HomeMy WebLinkAbout2009, 06-18 Permit App: 09001779 Residence' Project Number: 09001779 Inv: /
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 6/18/2009 Page 1 of 3
Project Information:
Permit Use: NEW SFR -SEWER Contact: VIKING CONSTRUCTION INC
Address: 2605 W HAYDEN AVE
C - S - Z: HAYDEN, ID 83835
Setbacks: Front Left: Right: Rear: Phone: (208) 762-9106
Group Name:
Site Information: Project Name:
Plat Key: Name: Range
District: East
Parcel Number: 55191.3107
Block: Lot:
SiteAddress: 622 S MOEN ST Owner: Name: VIKING CONSTRUCTION DBA VI
Address: 2605 W HAYDEN AVE
Location:: CSV HAYDEN, ID 83835
Zoning: R-3 SF Res District
Water District: 134 CONSOLIDATED ID #19 Hold: ❑
Area: 9,031 Sq Ft
Nbr of Bldgs: 0
Width: 0
Nbr of Dwellings: 0
Depth: 0 Right Of Way (ft): 0
Review Information:
Review
Building Plan Review
Released By:
Driveway/Approach
Originally Released: 6/18/2009 By: tmelbourn
Released By:
Originally Released: 6/18/2009 By: WMCGAV
Landuse/Zoning/H E Conditions
Released By:
Sewer Review
Originally Released: 6/17/2009 By: kkendall
Released By:
Permits: T--.........".45.^.•".•-"-•""1" ,
Operator: jmm Printed By: jmm
Print Date: 6/18/2009
Project Number: 09001779
Inv: 1
Application
Date: 6/18/2009 Page 2 of 3
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Contractor: VIKING CONSTRUCTION
Address: 2605 W HAYDEN AVE
HAYDEN, ID 83835
Item Description
APPROACH -CONST IN ROW
Contractor: VIKING CONSTRUCTION
Address: 2605 W HAYDEN AVE
HAYDEN, ID 83835
Description Grp It Notes
1&2 FAMILY R-3 VB
2ND FLOOR R-3 VB
GARAGE U-1 VB
Item Description
RESIDENTIAL PERMIT FEE
WSBCC SURCHARGE
SF PLNS RVW < 7999 SQ FT
Contractor: AIR DESIGN INC
Address: 1807 E FRANCIS AVE
SPOKANE, WA 99207
Approach
Firm: VIKING CONSTRUCTION
Phone: (208) 762-9106
Units Unit Desc
1 NUMBER OF
Permit Total Fees:
Building Permit
Fee Amount
$50.00
$50.00
Firm: VIKING CONSTRUCTION
Phone: (208) 762-9106
This Application:
Total Project:
Sq Ft Valuation Sq Ft Valuation
1,160 $112,322.80 1,160 $112,322.80
1,614 $120,533.52 1,614 $120,533.52
442 $8,398.00 442 $8,398.00
Totals: 3,216 $241,254.32 3,216 $241,254.32
Units Unit Desc
1 SELECT
1 SELECT
1 SELECT
Permit Total Fees:
Mechanical Permit
Fee Amount
$1,788.95
$4.50
$715.58
$2,509.03
Firm: AIR DESIGN INC
Phone: (509) 487-4328
Plumbing Permit
Contractor: THOMAS PLUMBING & HEATING
Item Description
TOILETS/BIDETS
DISH WASHERS
GARBAGE DISPOSAL
CLOTHES WASHER
MISCELLANEOUS FIXTURES
Units
2
1
1
1
2
Operator: jmm Printed 13y: jmm
Firm:
Phone:
Unit Desc.
