Loading...
2009, 02-25 Permit App: 09000358 ResidenceProject Number: 09000358 Inv: 1 Application Date: 2/25/2009 Page 1 of 3 I I THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Information: Permit Use: SFR W/ATT GAR Setbacks: Front Site Information: Plat Key: Left: Right: Rear: Contact: VIKING CONSTRUCTION DBA VIKING Address: 2605 W HAYDEN AVE C - S - Z: HAYDEN, ID 83835 Phone: (208) 762-9106 Group Name: Project Name: Name: Range District: East Parcel Number: 55191.3204 SiteAddress: 711 S MOEN ST Location:: CSV Block: Lot: Owner: Name: VIKING CONSTRUCTION DBA VI Address: 2605 W HAYDEN AVE HAYDEN, ID 83835 Zoning: R-3 SF Res District Water District: 134 CONSOLIDATED ID #19 Hold: ❑ Area: 9,111 Sq Ft Nbr of Bldgs: 0 Review Information • Width: 0 Nbr of Dwellings: 0 Depth: 0 Right Of Way (ft): 0 Review Building Plan Review Released By: ' Driveway/Approach .Released By: Landuse/Zoning/HE Conditions Sewer Review Originally Released: 2/25/2009 By: CJJANSSE Released -By: --r; Permits _ . Operator: JD Printed By: JD Print Date: 2/25/2009 Project Number: 09000358 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 2/25/2009 Page 2 of 3 Contractor: VIKING CONSTRUCTION Address: 2605 W HAYDEN AVE HAYDEN, ID 83835 Item Description APPROACH -CONST IN ROW Contractor: VIKING CONSTRUCTION Address: 2605 W HAYDEN AVE HAYDEN, ID 83835 Description Grp Type 1&2 FAMILY R-3 VB 2ND FLOOR R-3 VB GARAGE U-1 VB Item Description RESIDENTIAL PERMIT FEE WSBCC SURCHARGE SF PLNS RVW < 7999 SQ FT Notes Contractor: VIKING CONSTRUCTION Address: 2605 W HAYDEN AVE HAYDEN, ID 83835 Item Description GAS WATER HEATER GAS APPLIANCE<=100,000BTU GAS PIPING HEAT PUMP OR A/C 0-3 TONS VENTILATING FANS 1 DUCT RANGE Approach Firm: VIKING CONSTRUCTION Phone (208) 762-9106 Units Unit Desc 1 NUMBER OF Permit Total Fees: Building Permit Fee Amount $50.00 $50.00 Firm: VIKING CONSTRUCTION Phone: (208) 762-9106 This Application: Total Project: Sq Ft Valuation Sq Ft Valuation 1,220 $118,132.60 1,220 $118,132.60 1,590 $118,741.20 1,590 $118,741.20 483 $9,177.00 483 $9,177.00 Totals: 3,293 $246,050.80 3,293 $246,050.80 Units Unit Desc I SELECT 1 SELECT 1 SELECT Permit Total Fees: Mechanical Permit Units 1 4 1 4 1 Operator: JD Printed By: JD Fee Amount $1,816.95 $4.50 $726.78 $2,548.23 Firm: VIKING CONSTRUCTION Phone: (208) 762-9106 Unit Desc NUMBER OF NUMBER OF # OF UNITS NUMBER OF NUMBER OF NUMBER OF Permit Total Fees: Print Date: Fee Amount $11.00 $13.00 $4.00 $13.00 $44.00 $10.00 $95.00 2/25/2009 Project Number: 09000358 Inv: I Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 2/25/2009 Contractor: VIKING CONSTRUCTION Address: 2605 W HAYDEN AVE HAYDEN, ID 83835 Item Description TOILETSBIDETS SINKS SHOWERS TUBS DISH WASHERS CLOTHES WASHER WATER SOFTENER MISCELLANEOUS FIXTURES Notes: Plumbing Permit Page 3 of 3 Firm: VIKING CONSTRUCTION Phone: (208) 762-9106 Units Unit Desc 3 NUMBER OF 5 NUMBER OF 2 NUMBER OF 2 NUMBER OF 1 NUMBER OF 1 NUMBER OF 1 NUMBER OF 3 NUMBER OF Permit Total Fees: Fee Amount $18.00 $30.00 $12.00 $12.00 $6.00 $6.00 $6.00 $18.00 $108.00 Payment Summary: Permit Type Approach Building Permit Mechanical Permit Plumbing Permit Fee Amount Invoice Amount Amount Paid Amount Owing $50.00 $50.00 $0.00 $50.00 $2,548.23 52,548.23 $726.78 $1,821.45 $95.00 $95.00 $0.00 $95.00 $108.00 $108.00 $0.00 $108.00 $2,801.23 $2,801.23 $726.78 $2,074.45 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: JD Printed By: JD Print Date: 2/25/2009 Spokane Vafley® For City Use Only PLUS Project Number ()9(fl' ssj Project Address - (I[SN!nett 11703 E Sprague Ave Suite B-3 t,' Spokane.Valley WA 99206 • 509.688.0036 ♦ Fax: 509.688.0037 permitcenter@spokanevalley:org: • • As part of our on-going- commitment to customer service during the review: process ,df your project: application, we,are providing you:with a TARGET DATE for the initial technical applieation-revie'w If for! any reason we cannot meet this date, we will contact ou with a re /u_ c'14 ' ' r Jv'/R(��\\I P.1 \\ Fp0 Your ap)ilication-review'TARGET DATE is 11t The TARGET DATE is.the date we estimate your project application will have4had its initial. technical: review. It is not the date for approval or permit issuance. . Tips for a Smoother Project Application Review i Submit complete, accurate plans and documents. - Evtra time may be required for re,snhmittals as project application reviewers work on multiple applications and -it may be several darns before they can look at your new or revised mfbrmation. Designate a specific contact person to communicate with the City. . While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer conanents would he the hest choice for the entire review process. Call staff regarding the status of your project only after the target date shown at the top of the page. • Although you should be contacted 017 or by the target date, please feel free to contact us if you haven't heard from zis by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, rou will save time and allow the reviewers to complete the work more expeditiously.: Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. •This'means all of 'the required. documents, as indicated on your Pre -Application Checklist have been submitted .or., have been approved for deferred.• submittal. This does not prevent technical staff from requesting additional information as'a resultpf their technical review.. 2. Quality Check. The next step 'in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical' review once itis started. When. this step is complete, your application will be routed to the appropriate staff and remain .in' their, review, queue until it . comes up for review. - - 3. Technical Compliance. Once an application is administratively complete, it is•routed to technical staff for cornpliance review. Depending on the type of project, technical, staff may include multiple reviewers.' You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is -complete. ' 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route'it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and eontact the:person specified, on your ' • application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be'proVided by the Permit Specialist at that time. - - WHITE -APPLICANT PINK -BUILDING FILE REV9/07 V) Stio % Valley Community Development Residential Construction 171New Construction Permit Application Addition/Remodel Other: Permit Center 11703 E Sprague Ave, Suite B-3 Spokane Valley, WA 99206 , (509)688-0036 FAX: (509)688-0037 www. s o o k an e v a l I ev. o r e PERMIT NUMBER: PERMIT FEE: Accessory Bldg Deck SITE ADDRESS: 71( 5.. MOBN sr ASSESSORS PARCEL NO- 5Wt 1 Ja0`-I LEGAL DESCRIPTION: l ot- 'BIL Tr.ns, 01. Building Owner: Contractor:'''�",,, Name:\Iiiiig, Address: ! 1. Name: VI�(,.nr\ (1h1'5I�H,'ue-1Dn� Address: i&'II DOS LO. \-1eAt pUl Out City: I�l�l to t 11 State:_ri Zip: papal City: State: Zip: Phone: Fax: Phone: ,Th...,u) Fax:xflu},L6r\� "- iir)- nf j l.J FINISHED BASEMENT SQ. FTG. N/A Contractor Lic V &u\30 o N-Eixp Date: Contact Person - 30% SLOPES ON PROPERTY: NO City Business Lic. No: TYPE. Co'v. HEAT SOURCE: ' GFA SEWER OR SEPTIC? 5Ew6R Name: Phone: Describe the scope of work in detail: Cost of Project: $ riDE Proposed Use: **************The following MUST be coinplete: (write N/A if not applicable)************* HEIGHT TO PEAK: 301- `i" DIMENSIONS: 10,-0.4`-o"x 't8' -C" # OF STORIES. TWO TOTAL HABITABLE SPACE: 2,810 MAIN FLOOR TO SQ. FTG. 1 zzo 2"1' FLOOR SQ. FTG: 1590 UNFIN BASEMENT SQ. FTG: NIA IMPERVIOUS SURFACE AREA: 2739 FINISHED BASEMENT SQ. FTG. N/A GARAGE SQ. FTG: • l 83 DECK/COV. PATIO SQ. FTG: N!A • 30% SLOPES ON PROPERTY: NO # OF BEDROOMS:CONSTRUCTION 3 TYPE. Co'v. HEAT SOURCE: ' GFA SEWER OR SEPTIC? 5Ew6R The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before this application can be processed. SIGNATURE: 1 Method of Payment: ❑ Cash Bankcard #: Authorized Signature: REVISED 21151a7 ❑ Check DATE: 411L9 109 LI Mastercard - ❑ VISA Expires: VIN#: • Spolu2 e • \ Alley Community Development • Prrm it Center 11703 E Sprague Ave, Sure B-3 Spokane Valley, WA 99206 (509)688-0036 FAX: (5091688-0037 441134V stokanevalley ore Mechanical Permit Application II PERMIT NUMBER: PERMIT FEE: Commercial In Residential sun?. ADDRess: —111 `S Nejn Building Chimer - Name.1 \�J Phone , r lot`, �u, a. `112.1.: Fax 71 rC, ..-Z;,,) style: r.;.) _ -u �, I -/.IP. c, - ,, Addl ess'. ` tst ` t City 11 Contractor Nance: nAr T l, t tr P:¢me' Fax ym Ant less: City State Zip: I.ic use No (-t e - Ctly Business Lie' Contact None. Phone. DESCRIPTION OF WORK g OF UNITS C FUEL BIIRNI14G APPLIANCE 2 FUEL BURNING APPLIANCE Eo.al w -.: b than 100,000 More Shan 1 t0,D00 x $1200 x $15.00 3 UNLISTED APPLIANCE (Additional Fee) 4 UNLISTED APPLIANCE (Additional Fee) Equal to or !eea than 400,000 More Than 400.000 x x $50.00 $100.06 5 USED APPLIANCE (WSEC min AFUE rating) 6 IISFD APPLIANCE (WSEC min. AFUE rating) 7 BOILER/REFRIGERATION 8 BOILER/REFRIGERATION Equal to or less than 400,000 More Than 400,000 1- 100M BTU x x $50 00 $100 00 x $12 00 101- 500M BTU 9 BOILER/REFRIGERATION 501 - 1,000M BTU x 10 BOILER/REFRIGERATION 11 BOILER/REFRIGERATION 12 GAS LOG, GAS INSERT, GAS FIREPLACE 13 RANGE ,::01 - 1,750M BTU Rod. Ilan 1,75151 BTU 14 DRYER x x x x x 15 FUEL BURNING WATER HEATER 1 x 16 MISC. FUEL BURNING APPLIANCE 17 GAS PIPING (each outlet) 18 DUCT SYSTEMS x 520 00 $25.00 $35.00 560.00 510 00 510 00 $10.00 $10.00 $10.00 51 00 19 VENTILATING FANS 20 AIR HANDLER (DOES NOT Include ducting) Equal to or less than 10,000 CFM 21 AIR HANDLER (DOES NOT Include duclln9) .great_: enni 91000 CFM 22 EVAPORATIVE COOLERS 23 TYPE IHOOD A-1 x x x x x x 24 TYPE II HOOD x swan 510.00 $12.00 515 00 51000 550 00 510.00 25 HEAT PUMP/AIR CONDITIONER 26 AIR CONDITIONER 0-3 TON x 2.00 4-15 TON x 520.013 27 AIR CONDITIONER 15-30 TON x $25 00 28 AIR CONDITIONER 30-50 TOtI x 29 AIR CONDITIONER More than 50 TON x 30 LPG STORAGE TANK WOOD OR PELLET STOVE/INSERT 32 33 34 35 36 37 WOOD STOVE -FREE STANDING REPAIR E. ADDITIONS VENTILATION SYSTEMS VENTILATION MECHANICAL EX] IAUST INCINERATOR — RESIDENCE INCINERATOR — COMMERCIAL T 535.00 560 00 $10.00 510.00 575.00 $15.00 512.0n 512.00 519.00 522.00 METHOD OF PAYMENT: DCASH 0 CHECK 0 VISA ❑ MC CARD N: AUTHORIZED SIGNATURE: REVISED 8/n/05 EXPIRES' IN: SUBTOTAL PROCESSING FEE 536.00 TOTAL PERMIT FEE DUE: Permit Censer art- " +. 11703 E Spra_ua Ave, Sti P-3 Spoka e Spokane Valley, WA 992)5 t'66, FU f, 5:091 ; i 42;00 -valley 333vE,09)'.sn065-003l:aneva1Ie,'m .09 Cmmnunily Development Plumbing Permit Application ' PERMIT NUMBER: PERMIT FEE: L_i Co;1lmerciaResidential SITE ADDRESS: 11 t • rnueim Building Owner Nmne:Phone. � Fax l �l '1�" 1 it i'� L1I01^ ,)If.' -)- LIiU - tAddress. n•' Stale.• ')I+iiri\,�. Ora �i';Ct,:�� NA_f �-�'R�: �C1 ^.Y, 11ZI) P:p.; -j2-a.-i Nance. 1 ht na 2‘.1,_)... z Fax Ad di css: I - Stale. Zip: 1.1000se110'...