2007, 07-13 Permit App: 07002642 Underpin FoundaitonProject Number: 07002642 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 7/13/2007 Page 1 of 2
Project Information:
Permit Use: UNDERPIN FOUNDATION AS PER DESIGN.
EXCAVATE INT & EXT FOOTINGS
Setbacks: Front
Left: Right: Rear:
Site Information:
.,. a ,x� SNt�u"b.�� t :wPh� <n x�w .�. xrc�"+✓, as'Y`3 t�'wKi.�i'dM�d�':
Plat Key: CONV Name: CONVERTED CNTY DATA
Parcel Number: 451423316 Block: Lot:
Contact: KY RY CONSTRUCTION INC
Address: 615 S OREGON AVE STE A
C - S - Z: PASCO, WA 99301
Phone: (509) 543-9705
Group Name:
Project Name:
SiteAddress: 14315 E MISSION AVE
Location:: CSV
District: East
Owner: Name: HOY, GRETCHEN E
Address: 309 N MARGUERITE RD
SPOKANE VALLEY, WA 99212
Zoning: UR -22 Urban Residential -22
Water District: 134 CONSOLIDATED ID #19 Hold: ❑
Area: .00 Acres Width: 0 Depth: 0 Right Of Way (ft): 0
Nbr of Bldgs: 1 Nbr of Dwellings: 2
Review Information:
Review
Building Plan Review
Permits:
Released By:
Originally Released: 7/12/2007 By: JLMain
Contractor: KY RY CONST & FAB INC
Address: 615 OREGON - #A
PASCO, WA 99301
Building Permit
Firm: KY RY CONST & FAB INC
Phone: (509) 536-2911
This Application: Total Project:
Description Type Notes Su Ft Valuation Sq Ft Valuation
RES ADD R-3 VB REPAIRS 0 $85,000.00 0 $85,000.00
TO
FOUNDATI
ON
Item Description
RESIDENTIAL PERMIT FEE
WSBC SURCHARGE
Totals: 0 $85,000.00 0 $85,000.00
Units Unit Desc Fee Amount
1 SELECT $888.75
1 SELECT $4.50
Permit Total Fees: $893.25
Operator: jmm Printed By: jmm Print Date: 7/13/2007
Project Number: 07002642 Inv: 1
Notes:
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 7/13/2007 Page 2 of 2
Payment Summary:
Permit Type
Building Permit
Fee Amount
$893.25
Invoice Amount
$893.25
Amount Paid Amount Owing
$0.00 $893.25
$893.25 $893.25 $0.00 $893.25
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or Local laws or ordinances.
Signature:
Operator: jmm Printed By: jmm Print Date: 7/13/2007
Project Number: 07002642 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 7/10/2007 Page 1 of 2
Project Information:
Permit Use: UNDERPIN FOUNDATION AS PER DESIGN.
EXCAVATE INT & EXT FOOTINGS
Setbacks: Front
Left: Right: Rear:
Site Information:
Plat Key: CONV Name: CONVERTED CNTY DATA
Parcel Number: 45142.3316 Block:
Contact: KY RY CONSTRUCTION INC
Address: 615 S OREGON AVE STE A
C - S - Z: PASCO, WA 99301
Phone: (509) 543-9705
Group Name:
Project Name:
Lot:
District: East
SiteAddress: 14315 E MISSION AVE Owner: Name: HOY, GRETCHEN E
Address: 309 N MARGUERITE RD
SPOKANE VALLEY, WA 99212
Location:: CSV
Zoning: UR -22 Urban Residential -22
Water District: 134 CONSOLIDATED ID #19
Hold: ❑
Area: .00 Acres Width: 0 Depth: 0 Right Of Way (ft): 0
Nbr of Bldgs: 1 Nbr of Dwellings: 2
Review Information:
Review
Building Plan Review
Permits:
Contractor: KY RY CONST & FAB INC
Address: 615 OREGON - #A
PASCO, WA 99301
Released By: 'M''
Building Permit
Firm: KY RY CONST & FAB INC
Phone: (509) 536-2911
This Application: Total Project:
Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation
RES ADD R-3 VB REPAIRS 1,680 $153,484.80 1,680 $153,484.80
TO
FOUNDATI
ON
Item Description
RESIDENTIAL PERMIT FEE
Totals: 1,680 $153,484.80 1,680 $153,484.80
Units Unit Desc Fee Amount
1 SELECT $1,296.15
Permit Total Fees: $1,296.15
Operator: jmm Printed By: jmm Print Date: 7/10/2007
Simane
jValley.