NUMBER OF
NUMBER OF
NUMBER OF
NUMBER OF
NUMBER OF
Permit Total Fees:
Print Date:
Fee Amount
$12.00
$6.00
$6.00
$6.00
$12.00
$42.00
6/18/2009
Project Number: 09007779 Inv: 1
Application
Date: 6/18/2009 Page 3 of 3
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Notes:
Payment Summary: ,
Permit Type
Approach
Building Permit
Plumbing Permit
Fee Amount
$50.00
$2,509.03
$42.00
Invoice Amount
$50.00
$2,509.03
$42.00
$2,601.03 $2,601.03
Amount Paid
$0.00
$702.14
$0.00
Amount Owing
$50.00
$1,806.89
$42.00
$702.14
$1,898.89
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature: _
Operator: jmm Printed By: jmm
Print Date: 6/18/2009
Permit Center 992RECEIVED BY
ln"" 11703 E sprigi $ p�A 1E VALLEY
���� Spokane Valley, WA 06
0000 \falleye (509)688-0036 FAxj o;9)$8s o0^"?79.
wwwspokaneval ley ore
Community Development PERMIT CENTER
Residential Constructioruy: ��onstrllction
Joka els
Q
PERMIT NUMBER: /-1`/1j
PERMIT FEE:
Permit Application Additioit/Remodel
Other:
Accessory Bldg
Deck
SITE ADDRESS: Lon- Mb -es) S� U--)11
I I j�
ASSESSORS PARCEL NO: 5 c) l"/1 . "2)10-1 LEGAL DESCRIPTION: - 1 (3' Y 1' ura. I��--
Building Owner:
Contractor:
Name:\Ill, U11 tI „(iAm
11�'
1^n
Nanie: VI
Address`::
apil
\
Address: . el (33.
li W
w '1
It'1C_ USItaWte:
y
City: "1,
J) Zip:8 3cS
l
City: State: Zip:
Phone: l�,_Ql•n l -/q i � Fax ^rloh, . g55—i
( 11 /
Phone: Fax:
30% SLOPES ON
PROPERTY: N A-
Contractor L` ,1t.it,je l6'tpj'i3lii Exp Date:
Contact Person
HEAT SOURCE: '
(-kS rei Zak"? A 1.2_
City Business Lic. No:
p�
Name: , )1(3I'n1A'1Tail
1
Phone : �.1 - ILg.—_\l i��?
Describe the scope -of work in detail:
Cost of Project: $
anaytt("6 q r n ual atriskteL Qo.fQ cy
Proposed Use: 8V4
*The following MUST be corn tete: (write N/A if not.ap)tlicable)**********************
HEIGHT TO PEAK27l�p
DIMENSIONS: 0X44
#OF"STORIES. Z
TOTAL,AZ ABLE SPACE:
MAIN FLOOR TO SQ.
FTG. I (LoU Oct
2"" FLOOR SQ. FTG:
14r9
UNFIN BASEMENT SQ. FTG:
PJ ,
IMPERVIOUS SURFACE
AREA:
25-32--
FINISHED BASEMENT
SQ. FTG: N A-
GARAGE SQ. FTQ:
opt 4 Z
DECK/COV. PATIO SQ. FTG:
IQ At—
30% SLOPES ON
PROPERTY: N A-
# OF BEDROOMS: 3
CONSTRUCTION TYPE:
HEAT SOURCE: '
(-kS rei Zak"? A 1.2_
SEWER OR SEPTIC?
.S T.,/ 64-e_
The permitee verifies, acknowledges and agrees by their signature that 1) If this permit is for construction of or on a dwelling, the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or
local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before
this application can be processed. "
SIGNATURE: ACA r }t ) j 1 DATE: 1()--1 1)9
Method of Payment:
❑ Cash
Bankcard #:
Authorized Signature:
REVISED 2115/07
Check
❑ Mastercard . ❑ VISA
Expires: VIN#:-
•
Permit Center
Ir .,,� 11703 E Spi ague .Ave, Suite T .
Spnn Zicane Spokane Valley, WA 99205
Val le' (509)6E8-0036 FAX: (s09,F�,F —77
`CEj "VW'5nOi:uncvallcv r.�
Cummuntly Devclopmcnl
Plumbing Permit Application
SITE ADDRESS:
rn L.
mere
Costmercial
PERMITNUMBER:
PERMIT PEE:
Residential
•
Building Owner .