-ytA Y1 1.i•1`t CYT CT 2J 25 L':.T Rus/••e.;..:c' i Conlael Name. Phone DESCRIPTION OF WORK is OF UNITS X COST = TOTAL AMOUNT 1 TOILETS Y..= FEE':xOSE i, C;DE'.: ") X $6.00 = 2 URINALSX 5600 = 3 TUBS - d((�� X 5600 = 4 SHOWERS (PER TRAP) BATH. STP LL, ON -°•ITE BUILT ` X 56.00 = 5 SINKS LAVS/BASINS OAR, F f12R, KI'. -NFA'. - LALINDP.Y, UTILITY. JA;9TOR, PI'GT ). X-RAY. FOG =r Pl'+CULINARY MEAL ! X $6.00 = 6 DISHWASHER • c�J 1 X $6 RD = 7 CLOTHES WASHER I X 56.00 = 6 GARBAGE DISPOSAL X 56,00 = 9 WATER SOFTENER t X 5600 = ' 10 ELECTRIC HOT WATER TANK NOTE' IF GF ,.-=. C"HAN!'L?L X $600 = 11 FLOOR DRAINS 1,15.ENLII Ct :';EN,PTE .:�./ `I X X $6.00 56.00 = = 12 ROOF DRAINS/OVERFLOW DRAINS 13 FOUNTAINS, DRINKING • X 56.00 14 WATER PIPING/DRAIN-IN WASTE, VENT, PLUMBING, REVERSAL NETALI 11 iUil ,LFERATION, REPAIR, REVERSALS _ X $6.00 = 15 SEWAGE EJECTOR GRINDER, SUMP PUMP X $6 00 = 16 WATER USING DEVICE ICE AN/OR 41:2: :LE MAILER, HOSE Big, •-5-.'AEF LPG/LIFE'. CARD' •JA.'OR, SWAMP COOL 7o X 56 00 17 CROSS CONNECTION DEVICE VACUUM 04'?r -_ ECI(VAL.E • AND R.P.O.P.0 FOR: 'vATS, TANKS, BOILERS X 56 00 = 16 INTERCEPTORS GREASE TRAP, SAt.O TRAP, CHEMICAI. HOLDING TANK X $6.00 = 19 MEDICAL GAS (peromlet) NITROUS, OXYGEN . X 56.00 = 20 MISCEI.LANEOUS PLUMBING FIXTURE X $6 00 = 21 PRIVATE SEWAGE DISPOSAUSYS X $20.00 22 INDUSTRIAL WASTE INTERCEPTOR X $15 00 = METHOD OF PAYMENT: ❑CASH 0 CHECK 0 VISA 0 MC Card# SUBTOTAL E:'Pti _-'i PROCESSING FEE 535.00 ',IR' TOTAL PERMIT 6E0 OUE' AUTHORIZED SIGNATURE. DEVISED 6)26/05 CITIOF r• o ane Valley. Community Development , Permit Centel 11703 E Sprague 4 ve, Suite 13-3 Spokane•Valley, kA 99206 • (509)688-0036 FAX: (509)688-0037 www. s poi:anew. Ilev. nrP Approach'Perrnit Application PERMIT NUMBER: PERMIT FEE: P1:op cr ADDRESS .111 . - r11(De-til c�?' START DATE ANTICIPATED COMPLETION DATE 13uild ing Owner: Contractor: Name:Lir Name: \j dl t tit Cky: _ • ;l 1,0-ri) t )/ Stare: -i• 1] Address: =1P'.r-',.;Y �'1 city: State: Zip: Phone: _ ('1- • (:-_,) -t1 I1, 1/4. Fax: )I -As, .•11( :,.i • r., IS 61111 . . Phone: Fax: Contact Person Contractor Lic�V� A�l�'ll it`ll cC-1-•i�ji r Ex a Date: i Name: City Business Lk: No: Phone: • PROJECT DESCRIPTION (Provide she sk •rcii) Residential Driveway Existing Cull) & Cutter Culvett Installation Other Conditions • ' ' Commercial/Industrial Driveway Rural Road Section Sidewalk Repair/Construction Bond/I nsut ante certification must be ont'filc with lir civ. DISCLAIMER The permitter verifies, acknowledges and agrees by their signatures that I) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Oumersl.% of this City Of Spokane' \'alley Permit inure to the property owner. 3) The signatory is the property owner nr has permission tr. :ep sant th•. property owner in This transaction 4) All construction is to be done in full compliance with the City of Spokane Valley Deve6n mens C,;dr Refet .i codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit 01 approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional informanco Loa' hr arr.viied to be submitted, and subsequently approved before this application can be processed Signature A7etbod ofPaJ•ment: ❑ Cash ❑ Check: Raul:card #:• Authorized Signature: REVISED ]isles Date a131�, ❑ Masrercard ❑ VISA Ea:pires: VIN#: SITE =20' PL0AN SCALE:1"-" LOT 4 BLOCK 2 PRASADA PLACE SPOKANE VALLEY, WA. 60.00' PROPERTYIINE 6'-0 LP MIN REAR YARD SETBACK LINE 40'_0" PROPOSED SINGLE FAMILY RESIDENCE CASERTA GRAND B TWO STORY CONCRETE PORCII & SIDEWALK 14'-Q,I FI3ACK LINL z TI MIS' F¢U TYkaDSETRACKtM1 This sire plan is being submitted for the purpose of obtaining a building permit and is a true and correct repiesentaion of the propyl. All known property 'Loci dimensions. curb lines. structures and easements hese been identified Also indicated are wnlands. bodies of water. steep slopes or other cntical areas Signed' ,4"711.'4' Dam' 1109 Itl Linrry eastmrwTt •tff; ; t—_4 _ -T Il'nUPtIFR EASFMN'T I T 7I I S. MOEN STREET PLANNING DEPT. APPROVED m H t2 w E <Z w GZLti CNzyyC s'l- pZC�w ZCywF Z5<F ==you C �c z`��,�c AA :2 �CFiQQ� — sGSw-m2 C L w rn v.'vuJt-z o w w w w F- wi:Sv.0 L Z..<0?w GYw �+C'CS' uiw Z ,Cj ...z LOO Z so�y0. C FU_zz �UU��y= S LF Z <c ZFZF=Fs Z Iy0—< y <<nw_zz,�,. J J 5 C T. ALDRICH, CASERTA GRAND,B O O N 1• O O O 40'0"0 12'3"0 7'9"0 T7'3"0 12'0"0 8'6“0 1030) E \IONTGOMER ' DR SPOKANE VAUEV, WASHINGTON 9926. PHONE: (309)924-2420 FAX: (50))921-2:5” 0 0 N 1• 0 o HANGERS: 1.5 LU24 15 HUS26 50 H2.5 PRO -BUILD QUOTE #090307 VIKING JOB - ALDRICH MODEL: CASERTA GRAND ENTRY 'B' LOT / BLK: 4/2 ADDRESS: 711 S. MOEN ST, PRASADA PLACE, SPOKANE VALLEY, WA LG a LL F3A (5 ) - F3 (3 ) F3B (9 ) M - u LL I \ h ' E5GR ) i O E E4 :1 E3 E2 € E R■ 11 B2GR WelW Wilk.AM. Mar. . 2 W WIIWIIIW 131G-_ Al II lia-r ).. ]2(6) 1fi5 0 D1SG 12'3"0 7'9"0 T7'3"0 12'0"0 8'6“0 1030) E \IONTGOMER ' DR SPOKANE VAUEV, WASHINGTON 9926. PHONE: (309)924-2420 FAX: (50))921-2:5” 0 0 N 1• 0 o HANGERS: 1.5 LU24 15 HUS26 50 H2.5 PRO -BUILD QUOTE #090307 VIKING JOB - ALDRICH MODEL: CASERTA GRAND ENTRY 'B' LOT / BLK: 4/2 ADDRESS: 711 S. MOEN ST, PRASADA PLACE, SPOKANE VALLEY, WA Job Truss Truss Type Ory Ply ALDRICH 090307 A1G GABLE 1 1 Job Reference optional) PRO-BUILD, SPOKANE WA, Kirk Opeahl 7050 s May 22 2008 Mask Industries, Inc Thu Feb 121429 29 2009 Page -1-0-8 1-0-8 0-0-0 4-0-0 d-. 4-0-0 8-0-0-04-0-0 12-0-0 1-0-8 13-0b Scale =1:23.4 5x6 = 5x6 = 4-0-10 1 5 16 Ili 9 6 Q 15 12 I', I L 8.0012 I-r LA r I-F1 7 w al e -Iea 3 T1 (;;II ST2 ST1 STI ST1 T1 ST2 Pr.2 8 n Bi LJ „i --1 9 .d -- " 1 i"i•i•'Oi:JP❖Ai:•':OJJ•iOJOO•:t':••••JOO•iiJiPii•:iOJO•••-•i•J4 OO••••••••%•O•••••••••O • :•i JOOJO••iJJJi•)i•:+:•: 0CCeigO••4•P•...C ii:i::%:•i❖)0.•••i•:ii •••••••••••O••0001:0••OJOOO0P••••••••:•A••e•OPi6PJO:J❖OO:JO•iOO'iOOPOiPt•%�Pi•�•• 4x4 = 4x4 = 0-0-0 4-0-0- 8-0-0 12-0-0 4-0-0 , 4-0-0 i 4-0-0 - Plate Offsets (X,Y) [4 0-3-0p-0-8j, [fi 0-3-0,0-0-81 LOADING(psf) SPACING 2-0-0 CSI DEFL in (loc) Vdefl Lid PLATES GRIP TCLL 40,0 Plates Increase 1.15 TC 0.19 Vert(LL) -0.01 9 n/r 120 MT20 185/148 (Roof Snow=40 0) Lumber Increase 1.15 BC 0.08 - Vert(TL) -0.01 9 Nr 90 TCDL 8.0 Rep Stress Inc( NO WB 0.09 Horz(TL) 0.00 8 rVa n/a BCLL 0.0 " Code IRC2006/TP12002 (Matrix) Weight' 451b BCDL 100 LUMBER TOP CHORD 2 X 4 HF 1800F 1.6E 4) This truss has been designed for greater of min roof live load of 16 0 psf or 2.00 times flat roof I BOT CHORD 2 X 4 HF 1800F 1.6E of 40.0 psf on overhangs non-concurrent with other live loads. OTHERS 2 X 4 OF Stud/Std 5) Provide adequate drainage to prevent water ponding. BRACING 6) This truss has been designed for a 10.0 psf bottom chord live Toad nonconcurrent with any oche TOP CHORD live Toads Structural wood sheathing directly applied or 6-0-0 oc purlins, except 7) 411 plates are 2x4 MT20 unless otherwise indicated. 2-0-0 oc pedals (6-0-0 max.). 4-6. 8) Gable requires continuous bottom chord beanng BOT CHORD 9) Gable studs spaced at 2-0-0 oc. Rigid ceiling directly applied or 6-0-0 co bracing 10) - Thrs friss has been designed for a live load of 20.0psf on the bottom chord in all areas where REACTIONS (1b/size)rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. beanng 30 2 = 247/12-0-0 11) Prowde mechanical connection (by others) of Buss to plate capable of withstanding Ib 8. 20 Ib 12,2 Ib uplift at 13,6 Ib uplift at 14 8 247/12-0-0 uplift at joint 2,39 uplift at joint uplift at joint joint joint 12 = 274/12-0-0 51b uplift at joint 10. 2006 International Residential Code 13 = 212/12-0-0 12) This truss is designed in accordance with the sections ANSIITPI 1. 14 = 200/12-0-0 R502.11.1 and R802.10.2 and referenced standard 13) Design assumes 4x2 (flat onentation) purlins al oc spacing indicated, fastened to truss TC w/ 11 = 212/12-0-0 10 = 200/12-0-0 2-10d nails Max Hoa 2 = 46(1.0 6) LOAD CASE(S) Max Uplift Standard 2 = -30(1.0 7) 8 -39(LC 8) 12 = -20(LC 5) 13 = -2(LC 6) 14 = -6(LC 7) 10 = -5(LC 8) Max Gray 2 = 409(LC 15) 8 = 409(LC 15) 12 = 477(LC 14) 13 = 248(LC 14) 14 = 344(LC 15) 11 = 248(LC 14) 10 a 344(LC 15) FORCES (Ib) - Maximum Compression/Maximum Tension TOP CHORD 1-2 = 0/96 2-3 = -138157 34 = -120/42 4-15 = -9/39 5-15 = -20/38 5-16 = -20/38 6-16 = -9/39 6-7 = -120/42 7-8 = -138/57 8-9 = 0/96 DOT CHORD 2-14 = .4/38 13-14 = 4/36 12-13 = -1/36 11-12 = -1/36 10-11 = -2/36 8-10 = -2136 - WEBS 5-12 = 436/44 4-13 = -210126 3-14 = -314/37 6-11 = -210/15 7-10 = -31416 NOTES 1) Truss designed for wind loads in the plane of the truss only. For studs exposed to wind (normal to the fare). see MiTek"Standard Gable End Detail" 2) TCLL ASCE 7-05: Pt=40.0 psf (flat roof snow); Category 11, Exp B: Partially Exp , C1= 1, Lu=50-0-0 3) Unbalanced snow loads have been considered for this design. ad a lb and Job 090307 Truss A2 Truss Type ROOF TRUSS Ory 1 Ply 1 PRO -BUILD, SPOKANE WA., Kirk Opsahl • 0-0-0 3-2-7 3-2-7 2-9-9 6-0-0 2-9-9 ALDRICH Job Reference (optional) 7.050 s May 22 2008 MiTek Industnes, Inc Thu Feb 12 14 29 30 2009 Page 8-9-9 12-0-0 3-2-7 4x4 = 3 Scale = 1:25. LOADING(psf) TCLL 40.0 (Roof Snow=40.0) TCDL 80 BCLL 0.0 BCDL 10.0 SPACING 2-0-0 Plates Increase 1.15 Lumber Increase 1.15 Rep Stress Inv YES Code IRC2006/TP12002 CSI TC 0 14 BC 021 WB 0.18 (Mainz) OEFL in (Ioc) Vdef L/d Vert(LL) -0.02 5-6 >999 240 Vert(TL) -0.05 5-6 >999 180 Horz(TL) 001 5 Fifa ilia PLATES GRIP MT20 185/148 Weight 45 Ib LUMBER TOP CHORD 2 X 4 HF 1800F 1.6E BOT CHORD 2 X 4 HF 1800F 1 6E WEBS 2 X 4 DF Stud/Std BRACING TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. REACTIONS (Ib/size) 1 = 669/0-5-8 5 - 669/0-5-8 Max Horz 1 = -75(LC 5) FORCES (Ib) - Maximum Compression/Maximum Tension TOP CHORD 1-2 = -913/8 2-7 = -693/0 3-7 = -553/10 3-8 = -553/10 4-8 = -693/0 4-5 = -913/8 BOT CHORD 1-6 = -8/694 5-6 = 0/694 WEBS 2-6 = -262/56 3-6 = 0/401 4-6 = -262/56 NOTES 1) Wind. ASCE 7-05; 90mph: TCDL=4 2psf, BCDL=6.0psf h=25ft. Cat.11; Exp 6, enclosed, MWFRS (low-nse), cantilever left and nght exposed . Lumber DOL=1.33 plate gnp DOL=1.33 2) TCLL: ASCE 1-05; Pf=40.0 psf (flat roof snow); Category 11, Exp B, Pariialy Exp., Cl= 1 3) Unbalanced snow loads have been considered for this design. 4) This Truss has been designed for a 10.0 psf bottom chord live load nonconcurrenl with any other live loads. 