Loading...
HomeMy WebLinkAbout2009, 06-18 Permit App: 09001779 Residence' Project Number: 09001779 Inv: / Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 6/18/2009 Page 1 of 3 Project Information: Permit Use: NEW SFR -SEWER Contact: VIKING CONSTRUCTION INC Address: 2605 W HAYDEN AVE C - S - Z: HAYDEN, ID 83835 Setbacks: Front Left: Right: Rear: Phone: (208) 762-9106 Group Name: Site Information: Project Name: Plat Key: Name: Range District: East Parcel Number: 55191.3107 Block: Lot: SiteAddress: 622 S MOEN ST Owner: Name: VIKING CONSTRUCTION DBA VI Address: 2605 W HAYDEN AVE Location:: CSV HAYDEN, ID 83835 Zoning: R-3 SF Res District Water District: 134 CONSOLIDATED ID #19 Hold: ❑ Area: 9,031 Sq Ft Nbr of Bldgs: 0 Width: 0 Nbr of Dwellings: 0 Depth: 0 Right Of Way (ft): 0 Review Information: Review Building Plan Review Released By: Driveway/Approach Originally Released: 6/18/2009 By: tmelbourn Released By: Originally Released: 6/18/2009 By: WMCGAV Landuse/Zoning/H E Conditions Released By: Sewer Review Originally Released: 6/17/2009 By: kkendall Released By: Permits: T--.........".45.^.•".•-"-•""1" , Operator: jmm Printed By: jmm Print Date: 6/18/2009 Project Number: 09001779 Inv: 1 Application Date: 6/18/2009 Page 2 of 3 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Contractor: VIKING CONSTRUCTION Address: 2605 W HAYDEN AVE HAYDEN, ID 83835 Item Description APPROACH -CONST IN ROW Contractor: VIKING CONSTRUCTION Address: 2605 W HAYDEN AVE HAYDEN, ID 83835 Description Grp It Notes 1&2 FAMILY R-3 VB 2ND FLOOR R-3 VB GARAGE U-1 VB Item Description RESIDENTIAL PERMIT FEE WSBCC SURCHARGE SF PLNS RVW < 7999 SQ FT Contractor: AIR DESIGN INC Address: 1807 E FRANCIS AVE SPOKANE, WA 99207 Approach Firm: VIKING CONSTRUCTION Phone: (208) 762-9106 Units Unit Desc 1 NUMBER OF Permit Total Fees: Building Permit Fee Amount $50.00 $50.00 Firm: VIKING CONSTRUCTION Phone: (208) 762-9106 This Application: Total Project: Sq Ft Valuation Sq Ft Valuation 1,160 $112,322.80 1,160 $112,322.80 1,614 $120,533.52 1,614 $120,533.52 442 $8,398.00 442 $8,398.00 Totals: 3,216 $241,254.32 3,216 $241,254.32 Units Unit Desc 1 SELECT 1 SELECT 1 SELECT Permit Total Fees: Mechanical Permit Fee Amount $1,788.95 $4.50 $715.58 $2,509.03 Firm: AIR DESIGN INC Phone: (509) 487-4328 Plumbing Permit Contractor: THOMAS PLUMBING & HEATING Item Description TOILETS/BIDETS DISH WASHERS GARBAGE DISPOSAL CLOTHES WASHER MISCELLANEOUS FIXTURES Units 2 1 1 1 2 Operator: jmm Printed 13y: jmm Firm: Phone: Unit Desc. NUMBER OF NUMBER OF NUMBER OF NUMBER OF NUMBER OF Permit Total Fees: Print Date: Fee Amount $12.00 $6.00 $6.00 $6.00 $12.00 $42.00 6/18/2009 Project Number: 09007779 Inv: 1 Application Date: 6/18/2009 Page 3 of 3 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Notes: Payment Summary: , Permit Type Approach Building Permit Plumbing Permit Fee Amount $50.00 $2,509.03 $42.00 Invoice Amount $50.00 $2,509.03 $42.00 $2,601.03 $2,601.03 Amount Paid $0.00 $702.14 $0.00 Amount Owing $50.00 $1,806.89 $42.00 $702.14 $1,898.89 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: _ Operator: jmm Printed By: jmm Print Date: 6/18/2009 Permit Center 992RECEIVED BY ln"" 11703 E sprigi $ p�A 1E VALLEY ���� Spokane Valley, WA 06 0000 \falleye (509)688-0036 FAxj o;9)$8s o0^"?79. wwwspokaneval ley ore Community Development PERMIT CENTER Residential Constructioruy: ��onstrllction Joka els Q PERMIT NUMBER: /-1`/1j PERMIT FEE: Permit Application Additioit/Remodel Other: Accessory Bldg Deck SITE ADDRESS: Lon- Mb -es) S� U--)11 I I j� ASSESSORS PARCEL NO: 5 c) l"/1 . "2)10-1 LEGAL DESCRIPTION: - 1 (3' Y 1' ura. I��-- Building Owner: Contractor: Name:\Ill, U11 tI „(iAm 11�' 1^n Nanie: VI Address`:: apil \ Address: . el (33. li W w '1 It'1C_ USItaWte: y City: "1, J) Zip:8 3cS l City: State: Zip: Phone: l�,_Ql•n l -/q i � Fax ^rloh, . g55—i ( 11 / Phone: Fax: 30% SLOPES ON PROPERTY: N A- Contractor L` ,1t.it,je l6'tpj'i3lii Exp Date: Contact Person HEAT SOURCE: ' (-kS rei Zak"? A 1.2_ City Business Lic. No: p� Name: , )1(3I'n1A'1Tail 1 Phone : �.1 - ILg.—_\l i��? Describe the scope -of work in detail: Cost of Project: $ anaytt("6 q r n ual atriskteL Qo.fQ cy Proposed Use: 8V4 *The following MUST be corn tete: (write N/A if not.ap)tlicable)********************** HEIGHT TO PEAK27l�p DIMENSIONS: 0X44 #OF"STORIES. Z TOTAL,AZ ABLE SPACE: MAIN FLOOR TO SQ. FTG. I (LoU Oct 2"" FLOOR SQ. FTG: 14r9 UNFIN BASEMENT SQ. FTG: PJ , IMPERVIOUS SURFACE AREA: 25-32-- FINISHED BASEMENT SQ. FTG: N A- GARAGE SQ. FTQ: opt 4 Z DECK/COV. PATIO SQ. FTG: IQ At— 30% SLOPES ON PROPERTY: N A- # OF BEDROOMS: 3 CONSTRUCTION TYPE: HEAT SOURCE: ' (-kS rei Zak"? A 1.2_ SEWER OR SEPTIC? .S T.,/ 64-e_ The permitee verifies, acknowledges and agrees by their signature that 1) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before this application can be processed. " SIGNATURE: ACA r }t ) j 1 DATE: 1()--1 1)9 Method of Payment: ❑ Cash Bankcard #: Authorized Signature: REVISED 2115/07 Check ❑ Mastercard . ❑ VISA Expires: VIN#:- • Permit Center Ir .,,� 11703 E Spi ague .Ave, Suite T . Spnn Zicane Spokane Valley, WA 99205 Val le' (509)6E8-0036 FAX: (s09,F�,F —77 `CEj "VW'5nOi:uncvallcv r.� Cummuntly Devclopmcnl Plumbing Permit Application SITE ADDRESS: rn L. mere Costmercial PERMITNUMBER: PERMIT PEE: Residential • Building Owner . Nalnc:Pax \'l/Ll't}.. Phone r6. -'o 71.;1 SiG(: ,first!. 71„1-CI1()'-) Address: r� r' CiN;. ( 7�xiJl ).J. ,'V r6.. t(��ii:�l L111L.. �ri 4-��.1�.P1 Slate �1Zip(1*".=1�:) Contra dor ' Name: IA' \ n Q� C iro_ �; I at-, 7 �-1 .C.n F.tx. AJdicss. I Stade Zip. LmT, 1 Q e6.. cnse Nn-fM hbQ Y\4- ``,3 3 r ;.y Rus„.:r.. ConlneI - Name. Phone. DESCRIPTION OF WORK 5 OF UNITS X COST = TOTAL AMOUNT 1 TOILETS /.:'. E;;: L0Se,,::I0E-.i X $6.00 = 2 URINALS X $6 00 3 TUBS X $6 00 4 SHOWERS (PER TRAP) BATH. STALL, ON -°•ITE BUILT - X $6,00 5 - SINKS LAVS/BA=INS_ OAR, P.GOR, KI7-2�w; ' LAUNDRY. UTILITY. JAPTOR, Pi' ,6.O. X-RAY, FOC :✓FP/CULINARY MEAT X $6.00 = 6 DISHWASHER X $6.00 = 7 CLOTHES WASHER t X $6.00 = 6 GARBAGE DISPOSAL X 56.00 = 9 WATER SOFTENER X 56 00 = 10 ELECTRIC HOT WATER TANK NG1 E: IF G/ 9, '-. • .i"HANI'„?c X 56 00 = 11 FLOOR DRAINS ARE'., ^,:.E,9,' ::II, 14EN:11 X 56.00 12 ROOF DRAINS/OVERFLOW DRAINS X 56.00 13 FOUNTAINS, DRINKING X $6.00 14 WATER PIPING/DRAIN-IN WASTE. VENT, PLUMBING, REVERSAL • NSTAIJ /.J IUii ALTERATION. REPAIR, REVERSALS X $6 00 = 15 SEWAGE EJECTOR GRINDER, SUMP PUMP X 5600 = 16 WATER USING DEVICE ICE AN/GR 7.0:-: SE MAKER. HC SE 019, - :1EF .