Nalnc:Pax
\'l/Ll't}.. Phone r6. -'o 71.;1 SiG(: ,first!. 71„1-CI1()'-)
Address: r� r' CiN;. (
7�xiJl ).J. ,'V r6.. t(��ii:�l L111L.. �ri 4-��.1�.P1 Slate �1Zip(1*".=1�:)
Contra dor '
Name: IA' \ n Q� C iro_
�; I at-, 7 �-1 .C.n F.tx.
AJdicss. I Stade Zip.
LmT, 1 Q e6..
cnse Nn-fM
hbQ Y\4- ``,3 3 r ;.y Rus„.:r..
ConlneI -
Name. Phone.
DESCRIPTION OF WORK
5 OF UNITS
X
COST
=
TOTAL AMOUNT
1
TOILETS
/.:'. E;;: L0Se,,::I0E-.i
X
$6.00
=
2
URINALS
X
$6 00
3
TUBS
X
$6 00
4
SHOWERS (PER TRAP)
BATH. STALL, ON -°•ITE BUILT
-
X
$6,00
5
-
SINKS
LAVS/BA=INS_ OAR, P.GOR, KI7-2�w; '
LAUNDRY. UTILITY. JAPTOR, Pi' ,6.O.
X-RAY, FOC :✓FP/CULINARY MEAT
X
$6.00
=
6
DISHWASHER
X
$6.00
=
7
CLOTHES WASHER
t
X
$6.00
=
6
GARBAGE DISPOSAL
X
56.00
=
9
WATER SOFTENER
X
56 00
=
10
ELECTRIC HOT WATER TANK
NG1 E: IF G/ 9, '-. • .i"HANI'„?c
X
56 00
=
11
FLOOR DRAINS
ARE'., ^,:.E,9,' ::II, 14EN:11
X
56.00
12
ROOF DRAINS/OVERFLOW DRAINS
X
56.00
13
FOUNTAINS, DRINKING
X
$6.00
14
WATER PIPING/DRAIN-IN WASTE.
VENT, PLUMBING, REVERSAL •
NSTAIJ /.J IUii ALTERATION. REPAIR,
REVERSALS
X
$6 00
=
15
SEWAGE EJECTOR
GRINDER, SUMP PUMP
X
5600
=
16
WATER USING DEVICE
ICE AN/GR 7.0:-: SE MAKER. HC SE 019,
- :1EF
.•ROUFE_ CARD/ NA 70R. SWAMI)
Cnn; 70
..
X
$6.00
=
17
CROSS CONNECTION DEVICE
VACUUM 0:';;A-'..=. ECK VAL.'E .
AND R.RO.P.D. FOR: BATS, TANbS,
BOILERS
X
56.00
=
16
INTERCEPTORS
GREASE TRAP, SAND TRAP,
CHEMICAL HOLDING TANK
X
56 00
=
19
MEDICAL GAS (per outlet)
NITROuS, OXYGEN
X
56.00
=
20
MISCEI LANEDUS PLUMBING FIXTURE
X
5600
=
21
PRIVATE SEWAGE DISPOSAUSYS
X
520 00
22
INDUSTRIAL WASTE INTERCEPTOR
X
515.00
=
METHOD OF PAYMENT:
SUBTOTAL
UCASH 0 CHECK ❑ VISA 0 MC E'PIi _,:
PROCESSING FEE
$35.00
Card# '.11`
TOTAL PERMIT FEE DUE:
AUTHORIZED SIGNATURE:
REVISED 106/05
Permit Center
bnnok„� ne
1 1703E Sprague Ave, Stine0-3? t --e' 7 Spokane Valley, WA 99206
sVa Lr., -J • (5090685-0036 FAX: (509)685-0037
Coinmunily Development ""'v spol:anevaller nr�
IViechanical Permit Application n Commei-cial
SITE ADDRESS: (flea- J. MISC-C\
'PERMIT NUMBER:
PERMIT FEE:
Residential
Building Owner
Name: I
v 1r
Phone: / r ,, Fax-
air, .�lr,a tll Ar i( rC,.-1 it,i'U
Gilt' L • Stale. ari�
litI [IL).
i" :.