5)' This truss has been designed for a live load of 20.Opsf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 6) This Russ is designed in accordance with the 2006 International Residential Cade sections 8502.11.1 and R802:10 2 and referenced standard ANSI/TPI 1. LOAD CASE(S) Standard 'S • Job 090307 • Truss 1310 Truss Type GABLE Ory 1 Ply 1 ALDRICH Job Reference (optmnJ PRO -BUILD, SPOickNE,WA., Kirk Opsahl 7050 s May 222008 MiTek Industries,Inc Thu Feb 12 14 29 30 2009 Page -1-04 0-0-0 4-14 8-1-8 12-3-0 13-3-8 , 1-04 4-1.8 4-0-0 4.1-8 1-0-8 , Scale: 1/2"=1 5x8 = 4-0-10 5x6 = ( 4 I�/II5 5 16 >>/I 6 VV -1 T2 f1I - L'd -� 1- 111 °' 8.00 FIT 3 T1 2 ST2 f'1 - ST1 I'D ST1 rc9 ST1 171 ST2 I^1 T 8 - t7 cIL! ILII B1 Ld LI r__1 9 e 1 MilMillM 454 = 4x4 = 0-0-0 4-14 8-1-8 12-3-0 4-1.8 4-0-0 4-14 Plate Offsets (X,Y). [4 04-0,0-0-8], [6 0-3-00-0-8] LOADING(psf) TCLL 40 0 (Roo(Snow=40.0) TCDL 8.0 BCLL 0.0 " BOOL 10.0 SPACING 2-0-0 Plates Increase 1 15 Lumber Increase 1 15 Rep Stress Incr NO Code 1RC2006/TP12002 CSI TC 0.19 BC 0 08 WB 010 (Matrix) DEFL in (loc) Vdefl Ud Vert(LL) -0 01 9 Nr 120 Vert(TL) -0 01 9 Nr 90 Horz(TL) 000 8 Ne Na PLATES GRIP MT20 185/148 Weight 47 Ib LUMBER TOP CHORD 2 X 4 HF 1800F 1 6E 4) This truss has been designed for greater of min root live load of 16.0 psf or 2 00 times flat roof 1 BOT CHORD 2 X 4 HF 1800F 1 60 of 40 0 psf on overhangs non -concurrent with other live loads. OTHERS 2 X 4 OF Stud/Std 5) Pronde adequate drainage to prevent water ponding. BRACING 6) Thts truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any othe TOP CHORD live bads Structural wood sheathing directly applied or 6-0-0 oc pudins, except 7) All plates are 2x4 MT20 unless otherwise indicated. 2-0-0 oc purlins (6-0-0 max.). 4E 8) Gable requires continuous bottom chord beanng. BOT CHORD 9) Gable studs spaced at 2-0-0 oc. Rigid ceiling directly applied or 6-0-0 oc bracing. 10)' This Miss has been designed for a We load of 20 Opsf on the bottom chord in all areas where REACTIONS Qtr/size) rectangle 3-5-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 2 = 251/124-0 11) Provide mechanical connection (by others) of truss to beanng plate capable of withstanding 29 8 = 251/12-3-0 uplift at joint 2, 38 Ib uplift at joint 8, 20 Ib uplift et joint 12, 2 Ib uplift at joint 13, 7 Ib uplift at joint 14 12 = 276/124-0 7 Ib uplift at joint 10. 13 = 209/12-3-0 12) This truss is designed in accordance with the 2006 International Residential Code sections 14 = 213/12-3-0 R502.11.1 and R802.10 2 and referenced standard ANSIITPI 1 13) Design assumes 4x2 (flat onentation) pudins at oc spacing indicated, fastened to truss TC w/ 11 = 209/12-3-0 10 = 213/12-3-0 2-106 nails Max Horz 2 = 48(LC 6) LOAD CASE(S) M2 ax Uplift 29(LC 7) Standard 8 = -38(LC 8) 12 = -20(LC 5) 13 = -2(LC 6) 14 = -7(LC 7) 10 = -7(LC 8) Max Gray 2 = 416(LC 15) 8 = 416(1G 15) 12 = 477(LC 14) 13 = 246(LC 14) 14 = 365(LC 15) 11 = 246(LC 14) 10 = 365(LC 15) FORCES (Ib) - Maximum Compression/Maximum Tension TOP CHORD 1-2 = 0/96 2-3 = -142165 3-4 = -120/42 4-15 = -9/40 5-15 = -21/39 5-16 = -21/39 6-16 = -9/40 6-7 = -120141 7-8 = -142/65 8-9 = 0/96 BOT CHORD 2-14 = -5/38 13-14 = -5/38 12-13 = -2/37 11-12 = -2/37 10-11 = -2/37 8-10 = -2/37 WEBS - 5-12 = -437/44 4-13 = -209126 3-14 4 -330/38 6-11 4 -209/14 7-10 = -330138 NOTES 1) Truss designed for wind loads in the plane of the truss only For studs exposed to wind (normal to the face), see MITek"Standard Gable End Detail" 2) TCLL ASCE 7-05; Pf=40.0 psf (flat roof snow); Category II, Exp B; Partially Exp., CI= 1, Lu=50-0-0 3) Unbalanced snow loads have been consdered for this design. ad a Ib and Job 090307 Truss B2GR Truss Type ROOF TRUSS ty Ply 2 PFO -BUILD. SPOKANE.'WA , Kirk Opsahl 0-0-0 3-4-11 3-4-11 24-13 6-1-8 24-13 ALDRICH Job Reference (optional) 7 050 s May 22 2008 MiTek Industries. Inc Thu Feb 12 14 29 31 2009 Page 8-10-5 123-0 34-11 4x6 11 3 0-0-0 3-4-11 8 7 3x6 II 9412 MT18H= 34-11 6-14 2-8-13 2-8-13 6 3x6 11 8-10-5 34-11 123-0 Scale = 1:25. Plate Offsets (X,y)'[1:04 13,EdgJ, [2 0-1-0 0-2-01, [3 0-2-4,0.2-0]x[4 0-1-0,0-2-0], [5 04-13 Edge], [6 0-4-8,0-19),,[7 0-6-0,0-4-12], [8 0-4-8 0-1-8 LOADING(psf) TCLL 40.0 (Roof Snow -40.0) TCDL 80 BCLL 00 - BCDL 10.0 SPACING 2-0-0 Plates Increase 1.15 Lumber Increase 1.15 Rep Stress Ina NO Code IRC2006/TP12002 CSI TC 0 42 BC 070 W8 0.72 (Matrix) DEFL In (loc) Vdefl Vert(LL) -0 08 7-8 >999 Vert(TL) -0 14 7-8 >999 Horz(TL) 0.05 5 n/a Lid 240 180 n/a PLATES MT20 MTI8H Weight. 121 Ib GRIP 185/148 185/148 LUMBER TOP CHORD 2 X 4 HF 1800F 1.6E BOT CHORD 2 X 6 HE 1 OOF 1.6E WEBS 2 X 4 DF 5 ud/Std *Except* W2 2 X 4 HE 1800F 1.6E WEDGE Left' 2 X 6 HF 1800F 1.6E, Right' 2 X 6 HF 1800F 1.6E BRACING TOP CHORD Structural wood sheathing directly applied or 4-9-2 oc purlins. BOT CHORD Rigid ceiling directly applied or 10-0-0 ac bracing. REACTIONS(lb/size) 1 = 7103/0-5-8 5 = 7103/0-5-8 Max Harz 1 = -75(LC 5) Max Uplift 1 = -26(LC 7) 5 = -26(LC B) FORCES (Ib) - Maximum Compression/Maximum Tension TOP CHORD 1-2 = -9280/41 2-9 = -6490/41 3-10 = -6373/53 4-10 = -6490/42 BOT CHORD 1-8 = -35/7545 7-8 = -35/7545 5-6 = -8/7545 WEBS 2-8 = 0/3240 2-7 = -2825/50 4-7 = -2825/51 4-6 = 0/3240 3-9 = -6373/53 4-5 = -9280/41 6-7 = -8/7545 3-7 = -25/6781 LOAD CASE(S) Standard 1) Snow Lumber Increase=1.15, Plate Increase=1.15 Uniform Loads (plf) Vert. 1-3=-96, 3-5 —96, 1-5=1109(F=1089) NOTES 1) 2 -ply truss to be connected together with 10d (0 1311.'61 nails as follows. Top chords connected as follows: 2 X 4 -1 row al 0-9-0 oc. Bottom chords connected as follows 2 X 6 - 2 rows at 0-4-0 ac. Webs connected as follows: 2 X 4 - 1 row at 0-9-0 oc 2) All loads are considered equally applied to all plies, except if noted as front (F) or back (B) face in the LOAD CASE(S) section. Ply to ply connections have been provided to distnbute only loads noted as (F) or}B), unless othermse indicated. 3) Wnd' ASCE 7-05, 90mph, TCDL=4 2psf, BCDL=5 Opsf; h=25X, Cat. 11, Exp 8; enclosed, MWERS (low-nse); cantilever left and nght exposed ; Lumber DOL=1 33 plate gnp DOL=1 33 4) TCLL: ASCE 7-05; Pf=40 0 psf (flat roof snow); Category 11: Exp B, Partially Exp.; Ct= 1 5) Unbalanced snow loads have been considered for this design. 6) This truss has been designed for a 10 0 psf bottom chard live load nonconcurrent with any other live loads. 7) All plates are MT20 plates unless otherwise indicated. 8)' This truss has been designed for a live load of 20 Opsf on the bottom chord In all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 9) Provide mechanical connection by others) of truss to beanng plate capable of withstanding 26 Ib uplift at joint 1 and 26 Ib uplift at joint 5. 10) This truss is designed in accordance with the 2006 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1 11) Girder camas be -In span(s). 40-0-0 from 0-0-0 m 12-3-0 Job 090307 Truss C1R Truss Type ROOF TRUSS Ory 1 Ply 1 ALDRICH Job Reference/optional) 1 PRO -BUILD. SPOKANE.WA . Kirk Oosahl 7050 s May 22 2008 MITek Industries, Inc Thu Feb 12 14 29 31 2009 Page', -1-8.2 0-0-0 2-4-14 1-8-2 24-14 5 5 14-8-5 349 -_-- 4.80 12 LOADING(psf) TCLL 400 (Roof Snow=400) TCDL 80 BCLL 00 • BCDL 10.0 SPACING 2-0-0 Plates Increase 1.15 Lumber Increase 1.15 Rep Stress Inc: VES Code IRC2006/TP12002 CSI TC 0.60 BC 0.03 WB 0.00 (Matnx) DEFL in (Ion) Vdee Lid Vert(LL) -0.00 2 >999 240 Vert(TL) -0.00 2-9 >999 180 Horz(TL) -0.00 8 n/a Na PLATES GRIP MT20 185/148 Weight. 27 Ib LUMBER TOP CHORD 2 X 4 HF 1800F 1.6E BOT CHORD 2 X 4 HF 1800F 1.6E BRACING TOP CHORD Structural wood sheathing directly applied or 2-4-14 oc purlins. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. REACTIONS (Ib/size) 8 = 137/Mechanical 2 = 407/0-10-5 9 = 20/Mechanical 3 = 175/0-5-8 4 = 384/0-5-8 6 = 384/0-5-8 7 = 329/0-5-8 Max Harz 2 - 169(LC 7) Max UpIlft 0 = -24(LC 7) 2 =i -14(LC 7) 3 =-146(LC 9) 4 = -66)10 7) 6 = -66(10 7) . 7 - -57(LC 7)' Max Gray 8 = 206(IC 2) 2 = 582(1C 9) 9 = 40(LC 4) 3 = ' 175(LC 1) 4 = 388(LC 2) 6 = 513(LC 2) ] = 494(10 2) FORCES (Ib) - Maximum CompressionlManmum Tension TOP CHORD 1-2 = 0/105 2-3 = -143/0 3-4 = -124/57 4.5 = -87/0 5-6 = -78/62 6-7 = -86/86 7-8 = -61/61 BOT CHORD 2-9 = 0)O 9) This truss 1s designed in accordance with the 2006 International Residential Code sections 8502.11.1 and R802.10.2 and referenced standard ANSI71PI 1. LOAD CASE(S) Standard NOTES 1) NAnd. ASCE 7-05; 90mph; TCDL=4 2psf, BCDL=6.0psf. h=258. Cat. II; Exp B; enclosed; MWFRS (low-rise), cantilever left and nght exposed ; Lumber 001=1.33 plate gnp DOL=1.33 2) TCLL: ASCE 7-05, Pf=40.0 psf (flat roof snow), Category II; Exp B. Partially Exp , C1= 1 3) Unbalanced snow Toads have been considered for this design. 4) This truss has been designed for greater of min roof live load of 16 0 psf or 2.00 times flat roof load of 40 0 psf on overhangs non -concurrent with other live loads. 5) This truss has been designed for a 10.0 psf bottom chord live load nonconwrrent will any other live loads. 6) • This cuss has been designed for a live load of 20 Opsf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 7) Provide mechanical connection (by others) of truss to beanng plate capable of withstanding 24 Ib uplift at joint 8, 14 Ib uplift at joint 2, 146 Ib uplift at joint 3, 66 Ib uplift at joint 4, 66 Ib uplift al tomt 6 and 57 Ib uplift at joint 7. 8) Beveled plate or shim regmred to provide full bearing surface with truss chord at joint(s) 3, 4, 6, 7. Job 090307 Truss D1SG Truss Type ROOF TRUSS Ory 1 PN 1 ALDRICH Job Reference (optional} 050 s May 222008 M'Tek Industnes, Inc Thu Feb 12 14 29 32 2009 Page PRO_BUILO, SPOKANE.WA., Krk Opsahl 7 -1-04 0-0-0 3-10-8 7-9-0 8-94 1-0-8 , 3-104 3-10-8 1-0-8 Scale = 1:18.2 4x4 = 3 8.00111 W1 12 1 T11 i Ti\ ST1 ST T. 2 I 2 4 a Jy1 >A 1 S.6 L 0-0-0 3-104 7-9-0 3-104 3-104 LOADING(psf) SPACING 2-0-0 CSI DEFL in (loc) Vdefl Lid PLATES GRIP TCLL 40.0 Plates Increase 1.15 TC 0 30 Vert(LL) -0.01 4-6 >999 240 MT20 185/148 (Roof Snow -40.0) Lumber Increase 1.15 BC 014 Vert(TL) -0.01 4-6 >999 180 TCDL 80 Rep Stress Inn NO WR 008 Horz(TL) 0.00 4 n/a n/a BCLL 0 0 ' Code 'RG2006/1P12002 (Matrix) Weight 29 Ib BCDL 10.0 LUMBER TOP CHORD 2 X 4 HF 1800F 1.6E BOT CHORD 2 X 4 HF 1800F 1.6E WEBS 2 X 4 DF Stud/Std OTHERS 2 X 4 DF Stud/Std BRACING TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. REACTIONS (Ib/size) 2 = 547/0-3-0 4 = 547/0-3-0 Max Hoa 2 - 48(LC 6) Max Uplift 2 = -26(LC 7) 4 = -26(LC 8) FORCES (Ib) - Maximum Compression/Maximum Tension TOP CHORD 1-2 = 099 2-11 = -47511 3-11 = -361/0 3-12 = -3619 4.12 = -475,13 4-5 = 099 BOT CHORD 2-6 = 0295 4-6 = 0/295 WEBS 3-6 = 0/185 NOTES 1) Truss designed for wind loads in the plane of the truss only. For studs exposed to wind (normal to the face), see MiTek -standard Gable End DetaJ' 2) TCLL. ASCE 7-05, Pf=40.0 psf (flat roof snow); Category 11, Exp 0, Partially Exp_ Ct= 1 3) Unbalanced snow Toads have been considered for this design. 4) This truss has been designed for greater of min roof live load of 16.0 psf or 2 00 times flat roof load of 40.0 psf on overhangs non -concurrent with other live Toads 5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live Toads. 6) All plates are 2x4 MT20 unless otherwise indicated. 7) Gable studs spaced at 2-0-0 0c. 8)' This truss has been designed for a live load of 20 Opsf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chard and any other members. 