•ROUFE_ CARD/ NA 70R. SWAMI) Cnn; 70 .. X $6.00 = 17 CROSS CONNECTION DEVICE VACUUM 0:';;A-'..=. ECK VAL.'E . AND R.RO.P.D. FOR: BATS, TANbS, BOILERS X 56.00 = 16 INTERCEPTORS GREASE TRAP, SAND TRAP, CHEMICAL HOLDING TANK X 56 00 = 19 MEDICAL GAS (per outlet) NITROuS, OXYGEN X 56.00 = 20 MISCEI LANEDUS PLUMBING FIXTURE X 5600 = 21 PRIVATE SEWAGE DISPOSAUSYS X 520 00 22 INDUSTRIAL WASTE INTERCEPTOR X 515.00 = METHOD OF PAYMENT: SUBTOTAL UCASH 0 CHECK ❑ VISA 0 MC E'PIi _,: PROCESSING FEE $35.00 Card# '.11` TOTAL PERMIT FEE DUE: AUTHORIZED SIGNATURE: REVISED 106/05 Permit Center bnnok„� ne 1 1703E Sprague Ave, Stine0-3? t --e' 7 Spokane Valley, WA 99206 sVa Lr., -J • (5090685-0036 FAX: (509)685-0037 Coinmunily Development ""'v spol:anevaller nr� IViechanical Permit Application n Commei-cial SITE ADDRESS: (flea- J. MISC-C\ 'PERMIT NUMBER: PERMIT FEE: Residential Building Owner Name: I v 1r Phone: / r ,, Fax- air, .�lr,a tll Ar i( rC,.-1 it,i'U Gilt' L • Stale. ari� litI [IL). i" :. 7 . -IP:b�r•,-lJ 'LIP: Address' t ILL0h i�1, j ,-,',cio;, Contra elm Name: Do lis 1 Phone: A31 ���1 _yam Fax: Address Otic Stale License No evict*.utp, (' J City Rosiness Lm' Contact Name: Phone' DESCRIPTION OF WORK 1 FUEL BURNING APPLIANCE • Eo -:I • -;.'n than 100,000 # OF UNITS 2 FUEL BURNING APPLIANCE More than 1 00,000 3 UNLISTED APPLIANCE (Additional Fee) Equal to c• !erg than 400,000 4 UNLISTED APPLIANCE (Additional Fee) More than 400.000 5 USED APPLIANCE (WSEC min AFUE rating) Equal to or less than 400,000 6. USED APPLIANCE (WSEC min. AFUE rating) More Ihan 400,000 1- 100M BTU 7 BOILER/REFRIGERATION X COST $12.00 $15.00 $50.00 $100 00 550.00 5100 00 TOTAL AMOUNT • X 512 00 8 BOILER/REFRIGERATION 101 - 500M BTU X $20 00 9 BOILER/REFRIGERATION 10 BOILER/REFRIGERATION 11 BOILER/REFRIGERATION 12 GAS LOG, GAS INSERT, GAS FIREPLACE 13 RANGE 501 - 1,00DM BTU 'L01 - 1,750M BTU . ^,o,- than 1,75uid BTU 14 DRYER $25.00 535.00 560.00 $10.00 $10.00 $10.00 15 FUEL BURNING WATER HEATER 510.00 16 MISC. FUEL BURNING APPLIANCE 510.00 17 GAS PIPING (each outlet) 10 DUCT SYSTEMS X X: $1.00 19 VENTILATING FANS 20 AIR HANDLER (DOES NOT include ducting) 21 AIR HANDLER (DOES NOT include ducting) 22 EVAPORATIVE COOLERS 23 TYPE I HOOD X Equal to Of less than 10,000 CFM '3reatr'w=.n 11000 CFM X X x $10.00 $10.00 512.00 X 515.00 510.00 550.00 24 TYPE II HOOD X 510 00 25 HEAT PUMP/AIR CONDITIONER 0-3 TCN X 512.00 26 AIR CONDITIONER 4-15 TON X $20.00 27 AIR CONDITIONER 15-30 TON X 525 00 28 AIR CONDITIONER 30-50 TOIJ • X $35.00 20 AIR CONDITIONER More than 50 TON x 30 LPG STORAGE TAIJI( 31 WOOD OR PELLET STOVE/INSERT 32 WOOD STOVE - FREE STANDING 33 REPAIR 8. ADDITIONS 34 VENTILATION SYSTEMS x $00.00 510.00 $1000 35 VENTILATION MECHANICAL EXHAUST 36 INCINERATOR - RESIDENCE 37 INCINERATOR -COMMERCIAL METHOD OF PAYMENT: ❑CASH ❑ CHECK 0 VISA 0 MC CARD: AUTHORIZED SIGNATURE: REVISED 6126/05 EY,PIP,ES: 'JIN. -X x x X X X UBTOTA $?5 00 515.00 512.00 512.00 519.00 522.00 S PROCESSING FEE TOTAL PERMIT FEE DUE: L 535.00 tee.:..:. nrr f � ii2 Valley. Community Development Permit Center 11703 E Sprague Ave, Siiite 8-3 Spokane VaIIev, .VA 99206 ' (509)688-0036 FAX: (509)688-003' www.spokaneva l lev, nn+ Approach Permit Applicat>_ori PERMIT NUMBER:9 -1715 PERMIT FEE: PROJECT ADDRESS 1-c 5 S . \1'\(j-\ %i - START DATE ANTICIPATED COMPLETION DATE Building Owner: Contractor: Name: V `, Lu1 Y A Name. I t , Address: ',\1n i1 t'�\ X1/1• 1!'1da\ : ht t, Address: City:' �,:, I L' k,, 0.,,nState: _i l 11 Zrp:.