7 .
-IP:b�r•,-lJ
'LIP:
Address' t
ILL0h i�1, j ,-,',cio;,
Contra elm
Name: Do lis 1
Phone: A31 ���1 _yam Fax:
Address
Otic Stale
License No evict*.utp, ('
J
City Rosiness Lm'
Contact
Name:
Phone'
DESCRIPTION OF WORK
1 FUEL BURNING APPLIANCE • Eo -:I • -;.'n than 100,000
# OF UNITS
2 FUEL BURNING APPLIANCE More than 1 00,000
3 UNLISTED APPLIANCE (Additional Fee) Equal to c• !erg than 400,000
4 UNLISTED APPLIANCE (Additional Fee) More than 400.000
5 USED APPLIANCE (WSEC min AFUE rating) Equal to or less than 400,000
6. USED APPLIANCE (WSEC min. AFUE rating) More Ihan 400,000
1- 100M BTU
7 BOILER/REFRIGERATION
X
COST
$12.00
$15.00
$50.00
$100 00
550.00
5100 00
TOTAL AMOUNT
•
X
512 00
8 BOILER/REFRIGERATION
101 - 500M BTU
X
$20 00
9 BOILER/REFRIGERATION
10 BOILER/REFRIGERATION
11 BOILER/REFRIGERATION
12 GAS LOG, GAS INSERT, GAS FIREPLACE
13 RANGE
501 - 1,00DM BTU
'L01 - 1,750M BTU
. ^,o,- than 1,75uid BTU
14 DRYER
$25.00
535.00
560.00
$10.00
$10.00
$10.00
15 FUEL BURNING WATER HEATER
510.00
16 MISC. FUEL BURNING APPLIANCE
510.00
17 GAS PIPING (each outlet)
10 DUCT SYSTEMS
X
X:
$1.00
19 VENTILATING FANS
20 AIR HANDLER (DOES NOT include ducting)
21 AIR HANDLER (DOES NOT include ducting)
22 EVAPORATIVE COOLERS
23 TYPE I HOOD
X
Equal to Of less than 10,000 CFM
'3reatr'w=.n 11000 CFM
X
X
x
$10.00
$10.00
512.00
X
515.00
510.00
550.00
24 TYPE II HOOD
X
510 00
25 HEAT PUMP/AIR CONDITIONER
0-3 TCN
X
512.00
26 AIR CONDITIONER
4-15 TON
X
$20.00
27 AIR CONDITIONER
15-30 TON
X
525 00
28 AIR CONDITIONER
30-50 TOIJ •
X
$35.00
20 AIR CONDITIONER
More than 50 TON
x
30 LPG STORAGE TAIJI(
31 WOOD OR PELLET STOVE/INSERT
32 WOOD STOVE - FREE STANDING
33 REPAIR 8. ADDITIONS
34 VENTILATION SYSTEMS
x
$00.00
510.00
$1000
35 VENTILATION MECHANICAL EXHAUST
36 INCINERATOR - RESIDENCE
37 INCINERATOR -COMMERCIAL
METHOD OF PAYMENT:
❑CASH ❑ CHECK 0 VISA 0 MC
CARD:
AUTHORIZED SIGNATURE:
REVISED 6126/05
EY,PIP,ES:
'JIN.
-X
x
x
X
X
X
UBTOTA
$?5 00
515.00
512.00
512.00
519.00
522.00
S
PROCESSING FEE
TOTAL PERMIT FEE DUE:
L
535.00
tee.:..:.
nrr
f � ii2
Valley.