9) Provide mechanical connection (by others) of truss to beanng plate capable of withstanding 26 Ib uplift at joint 2 and 26 Ib uplift at joint 10) This truss is designed in accordance with the 2006 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TP11. LOAD CASE(S) Standard Job 090307 Truss D2 Truss Type ROOF TRUSS Ory 2 Ply PR6@UILD, SPOKANE,WA, Kirk Opsahl -1-04 1-04 0-0-0 3-10-8 3.10-8 4x4 = ALDRICH Job Reference (optional) 7050 s May 222008 MiTek Industries, Inc Thu Feb 121429'322009 Page 3-104 7-9-0 1-04 8-9-8 0-0-0 3-104 3-104 3-104 7-9-0 Scale = 1:18.6 LOADING(psf) TCLL 40.0 (Roof Snow^ -40.0) TCDL 8.0 BCLL 00 BCDL 10.0 SPACING 2-0-0 Plates Increase 1.15 Lumber Increase 1.15 Rep Stress Inc: VES Code IRC2006/TP12002 CSI TC 026 BC 0.12 WB 0.08 (Matnx) DEFL in (Ioc) Vdefl L/d Vert(LL) -0.01 4-6 >999 240 Vert(TL) -0.01 4-6 >999 180 Hors(TL) 000 4 rda n/a PLATES GRIP MT20 185/148 Weight. 26 Ib LUMBER TOP CHORD 2 X 4 HF 1800F 1.6E 80T CHORD 2 X 4 HF 1800F 1 6E WEBS 2 X 4 DF Stud/Std BRACING TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing REACTIONS (Ib/size) 2 = 547/0-3-0 4 - 547/0-3-0 Max Horz 2 = 48(LC 6) Max Uplift 2 = -26(LC 7) 4 = -26(LC 8) FORCES (Ib) - Maximum Compression/Maximum Tension TOP CHORD 1-2 = 0)99 2-7 = -475/0 3-7 = -361/0 3-8 = -361/0 4-8 = -475/0 4-5 = 0/99 BOT CHORD 2-6 = 0/295 4-6 = 0/295 WEBS 3-6 = 0/185 NOTES 1) Wind' ASCE 7-05, 90mph; TCDL=4.2psr. BCDL=b Opsf; h=258, Cat. ll; Exp B, enclosed; MWFRS (low-rise), cantilever left and nob! exposed, Lumber DOL=1 33 plate gnp DOL=1.33 2) TCLL' ASCE 7-05; Pf=40 0 psi (flat roof snow); Category II. Exp B, PaNaIy Exp., C1= 1 3) Unbalanced snow loads have been considered for this design. 4) This truss has been designed for greater of min roof live load of 16.0 psf or 2.00 times flat roof load of 40.0 psf on overhangs non -concurrent with other live loads. 5) This truss has been designed for a 100 psf bottom chord live load noncencurrent with any other live loads. 6) -This truss has been designed for a live load of 20 Opsf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 26 Ib uplift at joint 2 and 26 Ib uplift at joint 4. 8) This truss is designed in accordance with the 2006 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI)TPI 1. LOAD CASE(S) Standard • Job 090307 Tams D3 mss Type ROOF TRUSS 0 2 ly 1 PRO -BUILD, SPOI(ANE. A , Kth Opsa 0-0-0 3-6-0 3-6-0 ALDRICH Job Reference (optional) 7 050 s May 22 2008 MITek Industnes, Inc Thu Feb 12 14 29 33 2009 Page 3-6-0 7-0-0 4x4 = 454 = 0-0-0 3-6-0 3.6-0 3-6-0 454 = 7-0-0 JO Scale = 1:18. LOADING(psf) TCLL 400 (Roof Snow=40 0) TCDL 80 BCLL 00 • BCDL 10.0 SPACING 2-0-0 Plates Increase 1.15 Lumber Increase 1.15 Rep Stress Ina' YES Code IRC2006/1P12002 CSI TC 0.15 BC 0.09 WB 0.07 (Matnx) DEFL In (lac) I/deft L/d Vert(LL) -000 5-6 >999 240 Ven(TL) -0.01 5-6 >999 180 Horz(TL) 0.00 5 n/a n/a PLATES GRIP MT20 185/148 Weight. 27 Ib LUMBER TOP CHORD 2 X 4 HF 1800F 1.6E BOT CHORD 2 X 4 HF 1800F 1.6E WEBS 2 X 4 DF Stud/Std SLIDER Left 2 X 4 DF Stud/Std 1-11-15, Right 2 X 4 OF Stud/Std 1-11-15 BRACING TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing REACTIONS (Ib/size) 1 = 379/0-5-8 5 = 379/0-5-8 Max Horz 1 = -49(LC 5) FORCES (Ib) - Maximum Compression/Maximum Tension TOP CHORD 1-2 = -406/0 2-7 = -29710 3-7 = -285/2 3-8 = -285/0 4-8 = -29710 4-5 = -405/0 BOT CHORD 1-6 = 0/247 5-6 = 0/247 WEBS 3-6 = 0/161 NOTES 1) Wnd ASCE 7-05, 90mph, TCDL=4 2psf, BCDL=6 Opsf, h=251, Cat II; Exp B; enclosed. MWFRS (low-nse), cantilever left and nght exposed, Lumber DOL=1.33 plate gnp DOL=1 33 2) TCLL ASCE 7-05, Pf=40 0 psf (flat roof snow). Category 11. Exp B; Partially Exp.; Ct= 1 3) Unbalanced snow loads have been considered for this design. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other Irve loads 5) • This truss has been designed for a live load of 20 Opsf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chard and any other members. 6) This truss is designed in accordance with the 2006 International Residential Code sections R502 11.1 and R802.10 2 and referenced standard ANSITTPI 1. LOAD CASE(S) Standard • Job 090307 Truss E1GR Truss Type CAL HIP O 1 Ply 2 PRO-BUILO, SPOISANE.'WA , Kirk Opsahl 0-0-0 1-0.21-3-12 , 1-0-20-3-10 44-1 546-13 T 5x12 = 2 WW1 W2: ALDRICH Job Reference (oeuonal) 7.050 s May 22 2008 M,Tek Industnes, Inc Thu Feb 12 14 29 34 2009 Page 10.1.8 14-8-3 18-11419-2-1420-3-0 4-6-11 4-6-11 4-3-1 0-3-101-0-2 Scale = 1:34. 444 = 546 = W21 la1 4x4 = i11 i2 PRI ill W 2 WI D. 1==, 12 11 10 9547 = 446 = 2x4 11 0-0-0 1-0-2 1-0-2 . 4.6-11 5x7 = 7x10 = 546-13 4.6-11 10-1.8 44-11 14Aa 44-11 5x12 = r=.Tt 7 8 4x6= 2x4 11 19-2-14 20-3-0 , 1-0-2 Plate Offsets Oyy)'[1'0-0-3,0-0-6],_[2 0-6-13,0-0-12], [3 0-1-12,0-2-0],[4 0-3-0.0-3-4],-[5 0-1-12 0-2-0], [6 0-6-13,0-0-121 [7 0-0-0p-0-6], [9 0-2-12,0-24]x[11 0-2-12 0-2-4] LOADING(psf) TCLL 400 (Roof Snow=40.0) TCDL • 8.0 BCLL 0.0 BCDL 10.0 SPACING 2-0-0 Plates Increase 1.15 Lumber Increase 115 Rep Stress Ina NO Code IRC2006/TP12002 CSI TC 0.91 BC 0.69 WE 0.50 (Mainz) DEFL in (loc) Vdefl Ltd Vert(LL) -0 96 10 >248 240 Vert(11) -1.29 10 >183 180 Harz(TL) 0.07 7 n/a n/a PLATES GRIP MT20 185/148 Weight. 144 Ib LUMBER TOP CHORD 2X4HF 1 OOF 1.6E BOT CHORD 2 X 4 HF 2400F 2.0E WEBS 2 X 4 OF Stud/Std *Except' WI: 2 X 4 HF 1800F 1.6E BRACING TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins. except 2-0-0 oc purlins (2-10-13 max) 24 BOT CHORD Rigid ceiling directly applied or 10-0-0 cc bracing. REACTIONS (Ib/size) 1 = 1148/0-5-8 7 - 1148/0-5-8 Max Horz 1 = 15(LC 4) Max Uplift 1 = -42(LC 4) 7 = 42(1C 3) Max Gov 1 = 1789(LC 7) 7 = 1789(LC 7) FORCES (Ib) - Maximum Compression/Maximum Tension TOP CHORD 1-2 = -3232/59 2-3 = -9641/247 3-4 = -12337/311 4-5 = -12337/311 5-6 = -9641/247 6-7 = -3232/60 BOT CHORD 1-12 = -72/2626 11-12 = -72/2626 10-11 = -248/9632 9-10 = -241/9632 8-9 = -60/2626 7-8 = -60/2626 WEBS 2-12 = 0/363 2-11 = -184/7119 3-11 = -1281/92 3-10 = -73/2739 4-10 = -774/76 5-10 = -74/2739 5-9 = -1281/92 6-9 = -185/7119 6-8 = 0/363 10) This truss is designed in accordance vn h the 2006 International Residential Cade sections R502.11,1 and R802 10 2 and referenced s andard ANSIRPI 1 11) Design assumes 4x2 (flat onentabon) p dins at oc spaang indicated, fastened to truss TC w/ 2-10d nails. LOAD CASE(S) Standard NOTES 1) 2 -ply truss to be connected togetherwsth 10d (0 131"x3 -)nails as follows: Top chords connected as follows' 2 X 4 - 1 row at 0-9-0 oc. Bottom chords connected as follows. 2 X 4- 1 row at 0-9-0 oc. Webs connected as follows: 2 X 4 - 1 row at 0-9-0 pa 2) All loads are considered equally applied to all plies, except if noted as front (F) or back (B) face in the LOAD CASE(S) section. Py to ply connections have been provided to distnbute only loads noted as (F) or (6), unless othervnse indicated. 3) Wnd' ASCE 7-05, 90mph, TCDL=4.2psf, BCDL=6.0psf, h=258, Cat. II, Exp B; enclosed, MWFRS (low-nse); cantdevei left and right exposed , Lumber DOL=1.33 plate gnp DOL=1.33 4) TCLL: ASCE 7-05, Pf=40.0 psf (Oat roof snow). Category 11; Exp B; Partially Exp.; Cts 1, Lu=50-0-0 5) Unbalanced snow loads have been considered for this design. 6) Provide adequate drainage to prevent water ponding. 7) This truss has been designed for a 10 0 psf bottom chord live Toad nanconmrrent with any other live loads 8) ' This truss has been designed for a live load of 20.Opsf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 9) Provide mechanical connection (by others) of truss to beanng plate capable of withstanding 42 Ib uplift et joint 1 and 42 Ib uplift at joint 7. • Job 090307 Trnss E2 Truss Type CAL HIP at 1 Ply 1 ALDRICH Job Reference Materiel) PRO -BUILD, SPOKANE,WA., Kirk Opsabl 7050 s May 222008 MiTek Industries, Inc Thu Feb 12 14 29 35 2009 0-0-0 26-22-9-12 7-7-1 12-7-15 17.5.4174-14 20-3-0 2-6-2 0-3-10 4-9-5 5-0-15 4-9-5 0-3-10 2-6-2 Page Scale = 1:34.1 5x10 MT18H= 5410 MT18H= 8.00 riT 3x6 = 3x6 = 2 10c— 3 1 T51 R 4 r7., iii 11 �� Td \T4\ Wd \WZ� c FW W1 W1 6 a nlA� 1 HW1 HWt w N, �f -I os 01 8111.5 o= 9 8 7 7x8 7x 3x6 = 7x10 = 3x6 = 0-0-0 24-2 10-1-8 - 17-8-14 20-3-0 2-6-2 , 7-7-8 7-74 24-2 Plate Onsets (X,Y) [1.0-2-7 0-1-2],12 0-5-0,0.0.121,[5 0-5-0,04)121,[6 0-2-7,0-1-2) LOADING(psf) SPACING 2-0-0 C51 DEFL in (lac) Udell Ltd PLATES GRIP TOLL 40.0 Plates Increase 1.15 TC 0.74 Vert(LL) -0.38 8 >629 240 MT20 185/148 (Roof Bnaw=40.0) Lumber Increase 1.15 BC 0.78 Vert(TL) -0.52 7-8 >454 180 MT18H 185/148 TCDL 8 0 Rep Stress Inc: YES WB 0.68 Horz(TL) 0.13 6 n/a n/a BCLL 0.0 ' Code IRC2006/TP12002 (Malnx) Weight' 78 Ib BCOL 10.0 LUMBER TOP CHORD 2 X 4 HE 1800F 1 6E 10) Design assumes 4x2 (flat orientation) p dins at oc spacing indicated, fastened to truss TC w/ BOT CHORD 2 X 4 HF 1800F 1.6E WEBS 2X 4 OF Sluff/Sltl 2 -)Oe nails. WEDGE Left' 2 X 6 HF 1800F 1.6E, LOAD CASE(S) Right, 2 X 6 HF 1800F 1.6E BRACING Standard TOP CHORD Structural wood sheathing directly applied or 3-10-12 oc puffins, except 2-0-0 oc puffins (2-6-6 max ). 2-5 BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 3-9, 4-7 REACTIONS (Ibis e) 1 = 1148/0-5-8 6 - 1148/0-5-8 Max Horz 1 = -32(LC 5) Max Uplift 1 = -26(LC 6) 6 = -26(LC 5) Max Gray 1 = 1573(LC 13) 6 = 1573(LC 13) - FORCES (Ib) - Maximum Compression/Maximum Tension TOP CHORD 1-2 = -2760/32 2-10 = -2197/47 3-10 = -2197/47 3-4 = -5072/67 4-11 = -2197/47 5-11 = -2197/47 5-6 = -2760/32 BOT CHORD 1-9, = -45/2285 8-9 = -1464965 7-8 = -134/4965 6-7 = -13/2285 WEBS 2-9 = 0/1048 3-9 = -2925/133 3-8 = 0282 4-8 = 0/282 4-7 = -2925/133 5-7 = 0/1048 NOTES 1) Wind ASCE 7-05; 90mph: TCDL=4 2psf, BCDL=6 Opsf, h=25ft; Cat. ll, Exp B, enclosed, MWFRS (low-nse), cantilever left and nght exposed , Lumber DOL=1.33 plate gnp DOL=1.33 r 2) TCLL. ASCE 7-05; Pf=40.0 psf (flat roof snow); Category II, Exp B, Partially Exp ; Ole 1, Lu=50-0-0 3) Unbalanced snow loads have been considered for this design 4) Provide adequate drainage to prevent water ponding. 5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurtent with any other live loads 6) All plates are MT20 plates unless otherwise indicated. 7) -This truss has been designed for a live load of 20.Opsf on the bottom chord in all areas where a rectangle 3-6-0 fall by 2-0-0 wide will 81 between the bosom chord and any other members. 8) Provide mechanical cannecbon (by others) of tmss to beanng plate capable of withstanding 26 Ib uplift at joint 1 and 26 Ib uplift at joint 6. 9) This truss is designed in accordance with the 2006 International Residential Code sections R502.11.1 and R802.10 2 and referenced standard ANSI/TPI 1. Job 090307 Truss E3 Truss Type CAL HIP Oty 1 Ply 1 ALDRICH Job Refereecejppt,onal PRO1BUILD, SPCKANE,WA., Kid Opsahl 7 50 s May 22 2008 MITek Indusines, Inc Thu Feb 12 14 29 36 2009 Page 0-0-0 2.6-2 4-3-12' 7-7-1 12-7-15 15-114 174-14 20-0-0 2.8-2 . 