Permit Center
11703 E Sprague Ave, Suite
Spokane Valley, WA 9920
(509)688-0036 FAX: (509)
www.snokanevalley.org
Community Development
Multi -Family
Construction
Permit Application
I_.
685-9037
ERMIT NUMBER:
I,
7 i'ERMIT FEE:
(1/11\--,, (('
❑ New Construction ❑ Addition/Remodel
E Other: r e p t t` r S
SITE ADDRESS: A7_37/ j /V3/6-
7 3/(j /� ` 5 / "55/.1")/ 4L -
ASSESSORS PARCEL NO: 1-/C Y Z S • 3 3 / LEGAL DESCRIPTION: 5-e e (7,1-/-4 eft ed
Building Owner: Gc' E // Po,
Name: C r /-F -Proper
Address: /.3-2,/ 4( f/ C G 22_0
City: s -p c`,K //4, I.
y State: `0, Zip: gcrZ./z
Phone: sr yeti 2(�f//Fax.57)e y632 -
Occupant o ructure
Name:
Phone:
Contact Person
Name:
/v/d
Contractor:6) ,«<� it
Name: ",..'741 e(,/ ; / m es
Address: 6,/J •2'-4 /got'. Su./ 4
State: /t) ,) Zip:gyp/
City:
c t�
Phone:SZ,cj- f3 _<7703 ---Fax: U> - -/3- 4/7/.5
cd/; y� K
City Business Lic. No: 4 e (3A4/ eQ' A
Contractor Lic No:E pDate.
�E'Ytt�y[Fl"gy,cci
Phone:
Cost of Project: $ gi-S;C'C''e
Describe the scope of work in detail: /
1C -q(4, ,�2 cu��i>;-� �s pe< Ch's,/, IS/ 4 /� .ALL
'iYlp.ri^.e [�lvt,c in��r/ce- `r ��c. -ter/v7 cc jS
F
Type of Construction: /2 c /4 k cupancy: bi /� Total Building Sq Ft: :At l Prt ��ge
7 Z
Architect /2/i�.rre+ 7 T
Company Name: /4sc 'nc! 3%nom-k� /t<
Architect Name: 5.4 1, �!! PF
Address: Pc g 7
City: S'
State: /11A Zip:e? 2z'
Phone: e-4�-3037 Fax: 5-_-3aS�
No. of Stories: No. of Units: Deck: ,jl Carpo Gara :
Heat Source:-/ 4' _ Fire Sprinklers:
The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or
local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before
this application can be proce sed.
Signature ` ` �y Date
.9
Method of Payment:
0 Cash
Bankcard #:
❑ Check
2 o 7
❑ Mastercard 0 VISA
Expires: VIN#:
Authorized Signature:
REVISED 8/25/2005
4-6)
Cit/0/ 5 aS
tAffzc� 1-e) 4 /4‘c,�,�CCl/ rl iSe n ��'
5 2� � L�c�� [` )4"-"--44:-/ e l nit
C. T"; i �j C F T S l e n !c` C e r r`- 7/ r e eZ S (c, 4 5 ,X -v----47
(c -z s -f - L -c S • 14' cI
, t7 it -110/ lt7t7 / 1 L: 4,i 5F�y5 i17�75
HOY Environmcntsl,1no.
ho env ' sn. com
MUY tryV1KUNMCm i HL
Fax Cover for
From.: Dr. Gretchen Hoy
Date: 3(3E:40-.7
No. of pages (incl cover): 3
HOY Environmental
Help Ordered Yesterday
1521 N. Argonne Rd
Suite #C220
Spokane Valley, WA 99212-2555
Tel (509) 892-6181
Fax (509 532-9595
To: 6,1y
Company:
Fax Number: 5 bq -54
SC -
1s T)\€
--�,-r \'s,\) x..t. kAc_ / j2,4 j 01.)
