Loading...
2007, 01-25 Permit: 07000357 SewerSPOKANE COUNTY DEPARTMENT OF BUILDING & PLANNING SroFaV 1026 WEST BROADWAY AVENUE • SPOKANE, WA 99260-0050 1 Site Information Project Information 1 Site Address: 7217 E MONTGOMERY AVE Parcel Number: 35121.6253 Subdivision: EDGERTON. OIST ADD Block: Lot: 15 Zoning: UNK Unknown Owner: MORRIS, DAVIT) Address: PO BOX 75145 WESTHILL CALGARY, AB TC31-13M1 Building Inspector: Water Dist: Project Number: 07000357 Inv: 1 Issue Date: 1/25/2007 Permit Use: SEWER CONNECTION - EDGERTON 1ST ADD Applicant: ANDERSON. STEPHEN 8424 E BULL PINE SPOKANE, WA 99217 Contact: ANDERSON. STEPHEN 8424 E BULL PINE SPOKANE. WA 99217 Setbacks - Front: Left: Right: Group Name: Project Name: Phone: (509) 990-5340 Phone: (509) 990-5340 Rear: Permits Sewer Connection Permit Contractor: H & S CONSTRUCTIONS'' License #: IISCON''123KF SEWER CONNECTION 1 $85.00 PROCESSING FEE 1 $15 00 Total Permit Fee: $100.00 FOR SEWER INSPECTIONS CALL TIIE UTILITIES DEPT/v.1/(502)477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT 1ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. A[ THE INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO TIIE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFIGATION`INSfALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TOtANY-OTT TER EXCAVATION. SEWER STUBS ARE TO 13E CHECKED PRIOR TO CONNECTION TO ENSURE Ti IAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED TO TI -IE MAIN. SEWER LINES SI IOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF-THEIiSnwTRUw'-CTUflRE1. l THE INSTALLER AND TITIS PERMIT MUST BE PRESENT1AT THETJOB SITE•A"l TFIE SCHEDULED INSPECTION TIME BOTI-1 STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES TI IF. INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES! I 111 1111 1111 111 CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKINGDAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES TIIE INSTALLER COMPLY'WITH ALL'REQiUIIREMENfS'OFI T HEpWATSTATE DEPT OF LABOR & INDUSTRIES. INCLUDING TI IOSE RELATED TO TRFNCFI,SAFE'ITY_ j � t'& A y J j\ 11 1 Payment Summary Total Fees AmountPaid AmountOwing $100.00 $100.00 $0.00 Tran Date Receipt # Payment Amt Amt 1/25/2007 317 $100.00 Processed By: CUMMINGS. KATI IY Printed By: Lemlcy. Linda Page I of I PERMIT NOTICE It is the responsibility of the applicant/permittee to see to it that the use described on the front of this permit complies with applicable codes and requirements and that required inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before progressing beyond the point where inspections are required may necessitate removal of certain parts of the construction at the applicant's/permittee's or property owner's expense. At a minimum, the following inspections ARE REQUIRED by County Code: 1. FOOTING - when forms and reinforcement are in place and prior to placement of concrete—all structures, including manufactured homes. NOTE: This inspection includes review of the structure's setbacks from property lines. Minimum setbacks are established by County zoning regulations. Typically, side and rear yard setbacks are measured from property lines, while setbacks for yards abutting streets are measured from the property line or the center line of the roadway right-of-way, whichever provides the greater setback from the center line of the roadway right-of- way. Curb lines and fence lines are not necessarily indicative of property lines. In some residential areas, the County can own as much as 20 feet of right-of-way between your property and the actual improved street/curb. The responsibility to comply with applicable setback provisions lies solely with the permittee—neither Spokane County nor its authorized representatives assume any responsibility for the verification or location of your property lines. Please verity their location prior to locating your structure Failure to properly locate the structure may require its relocation at the owner's/permittee's expense. 2. FOUNDATION - when forms and reinforcement are in place and prior to placement of concrete. 3 FRAMING - after all framing, bracing and blocking is in place, and prior to concealing. 4. INSULATION - prior to the installation of drywall. 5 PLUMBING - after rough -in, before covering, and final. 6 MECHANICAL - rough -in of piping, before covering, metal chimneys before concealment, and final. 7. FINAL - when complete and prior to occupancy and/or use. Please provide 24 -hours notice. All permits require final inspection. NOTE: In addition to inspection of the structure, this inspection includes review of site Improvements (typically depicted on the approved site plan) required by ordinance or as a condition of approval of this permit. Items such as the installation of fire hydrants, fire department access, on-site drainage ("208 swales"), road improvements, parking, and landscaping are common requirements of a permit/site plan which must be completed prior to final approval of a building or issuance of a Certificate of Occupancy. 8. MANUFACTURED HOMES - Final inspection required when complete, stairs, handrails, skirting, etc. installed, and prior to occupancy; completed inspection record card must be available on site. Manufactured 1-lomes must comply with the manufacturer's installation instructions. 9. SEWERS - prior to cover ,10. RIGHT-OF-WAY/APPROACH - prior to placement of concrete, or, if gravel approach, after completion. In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc., must be inspected prior to cover. Check with the department for "special inspections" in conjunction with commercial projects. FOR INSPECTIONS: TO INSURE PROMPT SERVICE, PLEASE GIVE ONE WORKING DAY/24-HOUR NOTICE PARTS OF YOUR PROJECT MAY REQUIRE PERMITS AND INSPECTIONS FROM MORE THAN ONE AGENCY. • Building, plumbing, mechanical and fire inspections, Department of Building & Planning 477-3675 • Construction in a flood plain, Division of Engineering & Roads 477-3600 • Electrical wiring, State Department of Labor and Industries 324-2640 • On-site waste disposal system, Spokane Regional Health District 324-1560 • Road cuts for utilities or driveways, Division of Engineering & Roads - 48-HOUR NOTICE REQUIRED 477-3600 or State Department of Transportation 456-3000 • Sewer connection, Division of Utilities 477-3604 or City Public Works Department 625-6300 PERMIT EXPIRATION AND REFUNDS Unless otherwise noted, this permit will be considered null and void by limitation if the work authorized by the permit is not commenced or is stopped for a period of 180 days, unless a written request for an extension of the permit is received and approved by the Building Official prior to expiration. At a minimum an inspection should be requested at least once every 180 days to assure the validity of the permit. A permit may be renewed within one year of the date of expiration for one-half the original fee, subject to certain limitations—please call us if you have any questions. All refund requests must be made in writing by the applicant/permittee (shown on the reverse) no later than 180 days atter the date of tee payment. Refunds of not more than 80% of the permit fee paid may be authorized when no work has been done under the permit. No refunds may be authorized more than 180 days after fee payment. MISTAKE? If you think we've made an error in processing this permit or in conducting inspections pertaining to it, or find erroneous information in the permit, please bring it to our attention immediately by filing a written request for correction within 10 working days of discovery. All such requests should be directed to the Department of Building and Planning at the below address. Spokane County Department of Building & Planning 1026 West Broadway Avenue Spokane, WA 99260 Phone: (509) 477-3675 Fax: (509) 477-4703 TDD: (509) 477-7133 FORM 30-050202 BLDG PERMIT