1-9-10 3-3-5 5-0-15 3-3-5 1-9-10 2-6-2 Scale = 1:34.6 2x4 II 5 92x4 II 4x66 10 8.00 12 4 II 3x6 = 3x6 = I dx6 J on T1 - �� 6 X4 16 17 6 7 18 19 8 Lb 1] T3 T5 44 �W1 en \W`Z>f x+ a W4 FW2/ W7 W4 12 e A 1 w ,' -- 81 elim o 51 c = 15 14 13 5x6 - 346 = 5x9 = 3x6 = 0-0-0 26-2 10-1-0 174-14 204-0 , 2.6-2 7-7-6 7-7-8 2-6-2 Plate Offsets (X,y): 11,0-0-7,0-0-10),_(12:0-0-7,0-0-101, 11404-8,0-341 LOADING(psf) SPACING 2-0-0 C51 DEFL to (loc) Vdefl L/d PLATES GRIP TCLL 40.0 Plates Increase 1,15 TC 0.72 Vert(LL) -035 14 >681 240 MT20 185/148 (Roof Snow=40.0) Lumber Increase 1.15 BC 0.74 Vert(TL) -0 50 14-15 >479 180 TCDL 8.0 Rep Stress Inc, YES WB 067 Horz(TL) 013 12 n/a n/a BCLL 0.0 •Code IRC2006/TPI2002 (Matnx) Weight: 82 Ib BCDL 100 LUMBER TOP CHORD 2 X 4 HE 180F 1 6E 9) Design assumes 4x2 (flat orientation) pudins at oc spacing indicated. fastened to inns TC w/ 2- BOT CHORD 2 X 4 HF 1 OOF1 6E nails wEB2 X 4 DF S ud/Std OTHERS 2 %4 DE Stud/Std BRACING LOAD CASE(S) TOP CHORD . Standard Structural wood sheathin directly applied or 4-3-0 oc pudms, except 2-0-0 oc purlins (2-7-11 max.) 2-11. BOT CHORD Rigid ceding directly applied or 10-0-0 oc bracing WEBS 1 Row at mtdpt 6-15, 7-13 REACTIONS (Ib/size) 1 = 1196/0-5-8 12 = 1196/0-5-8 Max Herz 1 = 56(LC 6) Max Uplift 1 = -9(LC 6) 12 = -9(LC 5) Max Gray 1 = 140211C 13) 12 = 1402(LC 13) FORCES (Ib) - Maximum Compression/Maximum Tension TOP CHORD 1-2 = -2458/4 2-3 = -106/41 3-5 = -26/0 2-4 = -1943/48 4-16 = -1943/48 16-17 = -1943/48 6-17 = -1943/48 6-7 = -4764/35 7-18 = -1943/48 18-19 = -1943/48 8-19 = -1943/48 8-11 = -1943/48 9-10 = -27/0 -, 10-11 = -106/41 11-12 = -2458/4 BOT CHORD 1-15 = 47/2030 14-15 = -129/4658 13-14 = -90/4658 12-13 = 0/2030 WEBS 2-15 = 0/1038 6-15 = -2868/141 6-14 = 0/283 7-14 = 0/283 7-13 = -2868/140 11-13 = 0/1038 3-4 = -113/15 8-10 = -113/15 NOTES 1) Nand. ASCE 7-05, 90mph; TCD1=4.2psf; BCDL=6 Opsf; h=2511, Cat.11, Exp B, enclosed; MWFRS (Iownse); cantilever left and nght exposed, Lumber DOL=1.33 plate grip DOL=1.33 2) TCLL: ASCE 7-05: P1=40.0 psf (flat roof snow), Category II, Exp B; Partially Exp.: Ct= 1, Lu=50-0-0 3) Unbalanced snow loads have been considered for this design. 4) Provide adequate drainage to prevent water ponding. 5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 6)' This truss has been designed for a live load of 20 Opsf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members 7) Provide mechanical connection (by others) of truss to beanng plate capable of withstanding 9 Ib uplift at Joint 1 and 91b uplift at Joint 12 81 This truss is designed In accordance with the 2006 International Residential Code sections 9502 11 1 and R802.10.2 and referenced standard ANSI/TPI 1. Od Job 090307 Truss E4 Truss Type CAL HIP Otv 1 Ply 1 ALDRICH Job Reference (optional 050 s May 22 2008 PRO -BUILD, SPOKANE WA., Kirk Opsahi 7 MiTek Industries, Inc. Thu Feb 12 14 29 38 2009 Page 1 0-0-0 24.2 5-9.12 7-7-1 2-7-15 14-54 17-8-14 20-3-0 2-6-2 3-3-10 1.9.5 5-0-15 1-9-5 3-3-10 2-6-2 Scale = 1:35.2 5x12 MT18H= 5:10 MT18H= 2:4 II 2:4 II 11 4 18 19 9 CI T6 8,00 FliI,mIi L -W 4x4 -2 2x4 J 4x4 = TTI ITI � 2z4 4x4 = 2x4 II 244 II 4x4 - 110 2 T2 3 15� �� 7 �8. TM3 q 4 e �1121 T 4 rg N ' wd 1u2 W1 W1W2 -- W4 \\\/// \II_ 81 14 -es d—� s0 17 16 15 A 444 = 5x6 = 444 it: 0-0-0 2-6-2 10-1-8 17-8-14 20-3-0 24-2 7-7.6 r 7.7.6 2-6-2 Plate Offsets (X Y) [1 0-0-3 0-0-2),12 0-1-12,0-2-0),_[4 0-6-14,0-0 12],-111'0.48 0-0-81 [13 0 1-120-2-0), [14 0.0.3,0-0.2]•[16 0-3-0,0-3.4) LOADING(psf) SPACING 2-0-0 CSI DEFL In (loc) 1/deft L/d PLATES GRIP TCLL 40.0 Plates Increase 1.15 TC 0.89 Ved(LL) -0.17 16 >999 240 MT20 185/148 (Roof Snow=40.0) Lumber Increase 1.15 BC 0.46 Vert(TL) -0 2816-17 >863 180 MT18H 185/148 TCOL 8.0 Rep Stress Ina YES WB 0.72 Horz(TL) 008 14 nla n/a DCLL 0.0 • Code IRC2006/(P12002 (Matnx) Weight 104 Ib BOOL 100 LUMBER TOP CHORD 2 X 4 HE 1800F 1.6E 10) Design assumes 4:2 (flat onentatian) purlins at oc spacing indicated, fastened 10 Truss TC w/ BOT CHORD 2 X 4 HE 1800F 1 6E 2-10d nails. WEBS 2 X 4 OF Slud/Std OTHERS 2 X 4 DF Stud/Std BRACING LOAD CASE(S) TOP CHORD Standard Structural wood sheathing direcly applied or 4-10-6 oc purlins, except 2-0-0oc purlins (5-11-5 max.). 2.13, 4-11. Except' 1 Row at midpt 5-8 BOT CHORD Rigid ceiling directly applied or 10-0-0ec bracing. JOINTS 1 Brace at Jt(s): 5, 8, 3, 12 REACTIONS (Ib/size) 1 = 1148/0-5-8 14 - 1148/0-5-8 Max Horz 1 = -69(LC 5) Max Gray 1 = 1305(LC 14) 14 = 1305(LC 14) FORCES (Ib) - Maximum Compression/Maximum Tension TOP CHORD 1-2 = -2042/0 2-4 = -1223/14 2-3 = -676/11 3-5 = -686/9 5-7 = -1740/0 7-8 = -174010 8-10 = -691/14 10-12 = -691/14 12-13 = -683/13 11-13 = -1274/31 13-14 = -2045/0 4-18 = -1060/21 6-18 = -1060/21 6-19 = -1060/21 9-19 = -1060/21 9-11 = -106021 BOT CHORD 1-17 = -26/1552 16-17 = -562681 15-16 = -2/2700 14-15 = 0/1556 WEBS 2-17 = 0/575 5-17 = -1280/93 5-16 = -7/285 8-16 = -2/289 8-15 = -131750 13-15 = 0/591 6-7 = -097/64 - 9-10 = -431175 3-4 = 0/145 11-12 = -26/383 NOTES 1) Wind ASCE 7-05, 90mph, TCDL=4 2pst, BCOL=6.0ps(. h=250, Cat. 11, Exp B: enclosed, MWFRS (law-nse), cantilever left and right exposed , Lumber 00L=1 33 plate gnp DOL=1 33 2) TOLL. ASCE 7-05, Pf=40.0 psf (flat roof snow). Category II; Exp B, Partially Exp : C1= 1, Lu=50-0-0 3) Unbalanced snow loads have been considered for this design 4) Provide adequate drainage to prevent water ponding. 5) This truss has been designed for a 10 0 psf bottom chord live load nonconnxrent with any other live loads. 6) NI plates are MT20 plates unless otherwise indicated. 7) The Fabncation Tolerance at joint 4 = 0% 8) • This truss has been designed for a live load of 20.Opsf on the bottom chord in all areas where a rectangle 3-6-0 fall by 2-0-0 wide will 6t between the bottom chord and any other members. 9) This truss Is designed in accordance with the 2006 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1 Job 090307 Truss ESGR Truss Type CAL HIP Dy 1 Pro IALDRICH JobReferenceMay PRO -BUILD. SPOKANE `NA., 0-0-0 2 08 Wick Kirk Opsahl ] 050 s May 222008 MiTek Industries, Inc, Thu Feb 1214 29 37 2009 Page 1 3-8-4 6-10.107-3-12 10-14 12.1141344 16-6-12 204-0 3-8-4 3-2-5 0.5-2 2-9-12 • 2-9-12 0-5-2 3-2-5 3-84 Scale = 1:37.3 7x8 MT18H2 7x8 MT18H: 2x4 11 0 15 4,1 16 ,... 5 2 1411N1 l;\ 8.00 12 2 4x4 .- W7 WS w „ WW2 Wn W3 W2 _� 4xd W4 W1 / J PTt6 \ 5 HW77 tr v N o Bt _ r =,=-z _- ma _ VA o i 7x8* 5x7 �i 13 12 11 10 9 8 5:7* 3x6 II 7x8 = 7x8 = 5x8 MT18H= 7x8 = 3x6 11 7x8 * 0-0-0 3 84 344 3-25e 3-2-14cp'1100-14 3-2.14 134-6 3-2-5 164-12 3 8.4 20-3-0 1 Tp6--110--10�'�p 1(`F Plate Offsets (X,V), [1,Edge,0-2-7], 11 0-8-11,0.2-01, f2'0-1-4,AY9y jSFAfl3-0(, I50 -S -0,V-3 (6 0-1-4,0-2-01, (7'Edge,0-2-71. [7 0-8-11,0-2-0], Is 0-4-0.0-1-8], [90-3-8,04-01, [11 0-4-0,0-4-01, [12 0- 0-4-01 11304-0,0-1-8] LOADING(psll TCLL 40.0 (Roof Snow ---40.0) TOOL 8 0 8CLL 0.0 • BCDL 100 SPACING 2-0-0 Plates Increase 1.15 Lumber Increase 1.15 Rep Stress Inc: NO Code IRC2006/TPI2002 CSI TC 0 71 BC 063 WR 0 87 (Manx) DEFL in (lac) Ildefl Lid Vert(LL) -0.15 11-12 >999 240 Vert(TL) -0 25 11-12 >939 180 Horz(TL) 0 09 7 n/a Na PLATES GRIP MT20 185/148 MT18H 185/148 Weight. 255 Ib LUMBER TOP CHORD 2 X 4 HF 1800Fxcept• 7) This truss has been designed for a 10 0 psf bottom chord live load nonconcurrent with any othe T2' 2 X 6 HF 1800FOF l,6 1.6E live loads. BOT CHORD 2 X 6 DE 2400F 2.0E 8) All plates are MT20 plates unless otherwise indicated WEBS 2 X 4 DE Stud/Sid 9) • This truss has been designed for a live load of 20 Opst on the bottom chord in all areas where WEDGE rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. Left 2 X 8 OF 2250F 1,8E, 10) Provide mechanical connection (by others) at truss to beanng plate capable of withstanding 23/ Right. 2 X 8 DF 2250F 1 8E uplift al Joint 1 and 230 Ib uplift at pent 7 BRACING 11) This truss is designed in accordance wtth the 2006 International Residential Code sections TOP CHORD R502.11.1 and R802.10.2 and referenced standard ANSIITPI 1. Structural wood sheathing directly applied or 3-5-2 oc purlins, except 12) Girder cames be -in span(s) 30-9-0 from 0-0-0 to 20-3-0 2-0-0 oc purlins (6-0-0 max.) 3-5. 13) Design assumes 4x2 (flat orientation) purlins at oc spacing indicated, fastened to truss TC w/ BOT CHORD 2-10d nails. Rigid ceiling directly applied or 10-0-0 oc bracing. REACTIONS (Ib/size) LOAD CASE(S) 9267/0-5-8 Standard 7 = 9267/0-5-8 Max Horz 1) Snow Lumber Increase=l 15, Plate Increase=1.15 1 = -85(LC 5) Vinare Loads CO) Max UPlifl Von. 1-3=96, 3-5=96, 5-7=96, 1-7=-840(F=820) 1 =-230(LC 7) , 7 =-230(LC 8) Max Gray 1 = 9604(LC 14) 7 = 9604(LC 14) FORCES (Ib) - Maximum Compression/Maximum Tension TOP CHORD 1-14 = -13635/316 2-14 = -13513/331 2-3 = -11226/293 3-15 = -10320/269 4-15 = -10320/269 4-16 = -10320/269 5-16 = -10320269 5-6 = -11226/293 6-17 = -13513/332 7-17 = -13635/316 BOT CHORD 1-13 = -320/10938 12-13 = -320/10938 11-12 = -263/9330 - 10-11 = -217/9330 9-10 = -217,9330 8-9 = -236/10938 _ 7-8 = -236/10938 WEBS 2-13 = -502722 2-12 = -1885/88 3-12 = -101/3957 3-11 = -99/1891 4-11 = -367/184 5-11 = -99/1891 5-9 = -101/3957 6-9 = -1885/89 6-8 = -51/2722 NOTES 1) 2 -ply truss to be connected together with 10d (0 131'x3") nails as follows' Top chords connected as follows: 2 X 4 - 1 row at 0-9-0 ac, 2 X 6 - 2 rows at 0-9-0 oc Bottom chords connected as follows, 2 X 6- 2 rows at 0-7-0 oc. Webs connected as follows: 2 X 4 - 1 row at 0-9-0 oc. 2) All loads are considered equally applied to all plies, except If noted as front (F) or back (9) face in the LOAD CASE(S) section Ply to ply connections have been provided to distnbute only loads noted as (F) or (9), unless othenwse indicated. 3) Wnd. ASCE 7-05, 90mph: TCDL=4 2psf; BCDL=6.Opsf. h=25f1, Cat II, Exp B, enclosed: MWFRS (low-nse); cantilever left and nght exposed, Lumber D0L=1.33 plate gnp DOL=1.33 4) TCLL ASCE 7-05, Pf=40.0 pat (flat roof snow); Category II, Exp B, Partially Exp., Ct= 1, Lu=50-0-0 5) Unbalanced snow loads have been considered for this design. 6) Provide adequate drainage to prevent water ponding. 8 Ib Job 090307 Truss EJ1 Truss Type ROOF TRUSS Ply 1 PROIBUILD, SPOKANE.WA., Kirk Opsahl 1 -1-4-0 1-4-0 0-0-0 2-0-0 ALDRICH Job Reference (optional) 7 050 s May 22 2008 MrTek Industries, Inc. Thu Feb 12 14 29 38 2009 Page 0 2-0-02-0-1 0-0- 0-0-0 2-0-0 2-0-0 Scale =1:8.2 LOADING(psf) TCLL 40.0 (Roof Snow=40.0) TCDL 8.0 BOLL 0.0 • BCDL 100 SPACING 2-0-0 Plates Increase 1.15 Lumber Increase 1.15 Rep Stress Inv VES Code IRC2006/TPI2002 CSI TC 0.29 BC 0.03 WB 0.00 (Matnx) DEFL in (loc) I/def L/d Ven(LL) -000 2 >999 240 Ven(TL) -000 2-4 >999 180 Horz(TL) -0.00 3 n/a n/a PLATES GRIP MT20 185/148 Weight. 7 lb LUMBER TOP CHORD 2 X 4 HF 11300F 1.6E BOT CHORD 2 X 4 HF 1800F 1.6E BRACING TOP CHORD Structural wood sheathing directly applied or 2-0-0 oc pudins. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc braong. REACTIONS (Ib/size) 2 = 291/0-5-8 4 = 19/Mechanical 3 - 44/Mechanical Max Horz 2 - 43(LC 7) Max Uplift 2 = -46(LC 7) 3 - -72(LC 9) Max Gray 2 = 365(LC 9) 4 = 39(LC 4) 3 = 53(LC 2) FORCES (Ib) - Maximum Compression/Maximum Tension TOP CHORD 1-2 = 0/101 2-5 = -67/0 3-5 = -43/15 BOT CHORD 2-4 = 0/0 NOTES 1) Wnd: ASCE 7-05; 90mph. TCDL=4 2psf, BOOL=6.0psf,h=255, Cat II; Exp B, enclosed, MWFRS (tow-nse); cantilever left and nght exposed ; Lumber D0L=1.33 plate gnp DOL=1.33 2) TCLL ASCE 7-05; Pf=40 0 psf )gat roof snow), Category II, Exp B, Panialy Exp.; CI= 1 3) Unbalanced snow loads have been considered for this design. 