Community Development
Permit Center
11703 E Sprague Ave, Siiite 8-3
Spokane VaIIev, .VA 99206 '
(509)688-0036 FAX: (509)688-003'
www.spokaneva l lev, nn+
Approach Permit Applicat>_ori
PERMIT NUMBER:9 -1715
PERMIT FEE:
PROJECT ADDRESS 1-c 5 S . \1'\(j-\ %i -
START DATE
ANTICIPATED COMPLETION DATE
Building Owner:
Contractor:
Name: V `, Lu1 Y A
Name. I t ,
Address: ',\1n i1 t'�\ X1/1•
1!'1da\ :
ht t,
Address:
City:' �,:, I L' k,, 0.,,nState:
_i
l 11 Zrp:.}'.Th
City:
State:
Zip:
phone: 21 :G...11 i 7 -CO CIL'
Pa:.)(,F, --)l ,,) • L I C i31
Phone:
Fax:
Contact Pelson
�N'�
Contractor LicV 7i9'1{. :i't9
6, �.{\`Exp Date:
%
Name:
City Business Lie: No:
-
Phone:
' PROJECT DESCRIPTION (Provide site sk.: rch)
Residential Driveway
Existing Curb & Gutter
Culvert Installation
Other Conditions
•
Commercial/Inditstrial Driveway
Rural Road Section
Sidewalk Repair/Construction
Bond/insurance certification must be on file with lir •.::v,
DISCLAIMER
The permittee verifies, acknowledges and agrees by their signatures that: 1) If rhis permit is for construction of or on a dwelling, the
dwelling is/will be served by potable water. 2) ( )wnersl•',i, of this City Of Spok:ane'Palle}% Permit inure to the property owner. 3) The
signatory is the property owner or has permission ol ep:fss nt th•- property owner in this transaction. 4) All construction is to be done in
full compliance with the City of Spokane Valley Development r',:d. Refer._.,: j codes are available for review at the City of Spokane
Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit 01 approva! for any violation of federal, state or local laws,
codes or ordinances. 6) Plans or additional infonnarina SITS he re•,cned to be submitted, and subsequently approved before this
application can be processed.
Signature
Llaerbod of Payment:
❑ Cash ❑ Check:
Banlccard #: '
Authorized Signature:
REVISED 1ISID6
Date
9 hvasrercard 9 VISA
Expires: VIN#:
Spokane
Valley®
• For City Use Only 7
PLUS Project Number ..7)-/ 77 9
Project Address (D77_ S lI' /fled,"
11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206
509.688.0036 ♦ Fax: 509.688.0037,4 permitcenter@spokanevalley.org,
As part of our on-going commitment to customer service during the, review process -of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date:
-
CC(off5/A-51
Your application review TARGET DATE is
The TARGET DATE is the date we estimate your project application will :have had •its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
Submit complete, accurate plans and documents.
Extra time may be required for re -submittals as project application reviewers work on multiple applications and it
may he several days before they can look at your new or revised information.
➢ Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual ,with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
Call staff regarding the status of your project only after the target date shown at the top of the page.
Although von should be contacted on or by the target date, please feel free to contact us von haven '1 heard frotn us
by your target date. Staff may contact you before the target date if the initial review is complete. By following, this
procedure, you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required'
documents, as indicated on your Pre -Application Checklist have been submitted or have been approved • for deferred
submittal. This does not prevent technical staff from requesting additional infonnation as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in. their, review queue until it
coines up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project,, technical staff may include multiple reviewers: Youshouldbe contacted by
phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any. subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE -APPLICANT PINK -BUILDING FILE REV9/07
Spokane
Valley
Development Engineering
11707 E Sprague Ave Suite 106 0 Spokane Valley WA 99206
509.921.1000 0 Fax: 509.921.1008 0 cityhall®spokanevalley.org
Approach Permit Application Review
TO: Building Department
Site Address: 622 S. Moen St.
Project No: 9-1779
Reviewed By:
Date: 4//7A,
Accepted
Not Accepted
Approach
X
Building Location
Paved Access
Notes: Saw cutting of existing curb is not allowed within the City's
jurisdiction. Driveway is to be inspected by the City's ROW Inspector prior
to concrete placement.