}'.Th City: State: Zip: phone: 21 :G...11 i 7 -CO CIL' Pa:.)(,F, --)l ,,) • L I C i31 Phone: Fax: Contact Pelson �N'� Contractor LicV 7i9'1{. :i't9 6, �.{\`Exp Date: % Name: City Business Lie: No: - Phone: ' PROJECT DESCRIPTION (Provide site sk.: rch) Residential Driveway Existing Curb & Gutter Culvert Installation Other Conditions • Commercial/Inditstrial Driveway Rural Road Section Sidewalk Repair/Construction Bond/insurance certification must be on file with lir •.::v, DISCLAIMER The permittee verifies, acknowledges and agrees by their signatures that: 1) If rhis permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) ( )wnersl•',i, of this City Of Spok:ane'Palle}% Permit inure to the property owner. 3) The signatory is the property owner or has permission ol ep:fss nt th•- property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development r',:d. Refer._.,: j codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit 01 approva! for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional infonnarina SITS he re•,cned to be submitted, and subsequently approved before this application can be processed. Signature Llaerbod of Payment: ❑ Cash ❑ Check: Banlccard #: ' Authorized Signature: REVISED 1ISID6 Date 9 hvasrercard 9 VISA Expires: VIN#: Spokane Valley® • For City Use Only 7 PLUS Project Number ..7)-/ 77 9 Project Address (D77_ S lI' /fled," 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206 509.688.0036 ♦ Fax: 509.688.0037,4 permitcenter@spokanevalley.org, As part of our on-going commitment to customer service during the, review process -of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date: - CC(off5/A-51 Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will :have had •its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may he several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual ,with the expertise for dealing with reviewer comments would be the best choice for the entire review process. Call staff regarding the status of your project only after the target date shown at the top of the page. Although von should be contacted on or by the target date, please feel free to contact us von haven '1 heard frotn us by your target date. Staff may contact you before the target date if the initial review is complete. By following, this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required' documents, as indicated on your Pre -Application Checklist have been submitted or have been approved • for deferred submittal. This does not prevent technical staff from requesting additional infonnation as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in. their, review queue until it coines up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project,, technical staff may include