4) This truss has been designed for greater of min roof live load of 16.0 pst or 2.00 times Bat roof toad of 40 0 psf on overhangs non -concurrent with other live loads. 5) This truss has been designed for a 10 0 psf bottom chord live load nonconcurrent with any other live loads 6)' This truss has been designed for a live load of 20 Opsf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will Flt between the bottom chord and any other members. 7) Provide mechanical connection (by others) of truss to beanng plate capable of withstanding 46 Ib uplift at Joint 2 and 72 Ib uplift at joint 3 8) This truss is designed in accordance with the 2006 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. LOAD CASE($) Standard Lb 090307 Truss EJ2 Truss Type ROOF TRUSS Oly 1 Ply 1 PRO -BUILD, SPOKANE.WA., Kirk Opsahl ALDRICH Job Roferencel pvonap 050 s May 22 2008 MiTek Industries, Inc Thu Feb 12 14 29 38 2009 Page 0-0-0 2-0-0 2-0-0 Scale = 1:13 LOADING(psf) TCLL 400 (Roof Snow=40.0) TCDL 8.0 8CLL 00 • BCDL 10 0 SPACING 2-0-0 Plates Increase 1.15 Lumber Increase 1.15 Rep Stress Ina YES Code IRC2006/fP12002 CSI TC 037 BC 003 WB 0.00 (Matnx) DEFL in (loc) Vdeg L/d Vert(LL) -0.00 2 >999 240 Ven(TL) -0.00 2-4 >999 180 Horz(TL) -0.00 3 n/a n/a PLATES GRIP MT20 185/148 Weight 101b LUMBER TOP CHORD 2 X 4 HF 1 OOF 1 6E BOT CHORD 2 X 4 HF 1800F 1 6E BRACING TOP CHORD Structural wood sheathing directly applied or 2-0-0 oc purlins. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. REACTIONS (Ib/size) 3 = 190/Mechanical 2 = 384/0-5-8 4 = 19/Mechanical Max Horz 2 = 70(LC 7) Max Uplift 3 = -34(LC 7) 2 = -47(LC 7) Max Gray 3 = 230(LC 2) 2 = 401(LC 2) 4 = 39(LC 4) FORCES (Ib) - Maximum Compression/Maximum Tension TOP CHORD 1-2 = 0/101 2-5 = -11443 3-5 = -23/82 BOT CHORD 2-4 = ON NOTES 1) Wind: ASCE 7-05, 90mph; TCDL=4.2psf, BCDL=6 Opst; h=25ft; Cat. II; Exp 0, enclosed; MWFRS (low-nse), cantilever left and nght exposed Lumber DOL=1 33 plate grip DOL=1.33 2) TCLL: ASCE 7-05, Pf=40 0 psf (flat roof snow), Category II, Exp B; Parbaly Exp., C1= 1 3) Unbalanced snow loads have been considered for this design. 4) This truss has been designed for greater of min roof live load of 16 0 psf or 2.00 times flat roof load of 40,0 psf on overhangs non -concurrent with other live loads. 5) This truss has been designed for a 100 psf bottom chord live Toad nenconcurrent with any other live loads 6)' This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will Bt between the bottom chord and any other members. 7) Provide mechanical connection (by others) of truss to beanng plate capable of withstanding 34 Ib uplift at Joint 3 and 47 Ib uplift at joint 2. 8) This buss is designed in accordance vnlh the 2006 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSITPI 1. LOAD CASE(5) Standard Job 090307 Truss EJ3 Truss Type ROOF TRUSS Ory Ply 1 PRO -BUILD, SPOKANE,WA., Kirk Opsahl -1-4-0 4 0-0-0 1-4-0 2-0-0 2-0-0 ALDRICH Job Reference (optional) 7 050 s May 22 2008 MrTek Industries, Inc Thu Feb 12 14 29 38 2009 Page 54-1 7-4 1 Ul Scale = 1:19. LOAOING(pst) TCLL 40.0 (Roof Snow -40.0) TCOL 80 BCLL 00 BCOL 10.0 SPACING 2-0-0 Plates Increase 1 15 Lumber Increase 1 15 Rep Stress Inc: VES Code IRC2006/TP12002 CS! TC 0.66 BC 0.03 WB 0.00 (Manx) DEFL in )loc) I/defl L/d Vert(LL) -000 2 >999 240 Vert(TL) -0 00 2-5 >999 180 Horz(TL) -0 00 4 n/a n/a PLATES GRIP MT20 185/148 Weight. 14 Ib LUMBER TOP CHORD 2 X 4 HF 1800F 1.6E BOT CHORD 2 X 4 HF 1800F 1.6E BRACING TOP CHORD Structural wood sheathing directly applied or 2-0-0 oc purlins BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. REACTIONS (Ib/size) 4 = - 64/Mechanical 2 = 443/0-5-8 5 = 19/Mechanical 3 = 323/0-5-8 Max Hoa 2 = 98(LC 7) Max Uplift 2 = 3 = Max Grate 4 = 2 = 3 = -12(LC 7) -43(LC 7) -61(LC 7) 85(LC 2) 459)LC 2) 39(LC 4) 402(LC 2) FORCES Iib) - Maximum Compression/Maximum Tension TOP CHORD 1-2 = 0/101 2-6 = -140/0 3-6 = 47/112 3-4 = 30)30 BOT CHORD 2-5 = 0/0 NOTES 1) Wtnd' ASCE 7-05, 90mph, TCDL=4 2ps1, BCOL=6.0psf, h=2511, Cat 11, Exp B, enclosed; MWFRS (law-nse), cantilever left and nghl exposed ; Lumber DOL=1 33 plate gnp DOL=1.33 2) TCLL' ASCE 7-05, Pf=40.0 psf )flat roof snow), Category 11, Exp 0, Partially Exp., CI= 1 3) Unbalanced snow loads have been considered for this design 4) This truss has been designed far greaser of min roof live load of 16 0 psf or 2.00 times flat roof load of 40.0 psf on overhangs non -concurrent with other live loads 5) This truss has been designed for a 10 0 psf bottom chord live load nonconcurrent with any other live loads. 6) • This truss has been designed for a live load of 20 Opsf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 7) Provide mechanical connection (by others) of truss to beanng plate capable of withstanding 12 Ib uplift at joint 4, 43 Ib uplift at joint 2 and 61 Ib uplift at joint 3. 8) Beveled plate or shim required to provide hill bearing surface vfth truss chord al loint(s) 3 9) This truss is deagned in accordance with the 2006 International Residential Code sections R502.11.1 and R802,10.2 and referenced standard ANSI/TPI 1. LOAD CASES) Standard Job 090307 Truss EJ4 Truss Type ROOF TRUSS 0 Ply PRO -BUILD, SPOKANE WA , Kirk Opsahl -14-0 0-0-0 14-0 2-0-0 2-0-0 8-0-1 ALDRICH Job Reference (optional) 7.050 s May 22 2008 MiTek lndustnes, Inc. Thu Feb 12 14 29 39 2009 Page 10-0-1 2 132 1 Ix1 2x4 = 0-0-0 2-0-0 6.00 12 5 2-0-0 ti Scale = 1.24. LOAOING(psf TCLL 40.0 (Roof Snow=40.0) TCOL 80 BCLL 0.0 SCOL 10.0 SPACING 2-0-0 Plates Increase 1.15 Lumber Increase 1.15 Rep Stress Incr YES Code IRC2006/TP12002 CSI TC 0.58 BC 003 WB 000 (Matnx) DEFL in (lac) I/defl L/d . Vert(LL) -0 00 2 >999 240 Vert(TL) -0.00 2-5 >999 180 H0rz(TL) -000 4 n/a n/a PLATES GRIP MT20 185/148 Weight: 17 Ib LUMBER TOP CHORD 2 X 4 HF 1800F 1.6E BOT CHORD 2 X 4 HF 1800F 1.6E BRACING TOP CHORD Structural wood sheathing directly applied or 2-0-0 oc purlins. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. REACTIONS (Ib/size) 4 = 192/Mechanical 2 = 443/0-5-8 5 = 19/Mechanical 3 = 451/0-5-8 Max Harz 2 = 127(LC 7) Max Uplift 4 = -37(LC 7) 2 = -28(LC 7) 3 = -86(10 7) Max Gmv 4 T. 268(LC 2) 2 = 444(LC 2) 5 = 39(LC 4) 3 = 552(LC 2) FORCES (Ib) - Maximum Compression/Maximum Tension TOP CHORD 1-2 = 0/101 2-6 = -92/0 3-6 = -73/94 3-4 = -96/96 BOT CHORD 2-5 = 0/9 - NOTES 1) Wnd ASCE 7-05, 90mph; TCDL=4.2psf, BCDL=6 Opsf, h=2511; Cat. II; Exp B, enclosed, MWF RS (low-nse); cantilever left and nght exposed , Lumber DOL=1 33 plate gip DOL=1.33 2) TOLL. ASCE 7-05, Pf=40 0 psi (flat roof snow); Category II, Exp B: Partially Exp., Ct= 1 3) Unbalanced snow loads have been considered for this design. 4) This truss has been designed for greater of min roof live load of 16 0 psf or 2 00 times flat roof load of 40.0 psf on overhangs non -concurrent with other live loads 5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 6)' This truss has been designed for a live load of 20.Opsf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will 8l between the bottom chord and any other members. 7) Provide mechanical connection (by others) of truss to beanng plate capable of withstanding 37 Ib uplift al Joint 4, 28 Ib uplift at joint 2 and 86 Ib uplift at joint 3 8) Beveled plate or shim required to provide hill beanng surface with truss chord al joint(s) 3. 9) This truss is designed in accordance with the 2006 International Residential Cade sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. LOAD CASE(S) Standard Job 090307 Truss FIG Truss Type GABLE Ory 2 PIY 1 ALDRICH Job Reference (notional) PRO -BUILD, SPOKANE WA., Kirk Opsahl -14-00-0-0 14-23 1-4-0 14-2-4 11-7-8 7.050 a May 22 2008 MiTek Industries, Inc Thu Feb 12 14 29 40 2009 Page 25-9-1239-9-0 r 13.11-4 Z , 5x6 = 6.00 PI 12 10 11 493 140 15 T4 W Scale = 1:70.: Cf) 1- 5x6 c ' 01 16 51 H2 1614 20 0 m r. a 448 T1 - n 2 ST:15 �/� 5 fi ST11 3x6 9 a 6 7 / / - ST7 ST9 B3 9 T3 x 515 ST3 _ ST1 - ST1 _ ST1 ST1 151 ST1 - ST2 5T/ 21 - i\2 ST6 578 - 82 3x6 0 23 24 ST1027 W CO m F- 0 9 25 n I 26 T2 4 2 I SII �i2\\8 1 i 3x6 =• 47 46 45 44 43 42 41 40 39 38 37 36 35 34 33 32 31 30 29 3x6 = 5x6= 5x6= 0-0-0 14-24 25-9-12 39-9-0 14.23 11.74 1 13-114 Plate Offsets (X,1) (6 0-1-9,Edge] [11 0-3-0,0-241, [18 0-2-15,0-2-8],(36 0-3-0,0-3-0]. ]4043-0,0-3-0] LOADING(psQ TCLL 40.0 (Roof Snovr-40.0) TCDL 80 BCLL 00 •Code BCOL 10.0 SPACING 2-0-0 Plates Increase 1.15 Lumber Increase 1.15 Rep Stress !nor NO IRC2006/TPI2002 CSI TC 031 BC 0.14 WB 0.30 (Matnx) DEFL in (Ioc) I/defl Lid Vert(a) 0.0018-19 n/r 120 Vert(TL) 0 00 18-19 n/r 90 Horz(TL) 000 28 n/a n/a PLATES GRIP MT20 185/148 Weight: 217 Ib LUMBER - TOP CHORD 2 X 4 HF 1800F 1.6E BOT CHORD 2 X 4 HF 1800F 1.6E ' Max Grav OTHERS 2 X 4 OF Stud/Std 28 = 149(LC 15) BRACING 38 = 362(LC 14) TOP CHORD 39 = 360(LC 14) Structural wood sheathing directly applied or6-0-0 oc purlins, except 40 = 375(LC 14) 2-0-0 oc purlins (6-0-0 max ). 11-18 41 = - 360(LC 15) BOT CHORD 42 = 367(LC 15) Rigid ceding directly appbed or 10-0-0 oc braang. 43 = 361(LC 15) 44 = 364(LC 15) REACTIONS (Ib/size) 45 = 357(LC 15) 2 = 283/39-9-0 46 4. 383(LC 15) 28 = 96/39-9-0 47 = 275(LC 15) 38 = 232/39-9-0 37 = 362(LC 14) 39 = 228/39-9-0 36 = 379(LC 14) 40 = 244/39-9-0 35 = 342(LC 15) 41 = 249/39-9-0 34 = 371(LC 15) 42 = 230/39-9-0 33 = 360(LC 15) 43 = 232/39-9-0 32 = 362(LC 15) 44 = 233/39-9-0 31 = 364(LC 15) 45 = 229/39-9-0 30 = 354(LC 15) 46 = 244/39-9-0 29 = 392(LC 15) 47 = 181/39-9-0 37 = 232/39-9-0 FORCES (Ib) - Maximum Compressmn/Maximum Tension 36 = 241/39-9-0 TOP CHORD 35 = 252/39-9-0 1-2 = 0/100 2-3 = -118/30 3-48 = -104/28 34 = 231/39-9-0 4-48 = -58/40 4-5 = -109/43 5-6 4. -108/46 33 = 232/39-9-0 6-7 = -21/51 7-8 = -108/63 8-9 = -108/78 32 = 232/39-9-0 9-10 = -110/93 10-11 = -108/85 11-12 = -30/0 31 = 233/39-9-0 1149 = -33/94 13-49 = -43/94 13-50 = -30/93 30 4. 227/39-9-0 14-50 = -30/93 14-15 = -30/93 15-16 = -30/93 29 = 251/39-9-0 16-51 = -30/93 51-52 = -3053 17-52 = -30/93 Max Harz 17-53 = -32/94 18-53 = -28/94 16-19 = -30/0 2 = 76(LC 7) 16-20 = -99/84 20-21 = -107/92 21-22 = -103/68 Max Uplift 22-23 = -104/45 23-24 = -6/45 24-25 = -104/20 2 = -24(LC 5) 25-26 = -104/45 26-54 = -32/43 27-54 = -105/0 38 = -2(LC 6) 27-28 = -101/52 39 = -6(LC 5) BOT CHORD 40 = -3(LC 6) 2-47 = 0/63 46-47 = 0/63 45-46 = 0/63 42 = -16(LC 7) 4445 = 0/63 43-44 4- 0/63 4243 = 0/63 43 = -13(LC 7) 4142 = 0/63 40-41 = 0/63 3940 = 0/63 44 = -13(LC 7) 38-39 = 0/63 37-38 = 0/63 36-37 = 0/63 45 = -11(LC 7) 35-36 = 0/63 34-35 = 0/63 33-34 = 0/63 46 = -19(LC 7) 32-33 = 0/63 31-32 = 0/83 _ 30-31 = 0/63 47 = -52(LC 9) 29-30 = 0/63 28-29 = 0/63 37 = -2(LC 5) WEBS 36 = -4(LC 5) 15-38 = -322/26 14-39 4. -322/29 1340 = -335/27 34 = -13(LC 8) 1041 = -318/11 9-42 = -327/40 843 = -321/37 33 4- -13(LC 8) 744 = -323/37 5-45 = -319/36 4-46 = -333/40 32 = -13(LC 8) 347 = -276/27 16-37 = -320/27 17-36 = -339/28 31 = -13(LC 8) 20-35 = -304/0 21-34 = -331/37 22-33 = -320/37 30 = -12(LC 8) 23-32 = -322/37 25-31 = -322/37 26-30 = -320/37 29 - -20(LC 8) 27-29 = -329/42 Max Grav 2 = 460(LC 15) Continued on .a.e 2 Job 090307 Trus Truss Type GABLE O 2 Ply 1 PRO -BUILD, SPOKANE WA.. KM Opsa NOTES 1) Truss designed for wind loads in the plane of the truss only. For studs exposed to wind (normal to the face), see MiTek "Standard Gable End Detail" 2) TOLL ASCE 7-05, Pf=40.0 psf (flat roof snow); Category II, Exp 8, Partially Exp ; Ct= 1, Lu=50-0-0 3) Unbalanced snow loads have been considered for this design. 