—AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY
Date Printed' 08/20/2012 10:25 05
Printed by. IIS APPPOOLWSP.NET v4 0
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW -12002017 : 08/20/2012
Expiration Date:
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5 00 MONDAY -FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 08/20/2012 10.25.05
Pnnted by. 115 APPPOOLVISP NET v4.0