multiple reviewers: Youshouldbe contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any. subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE -APPLICANT PINK -BUILDING FILE REV9/07 Spokane Valley Development Engineering 11707 E Sprague Ave Suite 106 0 Spokane Valley WA 99206 509.921.1000 0 Fax: 509.921.1008 0 cityhall®spokanevalley.org Approach Permit Application Review TO: Building Department Site Address: 622 S. Moen St. Project No: 9-1779 Reviewed By: Date: 4//7A, Accepted Not Accepted Approach X Building Location Paved Access Notes: Saw cutting of existing curb is not allowed within the City's jurisdiction. Driveway is to be inspected by the City's ROW Inspector prior to concrete placement. Reviewed By: Date: 4//7A, . VIKING CONSTRUCTION INC. 2605 W. Hayden Avenue Hayden, Idaho 83835 Vendor CITY OF SPOKANE VALLEY Check 43616 Date siisisgq9 Invoice 3080 BP jlnvoice Date • Job " k' rjt Description T, 1;.: 6/18/2009 3080 070100 Prasada Place 622 S MOEN to %�'+Invc Amount ; Discounts^"Net Pay 1,898.89 0.00 $1,898 89 '137SAFEGUARD. LITHO USA SFSL4 5105051111 • TO REORDER, CALL YOUR LOCAL SAFEGUARD DISTRIBUTOR AT 50¢5348001 MO25E008618 Spokan� jUalley Site Address: 622 S MOEN ST Parcel Number: 55191.3107 Zoning: R-3 Fire District: FD 01 Project Transmittal City of Spokane Valley Community Development Department 11703 E. Sprague Ave, Suite B3 Spokane Valley, WA 99206 Phone: 509.688.0036 New project J Pretaious pre -app meeting ❑ Plan revisions Transmittal Date: Wednesday, June 17, 2009 Project Number: Water District: CONSOLIDATED ID #19 09001779 Applicant: e-mail: Contact: e-mail: Contractor: VIKING CONSTRUCTION INC 2605 W HAYDEN AVE HAYDEN. ID 83835 (208) 762-9106 VIKING CONSTRUCTION INC 2605 W HAYDEN AVE HAYDEN. ID 83835 (208) 762-9106 VIKING CONSTRUCTION 2605 W HAYDEN AVE HAYDEN, ID 83835 (208) 762-9106 Owner: VIKING CONSTRUCTION DBA VIKI 2605 W HAYDEN AVE HAYDEN, ID 83835 e-mail: Occupant: e-mail: Arch / Engineer: e-mail: 11 •s J.l.. -�r -J Project NEW SFR -SEWER Description: M Building Landuse Engineer Utilities Health Fire Dist Assessor APPLICATIO CONSTRUCTION PLAN SITE PLA TD Please send all plan review and project comments via e-mail to the highlighted individuals. SITE PLAN SCALE: 1" = 20' - 0" F= a Z W oq F aWQ� �v�Wv�O Z l -6 w uarn<w >V2u.O a. AOz=C4�aO 0:E00>,UlP: ,4 pwa1 co) c, �aw0 [4 =4 co) z >¢ °zw Uw O Z- E wOaC:4 F- o °�(jO00 �uuaz E C7awF.Q<° Z ZF.x-4a OGU U a Q r1.1 E. Ac) ul F. aww5 0 LOT 7 BLOCK 1 PRASADA PLACE SPOKANE VALLEY, WA. 60.00' PROPERTY LINE LOT AREA = 9,031 SQ. FT. 20' MIN. REAR YARD SETBACK LINE 0 PROPOSED SINGLE AMILY RESIDENCI ROPOSE BUILDING HEIGHT = 27-9"+ NNING DEPT. APPROVED/ BY•i/� DATE: 7 ATER CONCRETE D This s . .. . mg sub= • . urpose of obtaining a building permit and is a true and correct representaion of the propsal. All known property line/dimensions, curb lines, structures and easements have been identified. Also indicated are wetlands, bodies of water, steep slopes or other critical areas. Signed: 9 �'Y Date: 6- 9- 09 UNDER A GROUND 15' BORDER EASEMEYIT LINE U POWER 60.00' PROERTY LINE` 0 00 622 S. MOEN ST. STANDING CURB O CV 24'-4" 8'-0"1 EXISTING APPROACH JONES, WINDSOR GRAND FS