4) This truss has been designed for greater of min roof live load of 16.0 psf or 2.00 times flat roof load of 40.0 psf on overhangs non -concurrent math other live bads. 5) Provide adequate drainage to prevent water ponding. 6) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 7) All plates are 2x4 MT20 unless otherwise indicated 8) Gable requires continuous bottom chord beanng 9) Gable studs spaced at 2-0-0 oc. 10)' This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will 11 between the bottom chord and any other members. 11) Provide mechanical connection (by others) of truss to beanng plate capable of withstanding 24 Ib uplift at tont 2, 2 Ib uplift at joint 38, 6 Ib uplift at joint 39, 3 Ib uplift at Joint 40, 16 Ib uplift at Joint 42, 13 Ib uplift at lout 43, 13 Ib uplift at Joint 44, 11 Ib uplift at Joint 45, 19 Ib uplift at Joint 46, 52 Ib uplift at Joint 47, 2 Ib uplift a1 Joint 37, 41b uplift at joint 36, 13 Ib uplift at Joint 34, 13 Ib uplift a1;ont 33, 13 Ib uplift at Joint 32, 13 Ib uplift at joint 31, 12 Ib uplift at Joint 30 and 201b uplift at Joint 29 12) This truss is designed in accordance with the 2006 International Residential Code sections R502 11.1 and R8132.10.2 and referenced standard ANSI/TPI 1. 13) Design assumes 4x2 (flat onentauon) purlins at oc spacing indicated, fastened to truss TC w/ 2-10d nails. LOAD CASE(S) Standard ALDRICH Job Reference (option J 7.050 s May 22 2008 MiTek Industnes. Inc Thu Feb 12 14 29 40 2009 Page 2 Job 090307 Truss F2 Truss Type CAL HIP Ory 1 Ply 1 ALDRICH Job Reference (optional) PRO -BUILD, SPOKANE; NA., KiM1 Opsahl 7. 50 s May 22 2000 MITek Induslnes, Inc Thu Feb 12 14 29 41 2009 Page -14-00-0-0 5-04 95.15 14-2-4 17-3-12 20-0-0 22-84 25-9-12 30.6-1 34-11-12 39-9-0 ,14-0 5-0-4 4-5-12 4-8-5 3-1-8 . 2-8-4 , 2-84 . 3-1-8 44-5 4-5-12 4-94 0 Scale = 1:70.5 z 6.0012 W 1p 5x9 * Ali ST113 0 5x9 1x64 628 D 8 4 T5 d1 14 - , - 4x4 c:.- F— 29 T] 1x6cz, dx4 G 6 1'7 0W 4 5 y> 15 16 W7 ] I Wd W69 \//2 SUmn Wt T2 17 ~ en 2 \ W5/ w 31 (}/// ✓✓ B4 _ B2 R3 Jo i.-1 459 = 25 24 23 32 22 33 21 20 19 7x8 = 7x101112x16 MT18H= 454= 5x9 WB= 3x9= 4x4= 454= 4x4 = 5x9 WB= 0-0-0 7-3-1 14-2-4 20-0-0 25-9-12 324-15 39-9-0 7-3-1 6-114 5-9-12 5-9.12 6-11-3 , 7-0-1 Plate Offsets (XX). [2.0-35,EdgeJL[2 (3-64,Edge), [6 0-4-8,0-1-1 I. [14 0-4-8 0-1-12), [18:0-2-11,Edgel, [18'1-0-11,Edge] LOADING(psf) SPACING 2-0-0 CSI DEFL In (roc) I/deft Lid PLATES GRIP TCLL 40.0 Plates Increase 1.15 TC 085 Vert(LL) -0 50 22-24 >946 240 MT20 185/148 (Roof Snovr--40.0) Lumber Increase 1.15 BC 0.91 Vert(TL) -0 72 22-24 >658 180 MT18H 185/148 TCDL 80 Rep Stress Ina YES WB 0.76 Horz(TL) 0.30 18 n/a n/a BCLL 0.0 Code IRC2006/TPI2002 (Mainz) Weight 212 Ib BCDL 10.0 LUMBER TOP CHORD 2 X 4 HF 1800F 1.6E 3) Unbalanced snow loads have been considered for this design. BOT CHORD 2 X 4 HF 1800F 1.6E 4) This truss has been designed for greater of min roof live load of 16 0 psf or 2.00 times flat roof lc WEBS 2 X 4 DF Slud/Std of 40 0 psf an overhangs non -concurrent with other live loads. OTHERS 2 X 4 DF Stud/Std 5) Provide adequate drainage to prevent water ponding WEDGE 6) This truss has been designed for a 100 psf bottom chord live load nonconcurrent with any other Left 2 X 8 DF 2250F 1.8E, live loads. Right: 2 X 12 DF No.2 7) All plates are MT20 plates unless otherwise indicated. BRACING 8) All plates are 2x4 MT20 unless othewse indicated. TOP CHORD 9) • This truss has been designed for a live load of 20 Opst on the bottom chord in all areas where i Structural wood sheathing directly applied or 2-2-0 oc pudins. except rectangle 3-6-0 tall by 2-0-0 wide will fl between the bottom chord and any other members. 2-0-0 oc purlins (3-1-0 max.). 6-14. 10) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 5I BOT CHORD uplift at Joint 2. Rigid ceiling directly applied or 10-0-0 oc bracing. 11) This truss is designed in accordance with the 2006 International Residential Code sections WEBS R502.11 1 and R802 10.2 and referenced standard ANSIRPI 1. 1 Row at midpt 6-22, 14-22 12) Design assumes 4x2 (flat onentation) purlins at 0c spacing indicated, fastened to truss TC w/ JOINTS 2-10d nails. 1 Brace at Jt(s) 8, 11 REACTIONS (Ib/size) LOAD CASE(S) 2 = 2583/0-5-8 ' Standard 18 = 2429/0-5-8 Max Harz 2 = 90(LC 7) Max Uplift 2 = -5(LC 7) Max Gray 2 = 3443(LC 15) 18 = 3300(LC 15) FORCES (Ib) - Maximum Compression/Maximum Tension TOP CHORD 1-2 = 0/103 2-26 = -6383/0 3-26 = -6242/0 3-27 = -5904/0 4-27 = -5734/0 4-5 = -4809/0 5-28 = -4507/0 6-28 = -4474/0 6-7 = -140/52 7-9 = -26/0 6-8 = -4398/0 8-10 = -4398/0 10-11 = -4398/0 11-14 = 4398/0 12-13 = -26/0 13-14 = -140/52 14-29 = -4473/0 15-29 = -4601/0 15-16 = -4775/0 16-30 = -5598/0 17-30 = -5767/0 17-31 = -6071/0 18-31 = -6206/0 BOT CHORD 2-25 = 0/5509 24-25 = 0/4872 23-24 = (3/4193 23-32 = 0/4193 22-32 = 0/4193 22-33 = 0/4164 . 21-33 = 0/4164 20-21 = 0/4164 19-20 = 0/4794 . 18-19 = 0/5291 WEBS 3-25 = -555/73 4-25 = 0/606 4-24 = -944/56 6-24 = 0/890 6-22 = -122/909 10-22 = -843/71 14-22 = -105/918 14-20 = 0/839 16-20 = -876/62 16-19 = 0/501 17-19 = -415/80 7-8 = -194/22 ' 11-13 = -194/22 NOTES 1) Pond. ASCE 7-05, 90mph, TCDL=4,2psf, BCDL=6.Opsf, h=25ft, Cat. II, Exp B, enclosed; MWFRS (low-nse), cantilever left and nght exposed, Lumber DOL=1.33 plate grip DCL=1.33 2) TOLL: ASCE 7-05; Pf=40.0 psi (flat roof snow); Category II; Exp 8, Partially Exp., Ct= 1, Lu=50-0-0 1 ad • Job Truss Truss Type Qty Ply ALDRICH 090307 F2A CAL HIP 1 1 Job Deference (rit�ional) -8UIW, SPOKANE.VJA., RIM1 opsa -14-0 0-0-0 .14-0. 5-0-4 5-0-4 4-5-12 9-5-15 14-24 17-3-12 20-0-0 22-84 25-9-12 4-8-5 . 3-14 . 2-84 , 2-84 . 3-1-8 . 4-114 3x6 * 454 5 4 6.00 Fri 459 — 2x4 u 7511 S�2idll 61,33 254 11 24 10 TS 2x4 11 ST113 459 = 14 T425 0 30-9-0 Z W Scale = 1:56 th2 H M G1 0 W m 556 15 N 3 2x4 -` T1 EV1 2 g 457 = 7x8 = 0-0-0 7-3-1 21 454 = 7-3-1 6-11-3 20 19 26 454 = 4x6 = 14-24 5-9-12 18 4x9 = 20-0-0 27 5-9-12 17 454 = 25-9-12 4-11-4 16 454 11 30-94 i4 Plate Offsets (X,fl [2 0-7-0,0-0-01]2:0-0-0,0-0-4],[6 0-3-8,0-0-8] 114 0-3-8,0-0-81[15 Edge 0-1-12],[16 Edge,0-3-8],[17'0-1-12,0-1-1 LOADING(psi) TCLL 400 (Roof Snow=40 0) TCDL 8.0 BCLL 0.0 BCDL 10.0 SPACING 2-0-0 Plates Increase 1.15 Lumber Increase 1 15 Rep Stress Inv VES Code IRC2006/fPI2002 CSI TC 0.68 BC 0.72 WB 0.87 (Matnx) DEFL in (Ioc) I/def Lid Vert(LL) -0 23 18-20 >999 240 Vert(TL) -0 36 20-21 >999 180 Horz(TL) 012 16 n/a n/a PLATES GRIP MT20 185/148 Weight: 174 Ib 1 LUMBER TOP CHORD 2 X 4 HF 1800F 1.6E BOT CHORD 2 X 4 HF 1800F 1 6E WEBS 2 X 4 OF Stud/Std 'Except' EV1' 2 X 4 HF 1800F 1 6E OTHERS 2 X 4 OF Stud/Std WEDGE Leff: 2 X 6 HF 1800F 1 6E BRACING TOP CHORD Structural wood sheathing directly applied or 2-9-12 oc purlins, except end verticals, and 2-0-0 oc purlins (4-5-5 max.) 6-14. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 6-18,14-17, 15-16 JOINTS 1 Brace at Jt(s): 8, 11 REACTIONS (Ib/size) 2 = 2022/0-5-8 16 = 1956/Mechanical Max Horz 2 - 154(LC 7) Max Uplift 2 = -20(LC 7) Max Gray 2 = 2699(LC 15) 16 = 2472(LC 15) FORCES (Ib) - Maximum Compression/Maximum Tension TOP CHORD 1-2 = 0/103 2-22 = -4810/0 3-22 = -4670/0 3-4 = 4319/0 4-5 = -3168/0 5-6 = -2866/0 6-7 = -141/51 7-9 = -21/0 6-8 = -2310/25 8-23 = -2310/25 23-24 = -2310/25 10-24 = -2310/25 10-11 = -2310/25 11-14 = -2310/25 12-13 = -26/0 13-14 = -146/46 14-25 = -1456/0 15-25 = -1759/0 15-16 = -2423/0 BOT CHORD 2-21 = -67/4122 20-21 = -35/3438 19-20 = 0/2704 19-26 = 02704 18-26 = 0/2704 18-27 = 0/1482 17-27 = 0/1482 16-17 = -2/55 WEBS 3-21 = -599/72 4-21 = 0/646 4-20 = -1021/54 5-20 = 0/940 6-18 = -629/186 10-18 = -838/70 14-18 = -4/1351 14-17 = -1205/38 7-8 = -193/22 11-13 = -182/21 15-17 = 0/1972 5) Provide adequate drainage to prevent water ponding 6) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads 7) • This truss has been designed for a live load of 20 Opsf on the bottom chord in all areas where rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members 8) Provide mechanical connection (by others) of truss to beanng plate capable of withstanding 201 uplift at joint 2. 9) This truss is designed in accordance with the 2006 International Residential Code sections R502.11.1 and R802 10 2 and referenced standard ANSI/TPI 1. 10) Design assumes 4x2 (flat onentation) purlins at oc spaung indicated, fastened to truss TC w/ 2-10d nails. LOAD CASE(S) Standard NOTES 1) Wnd' ASCE 7-05; 90mph; TCDL=4.2psf, 9CDL=6 Opsf; h=25ft, Cat. II; Exp B; enclosed, MWFRS (low-nse), cantilever left and nght exposed , Lumber D0L=1.33 plate gnp DOL=1 33 2) TCLL. ASCE 7-05, Pf=40.0 psf (Oat roof snow), Category II, Exp B, Partially Exp ; Ct= 1. Lu=560-0 3) Unbalanced snow loads have been considered for this design 4) This truss has been designed for greater of min root live load of 16 0 psf or 2.00 times flat roof load of 40 0 psf on overhangs non -comment with other live loads. • Job 090307 Truss F3 Truss Type ROOF TRUSS Div 3 PW 1 ALDRICH . Job Reference (optional) 1 PRCBUILD_ SPOK NEWA. Kt rk Oosahl 7 050 s May 222008 MiTeI Industnes,Inc Thu Feb 12 14 29 43 2009 Page fl -14-00-0-0 1-4-0 7-0-5 7-0-5 6-5-13 13-8-3 6-5-13 20-0-0 6-5-13 26-5- 3 6-5-13 32-11.11 7-0-5 40-0-0041 4-0 3x6 i 244 0 4 3 6.00 FIT 17 444 i 111 5x8 MT18H= 6 \ 444 T,1 7 8 Scale = 1.69. W6 WI \W3 W3 /1.4b 0-0-0 10-3-4 16 19 454 = 10-3-4 15 14 5x9 WB= 4x9 = 9-8-12 20-0-0 13 549 WB= 9-8-12 20 12 444 = 29-8-12 10-34 40-0-0 Plate Offsets (X.Y) [2 04-9, Edge], 110 0-4-9 Edge] LOADING(psf) TCLL 40.0 (Roof Snow=40 0) TCDL 80 BCLL 0.0 BCDL 10.0 SPACING 2-0-0 Plates Increase 1.15 Lumber Increase 1.15 Rep Stress Inc YES Code IRC2006/TP12002 CSI TC 0 82 BC 0.99 W8 083 (Matnx) DEFL in (lac) I/defl Lid Vert(LL) -0 52 12-14 >909 240 Vert(TL) -0.84 12-14 >562 180 Horz(TL) 0 23 10 n/a n/a PLATES GRIP MT20 185/148 MT18H 185/148 Weight 173 Ib LUMBER TOP CHORD 2 X 4 HF 1800F 1.6E BOT CHORD 2 X 4 HF 1800F 1 6E WEBS 2 X 4 OF Slud/Std BRACING TOP CHORD Structural wood sheathing directly applied or 2-2-0 oc pudtns. BOT CHORD Rigid ceiling directly applied ort -2-0 oc bracing. WEBS 1 Raw at midpt 5-14,7-14 REACTIONS (Ib/size) 2 = 2596/0-5-8 10 = 2596/0-5-8 Max Harz 2 = -95(LC 8) Max Uplift 2 = -13(LC 7) 10 = -13(LC 8) FORCES (Ib) - Maximum Compressmn/Maximum Tension TOP CHORD 1-2 = 0/103 2-3 = 4641/0 3-4 = -4186/0 4-17 = 4040/0 5-17 = -3931/0 5-6 = -2960/15 6-7 = -2960/15 7-18 5 -3931/0 8-18 = 4040/0 8-9 = -4186/0 9-10 = -4641/0 10-11 = 0/103 BOT CHORD 2-16 = 0/3994 16-19 = 0/3273 15-19 = 0/3273 14-15 = 0/3273 13-14 = 0/3273 13-20 = 0/3273 12-20 = 0/3273 10-12 = 0/3994 WEBS 3-16 = -550/107 5-16 = 0/791 5-14 = -1327/86 6-14 = 0/1890 7-14 = -1327/86 7-12 = 0/791 9-12 = -550/107 NOTES 1) Wind ASCE 7-05; 90mph, TCDL=4 2psf, BCDL=6.0psf. h=25ft, Cat. ll; Exp B, enclosed; MWFRS low-nse), cantilever left and nght exposed , Lumber DOL=1.33 plate gnp DOL=1 33 2) TCLL: ASCE 7-05; Pf=40 0 psf (fiat roof snow); Category 11; Exp B; Partially Exp.; Ct= 1 3) Unbalanced snow loads have been considered for this design 4) This truss has been designed for greater of min roof live load of 16 0 psf or 2.00 times flat roof load of 40.0 psf on overhangs non-conwrrent with other live loads. 