Reviewed By:
Date: 4//7A,
. VIKING CONSTRUCTION INC. 2605 W. Hayden Avenue Hayden, Idaho 83835
Vendor CITY OF SPOKANE VALLEY
Check 43616
Date siisisgq9
Invoice
3080 BP
jlnvoice Date • Job " k' rjt Description T, 1;.:
6/18/2009 3080 070100 Prasada Place 622 S MOEN
to %�'+Invc Amount ; Discounts^"Net Pay
1,898.89 0.00 $1,898 89
'137SAFEGUARD. LITHO USA SFSL4 5105051111
•
TO REORDER, CALL YOUR LOCAL SAFEGUARD DISTRIBUTOR AT 50¢5348001
MO25E008618
Spokan�
jUalley
Site Address: 622 S MOEN ST
Parcel Number: 55191.3107
Zoning: R-3
Fire District: FD 01
Project
Transmittal
City of Spokane Valley
Community Development
Department
11703 E. Sprague Ave, Suite B3
Spokane Valley, WA 99206
Phone: 509.688.0036
New project J
Pretaious pre -app meeting ❑
Plan revisions
Transmittal Date:
Wednesday, June 17, 2009
Project Number:
Water District: CONSOLIDATED ID #19
09001779
Applicant:
e-mail:
Contact:
e-mail:
Contractor:
VIKING CONSTRUCTION INC
2605 W HAYDEN AVE
HAYDEN. ID 83835
(208) 762-9106
VIKING CONSTRUCTION INC
2605 W HAYDEN AVE
HAYDEN. ID 83835
(208) 762-9106
VIKING CONSTRUCTION
2605 W HAYDEN AVE
HAYDEN, ID 83835
(208) 762-9106
Owner: VIKING CONSTRUCTION DBA VIKI
2605 W HAYDEN AVE
HAYDEN, ID 83835
e-mail:
Occupant:
e-mail:
Arch / Engineer:
e-mail:
11 •s
J.l..
-�r
-J
Project NEW SFR -SEWER
Description:
M
Building
Landuse
Engineer
Utilities
Health
Fire Dist
Assessor
APPLICATIO
CONSTRUCTION PLAN
SITE PLA
TD
Please send all plan review and project comments via e-mail to the
highlighted individuals.
SITE PLAN
SCALE: 1" = 20' - 0"
F=
a
Z
W
oq F
aWQ�
�v�Wv�O
Z l
-6
w
uarn<w
>V2u.O
a.
AOz=C4�aO
0:E00>,UlP:
,4 pwa1
co) c, �aw0
[4 =4 co) z
>¢ °zw
Uw O
Z- E
wOaC:4 F- o
°�(jO00
�uuaz E
C7awF.Q<°
Z
ZF.x-4a
OGU
U a Q r1.1
E. Ac) ul F.
aww5
0
LOT 7 BLOCK 1
PRASADA PLACE
SPOKANE VALLEY, WA.
60.00' PROPERTY LINE
LOT AREA
= 9,031 SQ. FT.
20' MIN. REAR YARD SETBACK LINE
0
PROPOSED SINGLE
AMILY RESIDENCI
ROPOSE
BUILDING
HEIGHT
= 27-9"+
NNING DEPT. APPROVED/
BY•i/�
DATE: 7 ATER
CONCRETE
D
This s . .. . mg sub= • . urpose of
obtaining a building permit and is a true and correct
representaion of the propsal. All known property
line/dimensions, curb lines, structures and easements
have been identified. Also indicated are wetlands,
bodies of water, steep slopes or other critical areas.
Signed:
9 �'Y
Date: 6- 9- 09
UNDER
A GROUND
15' BORDER EASEMEYIT LINE U POWER
60.00' PROERTY LINE`
0
00
622 S. MOEN ST.
STANDING CURB
O
CV
24'-4" 8'-0"1
EXISTING APPROACH
JONES, WINDSOR GRAND FS