W I w L -00K-- F 6 P
173/31J/2k9b/ 12:43 5b35,.12yi' b Verr.n
174£JE F+1 T 3CNTS , r Vorwr
ai and
awn , Mand WA/r nowt•l' r ., a
Moor ger YAW Mo or 'Mr 5 trfr afia=osmm
� � � `wrm/rrrf r rMIMm■+
tiw.an fs i
.fa , A.l� t:0, in ..err y IrMw,r+.t*a-
f
,CJr vr�cry �oaer�, rowspoled
orm
0/••••0/4 s1 r . /1 lot Placed art .,,y am
ti—orf6r Orthgr a106imrarloI' fir 1#•. p•AMr or
4ti or haerlitiol widow ro dorm «1!a, s r+iyoif.
,mr*s.of 1f Ptar war-,oadrwiMr.T err- sliim
rflnrr a s apprssuI by arm* and -SWAP ohlipeith
1 f7rr .Y.tm.Kt, aro/ frit motor ..TioopIoor fpwrmyr.ir)
tins .art ^4n#, and for .snort r'- moll
41 .r rr•'ar to t,h ire prow 1. .r omit /et.
Eck or S6 ' ,.t , r d Or Traci a j wilmilart
9rerM/ —yon r m molar le Whim Mr •
mm�r� •Abwn fir trod endslnsMr
77t war/ .offer 3rstornr artbpreliokohni
7� -07/ Sh1df tomato and f? .!taint aw rre-
t Ohm* a "whim- avow- .rystswr ,s mads
?Ars pinpurt-y.
.n tin tori ti sIMAn And Jihad/
ii ' mor hwthinlr !rI ado. -
Mir JIM/ 16/i,12T. eiraM M,d_,r".19
AMC.
Wo
•
1
1
1
1
C DA TA
Vrctoirnf
•
i •
;
1
Lx
w
js
4 • 12•14",111-
a • .11.7.3-.00
id
di atar- lei mr
Av.
HUY LNV1F<UNMI_N I AL uc
STAT C OF WASti rwo r med )
CO OIT� S ANK
�•.7/2l /.a mmrd o Dyr+►n
O • wl � ticJn C. trarrr�
husbassi Md muff , amid f`v..Snrrp ono/ Ad. Mier ✓r
tr tt r4nd, Sly.
Mown >r ar �,ayrmt aramt vowsp•w*�'I tier sr AO:m..ral r tutor' Her Arm •f yllsts
tool Okiester K. Paissw• AP OS 4110vms* Mow
10, tm.or ow wr
Woo C�' as tyb ,rwiaorshoas
foorosoosoi Itar dii~ end 'Moir, tnirtrworowrt and co-Moto+�
• f, Igo Ohm— Ile an wolootory or/ awed shod r.r frit user woo
TW 1110111rArST Perrier O', S rom hr•wMh► set nny noon' O'
o/'ffintof .w, .11Tt./ sial -trim day wed /r First od»+•o rr►f
my asompi„ m ,wrprw
MAME YON' '5 COPTIFCATF
Thar ns eerie'/r r.r..sar.ts • Jiro'.."' ~iv by nor
mo alimir my dr.ctarr m Car+A++r ono. myth !tar Svr+ry
Act et that r overt sr Knew Same one/
fri.r, canon how been sept .r*d twmEd1 L. S Number
0
�ssr
LESENI:)
.fid. r.50
• • ,Sof //i- I110+r �yW Alayr�tre Gip Tt7�i
The bwr...f s s! N E oar A fom/f.
