Loading...
2012, 09-27 Permit: SW-12002274 SewerSPOKANE COUNTY BUILDING AND PLANNING PERMIT Application Number: SW -12002274 Permit Issued Date: 09/27/2012 Expiration Date: Project Description SEWER CONNECTION Project Name: CRONK Permit Type: SEWER Primary Contact: NORM'S EXCAVATING INC Applicant: NORM'S EXCAVATING INC Address: PO BOX 574 VERADALE, WA 99037 Phone. 509-928-0580 Email: SITE INFORMATION: Site Address: Parcel Number: 19222 E MISSION AVE 55172 0142 Subdivision: CORBIN ADDITION Assessor's Description: CORBIN ADD TO GREENACRES N185' OF E105' OF LT2BLK1 &W 15' OF N185' OF LT 1 BLK1 Inspection Area: Water District: Consolidated Irrigation District #19 Zoning: Land Area: 22200 Square Feet Owner: UTTKE, CLAUDENE M Address: 19222 E MISSION SPOKANE VALLEY, WA 99016 Phone. Email: Fire District: Spokane Valley Fire CONTRACTOR INFORMATION: General Contractor NORMSEI972BM NORM'S EXCAVATING INC PO BOX 574 VERADALE, WA 99037 509-928-0580 DETAILS. Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION 1 $125.00 5125.00 FEE DETAIL: Processing - Utilities Utilities Permit Total Fee: $125.00 $25.94 $125.00 $150.94 CONDITIONS: Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire. Inside Public Transit Benefit Area CALL 1-800-424-5555 BEFORE YOU DIG—AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. Date Printed. 09/27/2012 08.48:39 Pnnted by: IIS APPPOOLWSP NET v4.0 SPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW -12002274 09/27/2012 Expiration Date: FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 09/27/2012 08.48.39 Printed by: IIS APPPOOLVASP.NET v4 0