2014, 06-24 Permit App: BLD-2014-1479 Patio CoverSpokane
_#Valley=
Community Development Department
Permit Center .
11703 East Sprague Avenue, Suite B-3
Spokane Valley, WA 99206
Tel: (509) 720-2540
Fax: (509) 688-0037
permitcenter@spokanevalley.org
(Staff Use Only)
PERMIT NUMBER:
PERMIT FEE:
RESIDENTIAL CONSTRUCTION PERMIT APPLICATION
❑ NEW CONSTRUCTION gl ADDITION/REMODEL ❑ ACCESSORY BUILDING
❑ OTHER
❑ DECK
SITE ADDRESS: I P
S. Moon 5+
ASSESSORS PARCEL NO.: 55 14 (3 10 5 LEGAL DESCRIPTION:
BUILDING OWNER NAME: A .y, - • c.
NAME:
4 ,1- Potl
.: aa
RECEIVED
JUN 24 2014
ADDRESS:
/� 1 ( 0 M CSV PFRnn:T CENTER
CITY: ar6Gn GS STATE: \'✓(A ZIP: 0I
PHONE: 50c L(7 S (3 7 \ FAX:
CONTACT NAME: L, )4C 14c c r 1
CE
PHONE: 57)o c 066, o et FAX:
CONTRACTOR NAME: Sky li'nr Oct k
i
MAILING ADDRESS:
CELL: a06 77 a65 -5-
(0r5 f-roL-+00 h
List{% N aft123-
CITY:
dt,n
STATE:
PHONE:
(9
ZIP:
FAX: CELL:
CONTRACTOR LICENSE No.:
EXPIRES: CITY BUSINESS LICENSE NO.:
DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE & PROPOSED USE:
****YOU MUST COMPLETE THE FOLLOWING****
RK N/A IF NOT APPLICABLE
Height to Peak:
Dimensions: / r
No. of Stories:
Total HabitableM-
Main Floor SQ FT:____--
Upper Floor SQ FT:
Unfinished Basement SQ
FT: r—
Finished Basement SQ
FT:
Garage SQ FT:
Deck/Covered patio SQ
FT: 3 Sl
Impervious Surface
Area: ,
30% Slopes on
Property:
No. of Bedrooms:
Construction Type: NE‘A/
Heat Source: Ater
Sewer or Septic: Sc vv Le
TOTAL COST OF PROJECT: $ L/QQ()
DISCLAIMER
The permitted verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction or on a dwelling, the dwelling Is/will
be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property
owner or has permission to represent the property owner In this transaction. 4) All construction Is to be done In full compliance with the City of
Spokane Valley Development code Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of
Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional
Information may be required t su. i ed and .sequently approved before this application can be processed.
Signature
Date:
Updated 1-11-11
C:\Users\Owner\Downloads\Res_Permit.doc
Page 1 of 1
Project 2oi qz i ii1
RECEIVED
JUN 2 5 2014
CSV PERMIT CENTER
SUB # \ REV. #
I
--/r3 3- Moen tt .
FILE
j Val ley
REVIEWED FOR CODE COMPLIANCE
SPOKAN L Y BUILDIN DIVISIO
4)1 / ::a.
/rise'' •
Kai
Reaction
LL =155 lbs
DL =77.5 lbs
TL =232.5 lbs
30pIf LL
15pIf DL
•
10'-04"
1
•
Min bearing =.0 in
Based on the 2012 IBC/IRC
Based on top edge having continuous lateral support.
Increase in allowable for duration of load =15%
BENDING
ALLOWED = 21760.9 inch/lbs
ACTUAL = 7207.5 inch/lbs
Bending ratio = 33.1% of the allowable
Bending OK
SHEAR: - No increase used
ALLOWED = 1834.3 pounds
ACTUAL = 205.3 pounds
Shear ratio = 11 2% of the allowable
Shear OK
•
Reaction
LL =155 lbs
DL =77.5 lbs
TL =232.5 lbs
Min Bearing =.0 in
DEFLECTION:
L/180 =.6889
U240 =.5167
L/360 =.3444
L/480 =.2583
Total Load Deflection = .1102" - L/1126
Live Load Deflection = .0734" - U1689
Dsddht®d D.1}fl mtiomf= .0734" - U1689
Report created using
Plan Analyst software
by Ben Weese and Associates
www PlanAnalyst.com
City of Spokane Valley
Permit
11707 E Sprague
509-720-5309
IIIHIIIIIUIIIIIIIIII
IIuIIIIIIuIINIHhIIuuIuIIIIIIIflhIIIIUI
I
I
I
1+1—
•i c-
t
P
421
6.1
Rinirliggill
; NTER
\
I
, s
=omen!
