Loading...
04-002.00 Spokane County 2004 Sewer Construction Program Memorandum of Understanding Between the City of Spokane Valley and Spokane County Pavement Replacement Cost Sharing for the 2004 Sewer Construction Program WHEREAS the City of Spokane Valley (the CITY) and Spokane County (the COUNTY) plan to enter into an Interlocal Agreement to facilitate the continued design and construction of the COUNTY's Sewer Program within the CITY's corporate limits; and WHEREAS the CITY desires that the roads impacted by the construction of sewers in the 2004 Sewer Construction Program be reconstructed to the full preconstruction width, or widened, for an improved roadway surface; and WHEREAS the CITY also desires that pavement replacement work be extended in some areas beyond the limits of sewer construction; and WHEREAS the cost of such full width, additional width, and additional length of road reconstruction is not funded by the COUNTY's Sewer Program, and said cost will need to be paid by the CITY; and WHEREAS the 2004 Sewer Construction Program includes the Carnahan, Sipple, Veradale, and Weatherwood/Owens Sewer Projects, as identified in the COUNTY's adopted Six-Year Sewer Capital Improvement Program 2004-2009. NOW THEREFORE, the CITY and the COUNTY do hereby agree as follows: 1. The CITY's cost and the COUNTY's cost on each of the projects shall be determined using the actual contract prices that result from the competitive bid for each project. The CITY's maximum cost for all projects shall not exceed $1,010,000 without written authorization by the CITY. The COUNTY shall not proceed with any work that would increase the CITY's cost to an amount greater than the total amount authorized. A list of the estimated CITY costs by project is shown in Table 1. The CITY and the COUNTY recognize that this estimated total cost is for planning purposes, and that the actual amount will be based upon final quantities and actual contract prices. 2. Prior to the bid of each project, the COUNTY shall provide the CITY with a set of project plans, indicating the extent of pavement removal and replacement to be paid for by the COUNTY as a part of the sewer project. The CITY shall review the plans and provide the COUNTY with a tabulation of the locations within the project boundary where the CITY would like additional pavement removal and replacement, as well as any locations where the CITY would like existing roadways to be widened. 3. If the CITY subsequently elects to make additions to the scope of the project, the CITY shall request such additional work in writing. A corresponding adjustment shall then be made to the CITY's share of the cost based upon the resulting increase in pay quantities and the associated contract bid prices. For work items requested by the CITY that are not covered by the contract bid prices, the COUNTY shall prepare a Gay~o~ / ~~ ~ 1 I, change order for the CITY's review and acceptance prior to work items being constructed. 4. During the construction of the four Sewer Projects in 2004, the COUNTY will provide monthly invoices to the CITY for the CITY'S portion of the cost of completed roadway replacement. Upon receipt of the invoices, the CITY shall provide payment to the COUNTY within 30 calendar days. SPOKANE COUNTY: County Utilities Director CITY OF SPOKANE VALLEY: By: David ercier, City Manager Date: Z 'O.~ ~ Date: ~ ~ '~~ TABLE 1 Estimated Project Cost Carnahan $110,000 'i Sipple $141,000 Verdale Phase II $284,000 Including: Burns Road $31,000 Weatherwood/Owens $394,000 Misc. Projects - $50,000 TOTAL ~ $1,010