2012, 05-31 Permit: SW-12001455 SewerSPOKANE COUNTY BUILDING AND PLANNING PERMIT Application Number. SW -12001455 Permit Issued Date: 05/31/2012 Expiration Date: 1 Project Description' SEWER CONNECTION Primary Contact: CEDAR CREEK BUILDERS INC Project Name: CRONK Applicant: CEDAR CREEK BUILDERS INC Permit Type: SEWER Address: N. 16660 RIGHT FORK RD HAUSER, ID 83854 Phone: 208-773-5776 Email: SITE INFORMATION: Site Address: Parcel Number: Subdivision: Assessor's Description Inspection Area: 18902 E MISSION AVE 55172.0901 SP -529-88 CORBIN ADD TO GREENACRES; TR A OF SP88- 529 BEING A PTN OF LT 5 BLK 1 AUDITOR #8804190204 Owner: GEARY, JAMES W Address' 18902 E MISSION AVE GREENACRES, WA 99016-9426 Phone. Email: Water District: Fire District: Fire District 1 Consolidated Irrigation District #19 Zoning: Land Area. 0.2392 acres / 10419 sqft CONTRACTOR INFORMATION: General Contractor CEDARCB980DD CEDAR CREEK BUILDERS INC N. 16660 RIGHT FORK RD HAUSER, ID 83854 208-773-5776 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION 1 $125.00 $125.00 FEE DETAIL: Processing - Utilities Utilities Permit Total Fee: 5125.00 $25.94 $125.00 $150.94 CONDITIONS: Inside Public Transit Benefit Area CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. Date Printed. 05/31/2012 1232:40 Printed by: 115 APPPOOL\ASP.NET v4 0 SPOKANE COUNTY BUILDING AND PLANNING PERMIt Permit Issued Date: Application Number: SW -12001455 05/31/2012 Expiration Date: FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed. 05/31/2012 12:32:40 Printed by: 115 APPPOOLViSP.NET v4.0