Altman Amor., ow per Most mow Add►f.
ai tris dear a .111.11PW
COLWTY UT*
7 ..door
AND A
ars, 46
19
T1`
lay
"Cr
. ti?..
`,
/
/ /:
k? rteoatiorr/cw TO VcR
•
Thi drslydh it l aul�ted. •
o1 an kUUl•lto& his oloichis.
Memo" woods orozoilivorft
the - ti WWI,
vimo..^....._.4.--
NF_/Goy
1
i
JP ff
/6
tway by Hint Newsom Two
11#114011b1. aUSIA.Ingurenoe �'.ca hand r NOT w pat of enjr we oomrnluennt
d A. b p M
M. end does net purporb t show r
shouldtailince be fad upon Mils &Weft bribe location or dlmondone d
• "?+otfoefenss Minot
AOR away
rte`
▪ 1
03/30/2007 12:4:1 5095329595 HUY LNV1HUNMLNIAL
form No. 1402.92 (10/17/92)
ALTA O Nflel'S POKY
SCHEDULE A
Date of Policy; March 24, 2006 at 9:12 a.m.
Policy Amount: $159,950.00
1. Name of insured:
GEH Properties, LLC, a Washington Limited Liability Company
2. The estate or interest in.thejand. which'scovered by this policy is:
Fee Simple
3. Title to the estate or interest in the land is vested in:
GEH Properties, LLC, a Washington Limited Liability Company
4, The land referred to in this policy is described as follows:
Real property in the County of Spokane, State of Washington, described as follows:
TRACT "A", SHORT LATT 78-071, ACCORDIANSG TO PLAT RECORDED IN VOLUME 1 OF SHORT
PLATS, PAGE 55, IN SPOKANE
AND, THAT PORTION OF TRACT "B", SHORT PLAT 78-071, ACCORDING TO PLAT RECORDED IN
VOLUME 1 OF SHORT PLATS, PAGE 55, IN SPOKANE COUNTY, WASHINGTON, DESCRIBED AS
FOLLOWS:
BEGIN AT THE SOUTHWEST CORNER OF SAID TRACT 8; THENCE NORTH 19°49'S2" EAST, A
DISTANCE OF 96.31 FEET TO THE NORTHWEST CORNER OF SAID TRACT B; THENCE SOUTH
75057'14" EAST ALONG THE NORTHERLY LINE OF SAID TRACT B, A DISTANCE OF 32.00 FEET;
THENCE SOUTH 37°34'06" WEST, A DISTANCE OF 104.50 FEET TO THE POINT OF BEGINNING.
pplky No.: 4251-M0516
Page
Policy No.; 4251-780516
Premium: $565.00
APN: 45142.3316
615 South Oregon, Suite A
Pasco, WA 99301
509/543-9705 Fax 509/543-9715
WA. # KYRYCFI023C4 OR. CCB # 122495
Gretchen Hoy
GEH Properties, LLC
1521 N. Argonne #C220
Spokane Valley, WA 99212
Re: 14315 & 14317 East Mission Ave. Spokane Valley
Dear Gretchen,
Your challenge
our specialty
October 6, 2007
Attached to this report is the Installation Record for the micropiles to underpin this
structure. As you are aware, several obstacles were encountered during the work on this
project. Since we lost drill flush consistently at 12 to 15 feet below the footing, I
discussed with Paul Nelson as to whether this was the line between fill and native soils.
Paul concurred that that would indicate such and so we drilled the additional footage to
get the minimum of 10 foot of bond zone. The substantial increase of grout volume is
typical for the fill area since we had large boulders which create voids that the grout
filled.
We first drilled a 3-1/2" diameter hole 10' depth, drove the 3" galvanized pipe to 10' and
then drilled the 3" diameter micropile through the pipe to depth. Bond grout was pumped
through the Titan bar and filled the hole from the bottom up. A 3' piece of 1-1/4" pipe
was placed over the Titan bar and then the AB Chance underpinning bracket was
installed to the foundation.
