2009, 07-07 Permit App: 09001978 DeckProject Number: 09001978 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Project Jnformation:
Permit Use: NEW DECK 14 X 40 Contact: JDS CONSTRUCTION
Address: 24324 E SPRINGDALE CT
C - S - Z: LIBERTY LAKE WA 99019
Setbacks: Front Left: Right: Rear: Phone: (509) 921-1871
Group Name:
Site lnforntation: Project Name: _ n
Plat Key: Name: Range
Date: 7/7/2009 Page 1 of 2
District: East
Parcel Number: 55191.3204
Block: Lot:
SiteAddress: 711 S MOEN ST Owner: Name: ALDRICH, DAVID
Address: 711 S MOEN
Location:: CSV SPOKANE VALLEY WA 99037
Zoning: R-3 SF Res District
Water District: 134 CONSOLIDATED ID #19 Hold: ❑
Area: 9,111 Sq Ft Width: 0
Nbr of Bldgs: 0 Nbr of Dwellings: 0
Review Jn formation • r
Depth: 0 Right Of Way (ft): 0
Review
Building Plan Review
Originally Released:
Landuse/Zoning/HE Conditions
Permits:
7/6/2009 By: tmelbourn
-Released-By:,--
Originally Released: 7/7/2009 By: mharnois
Operator: jmm Printed By: jmm
Print Date: 7/7/2009
Project Number: 09001978
Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 7/7/2009
Contractor: JDS CONSTRUCTION
Address: 24324 E SPRINGDALE CT
LIBERTY LAKE WA 99019
Description
DECK OPEN
jar
R-3
Building Permit
Page 2 of 2
Firm: JDS CONSTRUCTION
Phone: (509) 921-1871
This Application:
Type Notes Sq Ft Valuation
VB 14 X 40 560 $8,400.00
Item Description
RESIDENTIAL PERMIT FEE
WSBCC SURCHARGE
SF PLNS RVW < 7999 SQ FT
Notes -
Total Project:
Sq Ft Valuation
560 $8,400.00
Totals: 560 $8,400.00
Units Unit Desc
SELECT
SELECT
SELECT
Permit Total Fees:
560 $8,400.00
Fee Amount
$167.25
$4.50
$66.90
$238.65
Payment Summary:
Permit Type
Building Permit
Fee Amount Invoice Amount
Amount Paid
Amount Owing
$238.65 $238.65 $6690 $171.75
$238.65 $238.65 $66.90 $171.75
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: jmm Printed By: jmm Print Date: 7/7/2009
Spokane6�
CITY OF SPOKANE VALLEY
Community Development Department
Permit Center
11703 East Sprague Avenue, Suite 8-3
Spokane Valley, WA 99206
Tel: (509) 688-0036
Fax: (509) 688-0037
perm itcenter@spokanevalley.orq
PERMIT NUMBER:
(Staff Use Only)
q A91
PERMIT FEE:
RESIDENTIAL CONSTRUCT! O'N ERMIT APPLICATION
❑I NEW CONSTRUCTION
1p DECK
9 ADDITION/REMODEL
9 OTHER
SITE ADDRESS: 111 5. M o e. n
9 ACCESSORY BUILDING
ASSESSORS PARCEL NO.:
LEGAL DESCRIPTION:
BUILDING OWNER NAME:
NAME:
I o -v cL AICLri c -k
ADDRESS: I 1 1 5.1\40E11
CM: Greenac re s
STATE:
\ Ja
ZIP:
PHONE: l 5 OCI 2.30-521u)
FAX: CELL:
CONTACT NAME:
PHONE:
FAX: CELL:
CONTRACTOR NAME: Jon n N DO n L ZVbS l_zns C-4 on
MAILING
I ADDRESS: a432Li E. SAY. ri dale_ \C,�I�/�
CITY: L., bit I- LW14e_� i STATE: VVI,L.
PHONE:C /C� J _I 21-1 S'1 I FAX:
II ZIIP:vl 1 o I(q�
CELL:I5c I / 1 1 y - -IS 2 -
CONTRACTOR LICENSE NO.: J1:SCobSg45 D F EXPIRES: q {p -2D I l] CITY BUSINESS LICENSE NO.: lnnZ- LD4 0-155
DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE U E:
11Q,2h0v 0C DecV Dn back of- house,
PROPOSED USE:
t ersorLO—1 USQ-
Effective October 28, 2007 Page 1 of 2
http://www.spokanevalley.org/uploads/Community_Development/Documents/Forms/Building/Residential Construction Permit
App.l.doc
****YOU MUST COMPLETE THE FOLLOWING****
MARK N/A IF NOT APPLICABLE
Height to Peak: k:
/A
Dime `-t nisioCnsl /
Y
No. of Stories: ,/A
Total Habitabl:e
Space: /A
Main Floor $Q FT:
N/k
Upper F,Ictor SQ FT:
N /A
Unfinished Ba ement
SQ FT: NI /A
Finished Basement
SQ FT: NI//3c
Garage SQ,FT•
IV /k
Deck -overed
tie
aop sc1c4 „.
Impervious $u ace
Area: jNI / k
30% Slopes on /
SQ
Property: 1//9\
FT:
No. of Be r oms:
r4 /A
', c
re Sd,
ion Type:
enConstru
a -I
Heat Source:
K
�A
Sewer or Septic:
N/A
TOTAL COST OF PROJECT: $ 1p 15oO .
DISCLAIMER
The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling Is/will
be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory Is the property
owner or has permission to represent the property owner In this transaction. 4) All construction Is to be done In full compliance with the City of
Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of
Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional
Information may be required tbg a submitted and subsequently approved before this application can be processed.
Signatu
Date:
Method of payment: 0 Cash ❑ Check
Bankcard #:
0 Visa 0 Mastercard
EXP: VIN#:
Authorized Signature:
Effective October 28, 2007 Page 2 of 2
http://www.spokanevalley.org/uploads/Community_Development/Documents/Forms/Building/Residential Construction Permit
App.l.doc
't
Spokane
Valley°
For City Use Only
PLUS Project Number 9-14-7g
Project Address 7// S Merril
11703 E Sprague Ave Suite B-3 ♦,Spokane Valtey WA 99206
509.688.0036 • Fax: 509.688.0037 • permitcenter@spokanevalley.org
As part of our on-going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
Your application review TARGET DATE is
The TARGET DATE is the date we estimate your project application will have had. its initial technical
review. it is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review;.
i Submit complete, accurate plans and documents. •
Extra time may be required fiJr re -submittals as project application reviewers ,work on multiple, applications and it
may be several days before they can look at your new or revised information. ,
Designate-a.specific contact person to communicate with the City.
While the person designated as 'the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the hest choice for the, entire review process.' .
i Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you shoitld be contacted on or by the target date, please feel free to contact us if you haven't heard from us
by your target date. Staff may contact you before the target date if the initial review is c'thplete. By following this
procedure, you will save time and allow the reviewers to complete the work more expeditiously. ' -
Steps in the Permit Process
I. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the,technical review once it is started. When
this step is complete, your application will be routed•to the appropriate staff and remain .in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending.on the type -of project, technical staff may include ,multiple reviewers. You should be contacted by
phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. -
4. Permit Issuance. When the technical compliance review of the application is complete,'including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre -construction meetings (if'required) will be provided by
the Permit Specialist at that time
WHITE -APPLICANT PINK - BUILDING FILE
REV 9/07
a
lM
7
Coel
Sim
P 004,
ed *ye
lJ
0 0.0*°°°
7115, rnoE,/