5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 6) All plates are MT20 plates unless otherwise indicated. 7) • This truss has been designed for a live load of 20 Opst on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 8) Provide mechanical connection (by others) of truss to beanng plate capable of withstanding 13 Ib uplift at joint 2 and 13 Ib uplift attaint 10. 9) This truss is designed in accordance with the 2006 International Residenttal Code sections R502.11.1 and 9802.10 2 and referenced standard ANSI/TPI 1 LOAD CASE(S) Standard Job Truss 090307 F3A PRO -BUILD, SPOKANE A., Kirk Opsahl -14-00-0-0 7-0-5 Truss Type ROOF TRUSS Qty Ply 5 7-0-5 6-5-13 13-6-3 6-5-13 3x6 6.00 12 20-0-0 5x8 MT18H= 6 6-5-13 ALDRICH Job Reference op0onal) 7 050 s May 22 2008 MpTek Industnes, Inc Thu Feb 12 14 29 43 2009 Page 26-5 13 32-11-11 6-5-13 6-9-5 3x6 39-9-0 Z Scale= W fn S 1- tM 0 W 1- H N 0-0-0 10-34 4x4 = 10-3-4 5x9 WB= 9-0.12 13 3x8 = 20-0-0 12 5x9 WB= 9.8-12 19 11 4x4 = 29-8-12 10-0-4 6x16 MT18Ha 39-9-0 69.6 Plate 0 set (X,V). [2.0-1-9,Edgek[10 0-1-5,Edge] LOADING(psf) TCLL 40.0 (Roof Snow=40 0) TCDL 8.0 BCLL 0.0 BCDL 100 SPACING 2-0-0 Plates Increase 1.15 Lumber Increase 1.15 Rep Stress Inc YES Code IRC2005/TPI2002 CSI TO 0.64 BC 1.00 WB 0.83 (Matrix) DEFL in (lac) VdeB L/d Vert(LL) -0.52 13-15 >909 240 Vert(TL) -0 84 13-15 >563 180 Horz(TL) 0 23 10 n/a n/a PLATES GRIP MT20 185/148 MT18H 185/148 Weight. 170 Ib LUMBER TOP CHORD 2 X 4 HF 1800F 1 6E BOT CHORD 2 X 4 HF 1B00F 1.6E WEBS 2 X 4 DF Stud/Std BRACING TOP CHORD Structural wood sheathing directly applied or 2-2-0 oc purlins. BOT CHORD Rigid ceiling directly applied or 2-2-0 oc braong. WEBS 1 Row at midpl 5-13, 7-13 REACTIONS (Ib/size) 2 = 2591/0-5-8 10 = 2436/Mechanical Max Horz 2 - 101(LC 7) Max Uplift 2 = -13(LC 7) FORCES Ib) - Maximum Compression/Maximum Tension TOP CHORD 1-2 = 0/103 2-3 = -4631/0 3-4 = -4175/0 4-16 = 4030/0 5-16 = -3892/0 5-6 = -2949/17 6-7 = -2949/16 7-17 = -3904/0 8-17 = 4012/0 8-9 = -4159/0 9-10 = -4573/0 BOT CHORD 2-15 = -1/3985 15-18 = 0/3263 14-18 = 0/3263 13-14 = 0/3263 12-13 = 0/3255 12-19 = 0/3255 11-19 = 0/3255 10-11 = 0/3950 WEBS 3-15 = -550/107 5-15 = 0/792 5-13 = -1299/86 6-13 = 0/1880 7-13 = -1316/89 7-11 = 0/775 9-11 = -522/111 NOTES 1) Wmd ASCE 7-05, 90mph, TCOL=4 2psf, BCDL=6 Opsf, h=25X, Cat. II, Exp B: enclosed, MWFRS Qow-nse), cantilever left and nght exposed; Lumber DOL=1.33 plate gnp DOL=1 33 2) TCLL ASCE 7-05, Pf=40.0 psf (flat roof snow), Category II; Exp R, Parbaly Exp.; Ct= 1 3) Unbalanced snow loads have been considered for this design 4) This truss has been designed for greater of min roof live load of 16 0 psf or 2.00 limes flat roof load of 40.0 psf on overhangs non -concurrent with other live loads. 5) This truss has been designed for a 10 0 psf bottom chord live load nonconcurrent wth any other live loads. 6) All plates are MT20 plates unless otherMse indicated. 7) • This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 8) Provide mechanical connection (by others) of truss to beanng plate capable of withstanding 13 Ib uplift at pint 2. 9) This truss is designed in accordance wth the 2006 International Residential Code sections R502.11.1 and R802 10.2 and referenced standard ANSI/TPI 1. LOAD CASE(S) Standard Job 090307 Truss F3B Truss Type ROOF TRUSS City 9 Ply 1 ALDRICH Job Reference (optional) PRO -BUILD, SPOKANE, WA., Kirk Opsahl 7 050 s May 22 2008 -14-0 1-4-0 -0 7-0-5 7 5 6-5-13 13-6-3 6-5-13 20-0-0 5-2-12 MiTek Industnes, Inc Thu Feb 12 14 29 44 25-2-12 5-64 W 30-9-0 2009 Page 4x6 = N Scale = 1:60. 2 I- 6 6.00 12 M 0) 4x4 C ❑ 4x4-> 14 7 W L1 04 CD 5 m 3x6 9 G. I— 5x6 C W6 CO 8 4 2x40 Wd W7 3 W1 W3 W2\ E1 T2 2 BVI \ / \ d1 B1 j /� e R 9 J 5x9 = 13 16 12 11 17 10 4x4 = 4x7 = 3x8 = 4x4 = tied II 0-0-0 10-34 103430 9-8-12 20.0 0 5.1.12 9 -0 25-2-12 5-6-4 1 Plate OR sets (X,`fl:[2.0-1-15,Edge]L[6 0-3-0 0-2.4),[8 Edge,0-241, [9 Edge,0.3-8] LOADING(psf) SPACING 2-0-0 CSI DEFL in (lac) I/dell L/d PLATES GRIP TOLL 400 Plates Increase 1.15 TO 091 Vert(LL) -0.3711-13 >993 240 MT20 185/148 (Roof Snow -40.0) Lumber Increase 1.15 BC 0.90 Vert(TL) -0.62 11-13 >592 180 TCDL 80 Rep Stress Ina YES WB 086 Horz(TL) 009 9 nia n/a BCLL 00 ' Code IRC2006/TP12002 (Mainz) Weight 156 Ib BCDL 10.0 LUMBER TOP CHORD 2 X 4 HF 1800F 1 6E BOT CHORD 2 X 4 HF 1800F 1.6E WEBS 2 X 4 DF Stud/Std -Except' EV1: 2 X 4 HF 1800F 1 6E BRACING TOP CHORD Structural wood sheathing directly applied or 3-1-3 ec purlins, except end verticals. BOT CHORD Rigid ceiling directly applied or 10-0-0 lac bracing. WEBS 1 Row at midpi 5-11 REACTIONS (Ib/size) 2 = 2020/0-5-8 9 = 1906/Mechanical Max Harz 2 = 165(LC 7) Max Uplift 2 = -25(LC 7) FORCES (Ib) - Maximum Compression/Maximum Tension TOP CHORD 1-2 = 0/103 2-3 = -3405/0 3-4 = -2944/0 4-5 = -2800/0 5-14 = -1682/10 6-14 = -1539/32 6-7 = -1645/45 7-15 = -1291/8 8-15 = -1437/0 8-9 = -1841/0 BOT CHORD 2-13 = -86/2899 13-16 = -37/2149 12-16 = -37/2149 11-12 = -37/2149 11-17 = 0/1186 10-17 = 0/1186 9-10 = -2/51 WEBS 3-13 = -570/106 5-13 = 0/825 5-11 = -1186/84 6-11 = 0/807 7-11 = 0/504 7-10 = -871/40 8-10 = 0/1512 NOTES 1) Wnd, ASCE 7-05; 9omph; TCDL=4.2psf. BCDL=6.Opsf, h=25ft, Cat. II; Exp 8, enclosed, MWFRS (Iow-nse), cantilever left and ngbt exposed ; Lumber DOL=1.33 plate grip DOL=1 33 2) TCLL. ASCE 7-05; Pf=40 0 psf (gat roof snow); Category II; Exp B, Partially Exp.; Cts 1 3) Unbalanced snow loads have been considered for this design. 4) This bass has been designed for greater of min roof live load of 16 0 psf or 2.00 times flat roof load of 40.0 psf on overhangs non -concurrent wah other live loads. 5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 6) - This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will (11 between the bottom chord and any other members. 7) Provide mechanical connection (by others) of wss to beanng plate capable of withstanding 25 Ib uplift at joint 2. 8) This truss is designed in accordance with the 2006 International Residential Code sections R502 11 1 and R802 10 2 and referenced standard ANSI/TPI 1. LOAD CASE(S) Standard Job 090307 Truss J1 Truss Type MONO TRUSS PRO -BUILD, SPOKANE.WA, IBrk OpsaN -1-4-0 1-4-0 0-0-0 Qty Ply 5 1 4-0-0 ALDRICH Job Reference (optional) 7 050 s May 22 2088 MiTek Industries, Inc Thu Feb 12 14 29 44 2009 Pape 2x4 4-0-0 3 Scale =1:12 LOADING(psf) TOLL 400 (Roof Snow --40.0) TCDL 80 BCLL 0.0 BCDL 10.0 SPACING 2-0-0 Plates Increase 1.15 Lumber Increase 1.15 Rep Stress Incr YES Code IRC2006/TP12002 05I TC 0.37 BC 0.10 WB 0.00 (Matnx) DEFL in (loc) I/deft Lid Vert(LL) -001 2-4 >999 240 Vert(TL) -0.02 2-4 >999 180 Horz(T1) 0.00 n/a n/a PLATES GRIP MT20 185/148 Weight 14 Ib LUMBER TOP CHORD 2 X 4 HF 1600F 1.6E BOT CHORD 2 X 4 HF 1800F 1.6E WEBS 2 X4 DF Stud/Std BRACING TOP CHORD Structural wood sheathing directly applied or 4-0-0 oc purlins, except end vemcals BOT CHORD Rigid ceiling directly applied or 10-0-0 oc braong REACTIONS (Ib/size) 2 = 393/0-5-8 4 = 178/Mechanical Max Hon 2 = 63(LC 7) Max Uplift 4 Max Gray 2 = 4 = -41(LC 7) -3(LC 7) 407(LC 2) 208(1C 2) FORCES Ib)- Maximum Compression/Maximum Tension TOP CHORD 1-2 = 0/103 2-5 = -10540 3-5 = -33/62 3-4 = -172/30 BOT CHORD 2-4 = 0/0 NOTES 1) NAnd: ASCE 7-05, 90mph, TCDL=4.2psf, BCDL=6 Ops, h=25ft, Cat. ll, Exp B, enclosed, MWERS (low-rise): cantilever left and nght exposed , Lumber DOL=1.33 plate gnp DOL=1.33 2) TCLL' ASCE 7-05, Pf=40.0 psf (flat roof snow), Category II; Exp B; Partially Exp , Ct= 1 3) Unbalanced snow loads have been considered for this design 4) This Truss has been designed for greater of min roof live load of 16 0 psf or 2.00 times flat roof load of 40.0 psf on overhangs non -concurrent with other live loads 5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 6)' This truss has been designed for a live Toad of 20 Opsf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chard and any other members. 7) Provide mechanical connection (by others) of truss to beanng plate capable of withstanding 41 Ib uplift al Joint 2 and 3 Ib uplift at Joint 4. 8) This muss is designed in accordance with the 2006 International Residential Code sections R502 11.1 and R802.102 and referenced standard ANSI/TPI 1. LOAD CASE(S) Standard Job 090307 TN SS J2 Truss Type ROOF TRUSS Oty 6 Ply 1 ALDRICH Job Reference (opuonal) MiTek Industries, Inc 2-0-0 Thu Feb 12 14 29 45 2009 Page 4-0-0 t PRO -BUILD, 140 SPOKANE, WA , KIM Opsahl 1-4-0 000 2-0-0 3 200 7. 50 s May 22 2008 / Scale = 1:8.6 6.00 12 5 2 TB nlL B1 _ c _ I — \/ 1 4 2x4 = 0-0-0 2-0-0 2-0-0 LOADING(psf) SPACING 2-0-0 CSI DEFL in goo) Vdel Lid PLATES GRIP TCLL 40 0 Plates Increase 1 15 TC 0 29 Ved(LL) -0 01 2-4 >999 240 MT20 185/148 (Root Snow=400) Lumber Increase 1.15 BC 0.12 Vert(TL) -0.03 2-4 >999 180 TCDL BO Rep Stress Ino YES WB 0.00 Horz(TL) -0.00 3 Na Na BCLL OA ' Code IR02006/TPI2002 (Matnx) Weight' 91b BCDL 10.0 LUMBER TOP CHORD 2 X 4 HF 1800F 1 6E BOT CHORD 2 X 4 HF 1800F 1.6E BRACING TOP CHORD Structural wood sheathing directly applied or 2-0-0 oc purlins BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. REACTIONS (Ib/size) 2 = 312/0-5-8 4 = 39/Mechanical 3 = 46/Mechanical Max Hord 2 = 43(LC 7) May Uplift 2 = -34(LC 7) 3 = -71(LC 9) Max Gray 2 = 383(LC 9) 4 = 78(LC 4) 3 = 55(LC 2) FORCES (Ib) - Maximum Compression/Maximum Tension TOP CHORD 1-2 = 0/101 2-5 = -68/0 3-5 = -43/16 BOT CHORD 2-4 = 0/0 NOTES 1) Wnd. ASCE 7-05; 90mph, TCDL=4.2psf; 8COL=6 Opsf, h=25ft; Cat II. Exp B; enclosed, MWFRS (low-nse); cantilever left and nght exposed; Lumber DOL=1.33 plate grip DOL=1 33 2) TOLL ASCE 7-05, Pf=40.0 psf (flat roof snow), Category II, Exp B; Partially Exp ; Ct= 1 3) Unbalanced snow loads have been considered for this design 4) This truss has been designed for greater of min root live load of 16.0 psf or 2.00 times flat roof load of 40 0 psi on overhangs non -concurrent with other live loads. 5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 6) * This truss has been designed for a live load of 20.0psf on the bottom chard in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members 7) Provide mechanical connec8on (by others) of truss to beanng plate capable of withstanding 34 Ib uplift at Joint 2 and 71 Ib uplift at loin) 3. 8) This truss is designed In accordance with the 2006 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. LOAD CASE(S) Standard