2012, 07-06 Permit: SW-12001697 SewerSPOKANE COUNTY'BUILDING AND PLANNING
PERMIT
Application Number: SW -12001697
Permit Issued Date:
07/06/2012
Expiration Date:
Project Description:
Project Name:
Permit Type:
SEWER CONNECTION
MISSION
SEWER
Primary Contact LOSS EXCAVATION LLC
Applicant: LOSS EXCAVATION LLC
Address: 603 N FELTS RD
SPOKANE VALLEY, WA 99206
Phone: 509-863-2785
Email:
SITE INFORMATION:
Site Address:
Parcel Number:
Subdivision:
Assessor's Description:
Inspection Area:
Zoning:
18513 E MISSION AVE
55074.1664
SIMPSON'S
GREENACRES IRR DIST
OF 5140' OF BLK 4 1
PLATA E100' OF W195'
Water District:
Consolidated Irrigation
District #19
Owner:
Address:
Phone:
Email:
FITZGERALD, DONALD E & BARBARA L.
18513 E MISSION AVE
GREENACRES, WA
Fire District: Spokane Valley Fire
Land Area: 14000 Square Feet
CONTRACTOR INFORMATION:
General Contractor
LOSSEEL903OS
LOSS EXCAVATION LLC
603 N FELTS RD
SPOKANE VALLEY, WA 99206
509-863-2785
DETAILS:
Class Type
Quantity Unit Charge
Value
SEWER SEWER CONNECTION
FEE DETAIL:
Processing - Utilities
Utilities Permit
1 $125.00
$125.00
Total Fee:
$125.00
$25.94
$125.00
$150.94
CONDITIONS:
Inside Public Transit Benefit Area
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
Date Printed. 07/06/2012 10:20.09
Printed by: IIS APPPOOLVASP.NET v4.0
SPOKANE COUNTY'BUILbING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW -12001697 07/06/2012
Expiration Date:
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 07/06/2012 10:20 09
Printed by: 115 APPPOOL1ASP.NET v4 0