During the lifting process, the footing separated from the stemwall and as per Ascend
Structural Design, LLC repair plan, we placed grout to fill the voids. 12 bags of grout
slurry was required to do this.
At the NW corner of west unit, we had 3-3/8" of settlement. We lifted structure to level
across the second level. In the east unit we had 2-1/4" of settlement and lifted unit to
level. During the lifting process, the south building line actually lowered as we lifted the
north line. The effort to pull the north wall back to plumb was not completely successful.
The west unit is 1-3/16" out of plumb and the east is 1/4" out of plumb.
As you are well aware of, water must be kept away from the foundation to avoid future
movement. This completes our work on this project. Please call should you have
questions about this report.
Sincerely,
Michael Grimes, President
Gretchen Hoy
Additional Costs
Micropile Bid Drilled Additional
1 20 27 7
2 20 27 7
3 20 27 7
4 20 27 7
5 20 27 7
6 20 27 7
7 20 27 7
8 20 27 7
9 20 27 7
10 20 27 7
11 20 27 7
12 20 27 7
13 20 27 7
14 20 27 7
15 20 27 7
Total 105
105x$75.00=$7875.00
Vertical Steel Plates
3x$280.00=$840.00
Manta Ray Installation $2550.00
Total Extras $11,265.00
Ky Ry Construction, Inc.
dba: Earth Anchors of Eastern Washington
Earth Anchor Foundation
Installation Record For Micropiles
Client Name:
Address:
Structure Type:
Gretchen Hoy, GEH Properties, LLC
1521 N. Argonne #C220
Spokane Valley, WA 99212
Wood frame duplex, 2 storey
Page_1_of 1_
PH: 509-543-9705
Fax: 509-543-9715
Job No. Hoy -1
Date: August & September 2007
Materials:Titan 30 bar
Micropile Installation
Cu ft
Cu ft
Percent
Remarks
Pile
No.
Drilled
Depth
Length
of steel
Grout Vol
Calc.
Grout Vol
Actual
Grout Vol
Difference
1
27'
30
3
13
4.33
Drilling flush was lost consistently at 12 to 15 ft depth
below bottom of footing on all holes
2
27
30
3
20
6.67
This is indicator of the level of where fill was placed.
3
27
30
3
13
4.33
4
27
30
3
12
4.00
5
27
30
3
10
3.33
6
27
30
3
13
4.33
7
27
30
3
10
3.33
8
27
30
3
22
7.33
n
9
27
30
3
22
7.33
,,
10
27
30
3
12
4.00
11
27
30
3
12
4.00
12
27
30
3
13
4.33
13
27
30
3
12
4.00
14
27
30
3
10
3.33
15
27
30
3
10
3.33
Washington Association of Building Officials
P. O. Box 7310, Olympia WA 98507
888-664-9515 4 wwv.wabo.org
Certified Welder Card
MICHAEL D. GRIMES
3619 S BENTON PL
KENNEWICK WA 99337-5151
Welder ID Number En JU 1 008
W01904 Renew on or before expiration date
The welder named on this carts is certified for the following:
WABO welder certified process qualifications are outlined in WABO
Standard 27-13 & in accordance with ANSI/AWS 01.1, D1.3, 01.4
THIS CARD IS THE PROPERTY OF WABO
Ascend
Structural
Design, u.,c
December 19, 2007
Mike Grimes
Earth Anchors of Eastern Washington
615 S. Oregon, Ste A
Pasco, WA 99302
P.O. Box 18722
Spokane, WA 99228
509.465.3037 - office
509.465.3038 - fax
Re: Gretchen Hoy Duplex, Spokane Valley, WA
Hello Mike:
After review of the site photos you provided, it appears that the installation of the plates and foundation bracket
system conforms with the construction documents.
Please feel free to call with any questions or concerns.
Sincerely,
Ryan W. Barrett, PE
Principal Engineer
EXPIRES 6-04-02'
/2./1.07