j
r
IMEMEISITEILIMENZERVISERIMESMila
mummummEmemommovamiummmzEmmum
NENEW
MEOW
•
1-4•
---i-
HE
NEME
ABM
_
PEINIPI
c
Min
1
-
millINNNIAmm
El
MISR
II
_
-
-IIMININEIRESEMiffil
IVRECIMEMIL
,psumusormanisam
MI
1
NI MO
-
‘
WM
rEl
MEI
hilL•
WIN
rr4'
IMN111
=
IM-
1MI
Elatlifffl,
i
l
0MiBE
'E
siItI
llllUllhllUhU•UhlllllUlUlhllUhlllUlhlhlECM
I
II
IM
IL
aid
111II
IIII
NM
111
-
UN
11
lialidirgati
11
a
11M
l•
M
MI
ME
I
7
IMt1IM
I
RU
f.
IIMA•M
I
WI
SMTE1EM1M1
EiR
MMREM
1,1
NIEI
RMMINT_MEASIBIE-
EAN
•WDE
iia
FKEMEM
ML
111
IN
v c)
NEIIl
II
11.1...
''
al111111
•lhlhlhhhllhllhlhllIl..0El11
EMI
RI
WA
FA
OM
FA
EN
111%
ME
MEM
ISM
II
NI
IhlUlhllhIll
ig
hIlhlhhlhllhhlUhlIlliU
NM
FM
F
1
I
1il
.Illl
Pl11'INMM21
llhllll
1
441il
ii
MiEM
•
:i
il
tintl
i
R,
I
i•
1
I
BMS
Md•
i1/I
iIi
.1
-•
----TMff
11111111
M
ME
ME
TIEIlI
llllhlhllhhhllhhlllhMI
hllllhllIllhIlllhUlllhhI
lllhlllhlllllUlhlllhh•
llhhhhlhhhllhllhllll
\
II•llllhhlhlhllhlllhhllhl
itllhhhhhhlhlhlllhlllUllI
II
d
imenaminim
111111•
hill
hill
hill1111111111111,-
EVINEVE
.
i
.
lIhlU•lhlllllhhllhl
11
1111
1111111111::.
111111'
' -)
MIN
.•1.111MEI"
1111
111;:
IIIIUII
1111111
hIllmk
,:intimms-
hlIlIhIllh
1111
1111
I.IU•II
lhlllL.
WS.
11111111
111111
hiUhhlIlhllII,
IMO
-
.
miumm
hIlhllllhlhll
0
EMP.M_
meow
IMMERSEI
.
-
m-
m-
E-
at,EMIhlllhhlhlh!!!IllhllhIh
NENE
iiiiimummta
LISLIMMESIMI
I
lIhhlIhIl
MERWEEMn
.........,..MNffi_Or,IO,,-N.T.,ENLrrRI,M..rMWEt
mmmmummmamBura
mnehAmM=mmmErNm=
mI
mi
iiinTraffiriii
EiriliITSITEMEEM
ZST
i
ilr
aW....u.%-m-i
EMM
I
111
lhl 111
hlh
.11
;hlhI1!
111 1
111
MI
NM
:11
IIllUhlhlIIllUhlhlhhhfl
MUM
I
I
id
hlhllllhhhlUhlUlI
NE
E
I
,
MI
11
1111
a
IllIlhllUhhllhII
WIRMII
'OHM
LEIRECEME
-c--
•WACIELVECIE
LI
WA
II
ININENign
ei
IR
IMMENIMIll
1
inalall
;-,llIPtl
lIhlllhlIlhII
umemenrinma-
min
EN
Ki
in
II
ME
Ill
Ill
MIS
II
111111•1111
11111.111
WM
AS
NJ
I
on
MENE111llIIltIIlIlllllIhlhIn
iii
NM
`-'
OMR
111111REMEN•MIN
11111
NERSINTAMMINTI
111
II1
,-
EH
ME
EN
--)
EMU
`-i
111111
I
I
I
I
II
igir4111112
FINIE
I
li
n
:
.cmni
i
En
GE
inummui
limom
•u
I
II
MIEMILINIERIII
I
IR
111
hlh
INN
mon
--111
IIill•l•lhii.I
mi
immillop
1h111111111
LI
IMO
It
4
hi.._
11
iimmainsmorm
III
Hz--
11
lhlh
hUIlhUlhllhIE1
lIlhi1iiIllhI
PI
iri
1.11,
IR
1•1M-PZI
,...
.
I
IiIIIIIIIIIII
IIIVi
in..
E111
Irmi
NT
I
FL
SHEET NO. OF
& Construction
CALCULATED BY DATE
Idaho Office: 208.660.8977
Washington Office: 509.570.6192 CHECKED BY DATE
Email: d.deckit@yahoo.com WA#SKYLIDC890J7
www.skylinedeck.com SCALE